M/S Ellis Fashion Exports Private Limited v. M/S the Bangalore Metro Rail Corporation Limited
- Court
- High Court of Karnataka
- Date of judgment
- 2 November 2026
- Judge
- Justice Suraj Govindaraj
- Case number
- WP No. 5093 of 2025
- Result
- Partly Allowed
- Acts & sections
- Article 300A Constitution, Article 226 Constitution
Full judgment
-1HC-KAR
®
IN THE HIGH COURT OF KARNATAKA AT BENGALURU DATED THIS THE 2ND DAY OF NOVEMBER, 2026 BEFORE THE HON'BLE MR. JUSTICE SURAJ GOVINDARAJ WRIT PETITION NO. 5093 OF 2025 (GM-RES) BETWEEN M/S ELLIS FASHION EXPORTS PRIVATE LIMITED A COMPANY REGISTERED UNDER THE COMPANIES ACT, 1956, HAVING ITS REGISTERED OFFICE AT NO.29, WHITE HOUSE, 3RD FLOOR, ST. MARKS ROAD, BENGALURU 560 001, REPRESENTED BY ITS MANAGING DIRECTOR SRI. JITENDRA D MAJETHIA. AGED ABOUT 75 YEARS ... PETITIONER (BY SRI. RAJENDRA S., ADVOCATE)
AND 1. M/S THE BANGALORE METRO RAIL CORPORATION LIMITED REGISTERED OFFICE AT BMTC COMPLEX, 3RD FLOOR, K.H. ROAD, SHANTHI NAGAR, BENGALURU - 560 027. REPRESENTED BY ITS MANAGING DIRECTOR. 2. ADDITIONAL CHIEF ENGINEER (CIVIL)/R5/P3 BANGALORE METRO RAIL CORPORATION LIMITED, REGISTERED OFFICE AT BMTC COMPLEX, 3RD FLOOR, K.H. ROAD, SHANTHI NAGAR, BENGALURU - 560 027. 3. GENERAL MANAGER, (LA AND A), BANGALORE METRO RAIL CORPORATION LIMITED, REGISTERED OFFICE AT BMTC COMPLEX, 3RD FLOOR, K.H. ROAD, SHANTHI NAGAR,
-2HC-KAR
BENGALURU - 560 027. …. RESPONDENTS (BY SRI. HARISH NARASIMHA MURTHY., ADVOCATE FOR R1 TO R3) THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227 OF THE CONSTITUTION OF INDIA PRAYING TO ISSUE A WRIT OF MANDAMUS OR ANY OTHER APPROPRIATE WRIT , ORDER OR DIRECTION, DECLARING THAT THE PROVISIONS OF THE WAY LEAVE POLICY OF THE RESPONDENTS PRODUCED AND MARKED AS ANNEXURE-C BEARING NO. BMRCL/LAQ/WLP/5132/2022-23 INCLUDING ITS UNILATERAL TERMINATION CLAUSE ARE UNCONSTITUTIONAL, INVALID AND UNENFORCEABLE AND ETC. THIS WRIT PETITION COMING ON FOR ORDERS AND HAVING BEEN RESERVED FOR ORDERS ON 17.08.2026, THIS DAY, THE COURT PRONOUNCED THE FOLLOWING: CORAM: HON'BLE MR. JUSTICE SURAJ GOVINDARAJ
CAV ORDER 1.
The Petitioner is before this Court seeking for the following reliefs:
a. A writ of mandamus or any other appropriate writ, order, or direction, declaring that the provisions of the Way Leave Policy of the Respondents produced and marked as Annexure-C bearing No. BMRCL/LAQ/WLP/5132/2022-23 including its unilateral termination clause are unconstitutional, invalid, and unenforceable. b. A writ of mandamus or any other appropriate writ, order, or direction to the Respondents to provide, forthwith and on a permanent basis, an unrestricted 6 meter
-3HC-KAR
wide entry and a 6 meter wide exit to the Schedule Property from the northern side, free of cost, along with the necessary rights for the Petitioner to install and maintain essential utility connections (water, electricity, and sewage) on the relevant acquired land in favour of the Petitioner. c. A writ of mandamus or any other appropriate writ, order, or direction to the Respondents to make good the loss as demanded under the legal notice of the Petitioner as per Annexure F dated 07/10/2024 and continue to pay such damages till such time the Respondents allow the Petitioner from getting accesses to schedule property as prayed for. d. Pass such other order/s including the award of costs, as this Hon'ble Court deems fit under the facts and circumstances of the case, in the interest of justice and equity.
2.
The Petitioner claims to be the absolute owner of the property
bearing
Bangalore
Mahanagar
Palike
Municipal No. 28/B, PID No. 57-137-28B, situated at Sarakki Industrial Layout, Bannerghatta Road, 3rd Phase, J. P. Nagar, Bengaluru, measuring 766.26 square metres. The property comprises a commercial building with a super built-up area of 21,839 square feet, consisting of the ground, first, second, third and fourth
floors.
According
to
Petitioner,
property originally had an independent and wide
-4HC-KAR
entry and exit on its eastern side, directly facing the main road. 3.
On 07.03.2017, Respondent No. 1, Bangalore Metro Rail Corporation Limited (BMRCL), issued a letter informing the Petitioner that an extent of 152 square metres on the eastern side of the property would be acquired through the Karnataka Industrial Areas Development Board (KIADB) for the construction of a metro station. The date 07.03.2017 is treated in this order as the date of acquisition of the said extent. Pursuant to the acquisition, a portion of the existing building was demolished and the metro station was constructed. The Petitioner contends that, in the course of these works, the entire access from the property to the main road was taken over, thereby leaving the remaining property without access.
4.
The Petitioner states that the property had been leased to M/s. GraphX Solution India Private Limited under a registered lease deed dated 01.07.2015. According to the Petitioner, the tenant was paying monthly
rent
of
Rs.12,01,145/-,
subject
to
an
escalation of 15% upon completion of every third year. The Petitioner further contends that, following the proposed demolition of a portion of the building
-5HC-KAR
and the consequent disconnection of the water, electricity and sewerage connections, the tenant vacated the premises in August 2019, and the demolition was carried out thereafter. Consequently, the property has remained vacant since August 2019, resulting in a continuing loss of rental income. 5.
The Petitioner also raises a dispute concerning the compensation paid for the acquired extent of 152 square metres. It is contended that compensation was paid only for 95.75 square metres, while compensation for the remaining 56.25 square metres was declined on the ground that the land constituted kharab land. The Petitioner challenged that decision in W.P. No. 4125/2023, in which this Court directed KIADB
to
take
steps
to
issue
necessary
corrections to a corrigendum so as to include the remaining extent of 56.25 square metres and make payment of compensation. 6.
On 15.04.2024, the Petitioner addressed a letter to BMRCL seeking access to the remaining property from the northern side through land acquired by BMRCL. The Petitioner sought a separate ingress and a separate egress, each measuring six metres in width, contending that such access was necessary
-6HC-KAR
having regard to the size and commercial use of the building and the number of persons using it. 7.
By its reply dated 28.06.2024, Respondent No. 2, the Additional Chief Engineer of BMRCL, informed the Petitioner that a combined access measuring six metres in width could be provided, subject to payment of the prescribed way-leave charges in advance and execution of a way-leave agreement for a period of ten years. The Petitioner did not accept the proposal.
8.
The Petitioner thereafter issued legal notices dated 05.10.2024 and 07.10.2024. In the notice dated 05.10.2024, the Petitioner contended that BMRCL had left the property without access to the main road and had unauthorisedly disconnected the water, electricity
sewerage
connections
during
construction of the metro station. The Petitioner further asserted that these acts had caused the tenant to vacate the premises and had resulted in financial loss. The Petitioner called upon BMRCL to provide a six-metre-wide entry and a six-metre-wide exit on the north-western side of the property, while reserving the right to claim damages.
-7HC-KAR
9.
By the subsequent legal notice dated 07.10.2024, the Petitioner quantified the loss of rental income and related amounts at Rs.11,30,36,834.57 as on the date of the notice. The Petitioner relied upon the rent payable under the registered lease deed, the stipulated escalation and the period during which the property remained vacant. A statement setting out the calculation of the rental loss and interest, together with a copy of the lease deed, was enclosed with the notice. The Petitioner called upon BMRCL to pay the amount claimed.
10. On 19.11.2024, BMRCL informed the Petitioner that a six-metre-wide entry and exit could be provided for a period of ten years and called upon the Petitioner to confirm in writing its acceptance of the applicable charges. By a reply dated 27.11.2024, the Petitioner disputed the demand for payment for the entire sixmetre width, relying upon Clause 4 of BMRCL's wayleave
policy,
under
which,
according
to
Petitioner, access up to 3.5 metres was to be provided free of cost. The Petitioner contended that BMRCL
could
not
demand
charges
for
access
necessitated by its own acts in blocking the existing ingress and egress. The Petitioner further maintained that, having regard to the size and commercial use of
-8HC-KAR
the property, permanent and unrestricted access was required and reiterated the request for a six-metrewide entry and exit from the northern side. 11. BMRCL responded on 23.12.2024, stating that the compensation already paid included compensation for the demolished building and that no further compensation was payable. It further stated that, following the demolition, the Petitioner had been permitted, upon request, to strengthen the floors extending from the line of acquisition towards the line of cut, at the Petitioner's own expense and without entitlement to compensation for such works. 12. BMRCL, while admitting that it demolished a portion of
building
after
taking
possession
of
acquired land, denied that it had disconnected the water, electricity and sewerage connections in the manner alleged by the Petitioner. It stated that the water
acquired
sewerage
portion
had
pipes
situated
within
been
closed
to
facilitate
construction of the metro station, as the property was lying vacant. According to BMRCL, there was consequently no need to restore those connections to
remaining
property.
It
also
disputed
Petitioner's claim that the tenant had vacated the
-9HC-KAR
premises or had been paying monthly rent of Rs.12,01,145/- with an escalation of 15% every three years. BMRCL contended that, if the Petitioner intended to lease the property, separate water and sewerage connections could have been obtained and that it could not be held responsible for the alleged loss of rental income. 13. With regard to access, BMRCL relied upon Clause 4 of its way-leave policy, stating that free access up to 3.5
metres
could
be
permitted
over
BMRCL's
property. It maintained that the policy did not extend to
providing
connections
water,
across
its
sewerage
or
electricity
property
that
Petitioner's demand for a six-metre-wide entry and exit was not permissible under the policy. BMRCL further contended that any right granted to the Petitioner to use its property for ingress and egress would be in the nature of a licence, subject to the applicable terms and conditions. It denied liability for the compensation and damages claimed by the Petitioner. 14. In
these
circumstances,
Petitioner
has
approached this Court seeking the reliefs set out in the petition.
- 10 HC-KAR
15.
Sri.S.Rajendra, learned counsel for the Petitioner would submit that:
15.1.
The
Petitioner
Bangalore
owns
Mahanagar
property
Palike
bearing
Municipal
No.
28/B, PID No. 57-137-28B, situated at Sarakki Industrial
Layout,
Phase,
P.
J.
Bannerghatta
Nagar,
Bengaluru,
Road,
3rd
measuring
766.26 square metres. The property comprises a commercial building with a super built-up area of 21,839 square feet, consisting of the ground, first, second, third and fourth floors. Before the acquisition, the property had a wide, independent access on its eastern side, directly facing the main road, with the entire frontage available for ingress and egress. 15.2.
Learned Counsel for the Petitioner submits that, by communication dated 07.03.2017, BMRCL informed the Petitioner that 152 square metres on the eastern side would be acquired through KIADB for construction of a Metro station. Following
acquisition,
road-facing
portion of the building was demolished and the Metro station was constructed. The Petitioner’s
- 11 HC-KAR
case is that the acquisition and construction blocked the entire former frontage and access to
main
property
road,
without
leaving
ingress
or
remaining
egress.
The
Petitioner further submits that access cannot be obtained through the Metro station. 15.3.
Learned Counsel for the Petitioner submits that the effect assessed
of an acquisition must solely
by
reference
to
not
be
area
acquired. The effect on the remaining property is also relevant, particularly where the use of the acquired land affects the access, usability and commercial utility of the residual property. Payment of compensation for the acquired land and demolished structure does not, by itself, determine the separate question whether the remaining
property
has
been
left
with
reasonable and usable access. 15.4.
Learned Counsel for the Petitioner submits that
former
frontage
was
not
voluntarily
surrendered and that the Petitioner did not independently seek permission to use BMRCL’s land for an additional benefit. The land was compulsorily acquired by the State in exercise
- 12 HC-KAR
of its power of eminent domain. The need for alternative
access
arose,
according
to
Petitioner, because the Metro project removed the access previously available. The Petitioner therefore submits that its request should not be treated as an ordinary request for an additional facility or commercial advantage. 15.5.
Learned Counsel for the Petitioner submits that the public purpose of the Metro project is not disputed. The issue is whether that purpose can be
achieved
foreseeable
while
effect
of
also
addressing
project
on
remaining property. The Petitioner does not seek to obstruct the project; it seeks an effective
means
of
continuing
to
use
property left after acquisition. 15.6.
Referring to the photographs produced before this Court, Learned Counsel submits that the Metro station abuts the Petitioner’s property and that the station wall blocks the eastern side that formerly provided direct access to the main road. The Petitioner relies on the photographs and site layout to contend that neither the former access nor an alternative access is
- 13 HC-KAR
available, his submission is that there is at present no Access to the property of the Petitioner. 15.7.
Learned Counsel for the Petitioner submits that, by
letter
dated
15.04.2024, the Petitioner
requested
access
from
northern
side
through land acquired by BMRCL. The request was for separate ingress and egress passages, each six metres wide, having regard to the size of the property, the commercial building and
movement
of
persons
vehicles
associated with its use. 15.8.
Learned Counsel for the Petitioner submits that, by communication dated 28.06.2024, BMRCL offered a single combined passage measuring six
metres
in
width,
subject
to
advance
payment of way-leave charges and execution of an agreement for ten years. The Petitioner did not accept the offer. BMRCL reiterated its position by communication dated 19.11.2024 and called upon the Petitioner to confirm acceptance Petitioner
of
submits
applicable that
a
charges.
single
The
six-metre
passage is not equivalent to two separate
- 14 HC-KAR
passages, each six metres wide, because the arrangements differ in width, configuration and the manner in which vehicles would enter and leave the property. 15.9.
Learned Counsel for the Petitioner submits that access must be assessed in the context of the building’s size and commercial use. The building has a super built-up area of 21,839 square feet and was leased to M/s. GraphX Solution India Private Limited under a registered lease deed dated 01.07.2015. The Petitioner submits that the building was being used commercially and generating rental income before the access and utility disputes arose. The requirements of such a
building
include
access
for
employees,
customers, visitors, service providers, delivery vehicles and the movement of goods, furniture, equipment
materials
required
for
maintenance and repairs. Pedestrian access, or a passage suitable only for limited vehicle movement,
would
not
necessarily
provide
effective access for the building’s intended use. 15.10. Learned
Counsel
for
Petitioner
further
submits that parking facilities have been made
- 15 HC-KAR
available for persons using the building. Those facilities cannot serve their intended purpose if vehicles cannot reach the property through a suitable passage. The width and configuration of access should therefore bear a reasonable relationship
to
property’s
dimensions,
location, commercial use and site conditions. The Petitioner submits that its request for separate six-metre-wide ingress and egress should be considered on its merits and not rejected
merely
by
reference
to
standard
categories in the way-leave policy. 15.11. Learned Counsel for the Petitioner submits that the adequacy of access also raises fire-safety and emergency-response concerns. Fire tenders and other emergency vehicles may need to approach the building. Suitability depends not only on the stated width of a passage but also on its turning radius, clear height, alignment, obstructions
ability
of
emergency
vehicles to reach the relevant part of the premises.
The
Petitioner
relies
on
approximate dimensions of passenger vehicles and larger vehicles, including buses, minibuses, goods trucks and fire tenders, to contend that a
- 16 HC-KAR
passage of limited width may not meet all the requirements of the property. Learned Counsel submits that these matters require technical assessment and cannot be resolved merely by referring to the minimum free-access width under the way-leave policy. 15.12. Learned Counsel for the Petitioner submits that BMRCL’s policy regulates the use of its land, but does not, by itself, establish that every width permitted under the policy is suitable for every building. The technical adequacy of access and the financial terms on which it is provided are separate questions. The Petitioner’s case is that separate six-metre-wide ingress and egress are required for the effective use of the remaining property and should be assessed in light of the relevant site and safety requirements. 15.13. Learned Counsel for the Petitioner relies on Clause 4 of BMRCL’s way-leave policy, which, according to the Petitioner, provides for free access up to 3.5 metres for eligible properties. Learned Counsel submits that the policy must be
read
as
a
whole
applied
to
circumstances of this case. The provision for
- 17 HC-KAR
free access shows that the policy recognises the need to provide access to affected properties in at least some circumstances. BMRCL should therefore
consider
applies
whether
whether
provision Petitioner’s
circumstances justify a different or case-specific arrangement before demanding charges. 15.14. Learned Counsel for the Petitioner submits that reliance on the 3.5-metre provision does not amount to acceptance of access limited to that width or of BMRCL’s offer of a combined sixmetre passage. The Petitioner maintains that the required access must be determined by reference
to
actual
site
conditions,
building’s commercial use and applicable safety requirements.
A
standard
width
may
be
adequate for some residential properties but, according
to
adequate
for
this
building.
Even
if
Petitioner,
may
substantial
policy
not
be
commercial prescribes
a
standard free width, the Court should consider whether that width is sufficient in this case and whether the policy permits a reasoned, casespecific arrangement.
- 18 HC-KAR
15.15. Learned
Counsel
for
Petitioner
further
submits that the policy provides for wider passages in the ranges of 3.5 to 7 metres, 7 to 12 metres and 12 to 20 metres, with charges calculated
at
different
applicable
guidance
percentages
value.
The
of
Petitioner
submits that these provisions recognise that access requirements vary, but that charging a landowner whose former access was removed through compulsory acquisition is arbitrary and causes prejudice. The Petitioner’s case is that BMRCL
must
reasonably
first
required
determine
provide
access effective
alternative access without charge, because the need for that access arose from the project. The
existence of charging
slabs
does not
remove the need to assess the suitability of the proposed arrangement or the reasonableness of the charges and conditions. 15.16. Learned Counsel for the Petitioner submits that BMRCL requires advance payment of way-leave charges and an agreement for ten years. According to the Petitioner, the charges are calculated by reference to the guidance value notified by the State Government, with the
- 19 HC-KAR
applicable percentage depending on the width of the passage, and renewal charges are based on the guidance value prevailing at the time of renewal. The
Petitioner
contends
that
this
would impose a substantial financial burden on an owner who needs access only because the original
access
was
lost
through
a
public
project. Learned Counsel submits that BMRCL should not, in effect, charge rent for restoring access that the Petitioner previously enjoyed without charge, or use the acquisition-created need to derive a commercial benefit from the affected owner. 15.17. Learned Counsel for the Petitioner submits that there is a material distinction between a person who voluntarily seeks to use BMRCL’s land for an additional benefit and an owner whose former access has been lost as a consequence of a public project. The Petitioner contends that ordinary licence charges may be relevant to the former situation but should not automatically apply where acquisition and construction have left the remaining property without access. The Petitioner further submits that BMRCL should not be permitted to take advantage of a
- 20 HC-KAR
situation caused by its own acquisition and construction activities. 15.18. Learned Counsel for the Petitioner submits that the former access to the Schedule Property was available
without
payment
of
way-leave
charges. Had the road-facing portion not been acquired, the Petitioner would, according to its case, have continued to enjoy that access. The Petitioner submits that compensation paid for the acquired land and demolished building does not include separately assessed compensation for the loss of access to the remaining property. It contends that the Respondents cannot treat alternative
access
as
a
new,
chargeable
privilege while leaving the loss of the former access unaddressed. The Petitioner submits that, at the least, any compensation properly payable for the loss of access should be considered
when
determining
cost
of
providing access on a continuing basis. The Petitioner characterises the proposed advance charges as expropriatory in their effect. 15.19. Learned Counsel for the Petitioner relies on Clause 3 of the way-leave policy, which is said
- 21 HC-KAR
to reserve to BMRCL the right to enter upon, pass through or use its land and to discontinue the way-leave facility without notice. The clause is
also
stated
to
exclude
liability
for
compensation or reimbursement and to impose no obligation to provide alternative access following submits
discontinuance. that
these
Learned
terms
do
Counsel
not
provide
adequate security or continuity for an owner who requires dependable access for the use of the property and for any tenant occupying the building. 15.20. Learned Counsel for the Petitioner submits that the risk of discontinuance is particularly serious where
Petitioner
is
required
to
make
substantial advance payment for a ten-year period. The payment obligation and BMRCL’s asserted power to discontinue access without notice or an alternative arrangement should be considered together. The Petitioner contends that this would place the owner in an unequal position and could leave the property without access even after payment. The Petitioner therefore challenges the policy insofar as it permits access to be made subject to conditions
- 22 HC-KAR
without adequate safeguards against leaving an affected property inaccessible. 15.21. Learned Counsel for the Petitioner submits that the way-leave policy, as applied to this case, is arbitrary
violates
Article
of
Constitution. The challenge is not merely to the use of standard categories or charges. It is that the policy and its application fail to account for relevant differences between properties and between the circumstances in which access is sought. A property with access from another road is not in the same position as a property whose only access has been blocked by a public project.
Likewise,
needs
of
a
small
residential property may differ from those of a substantial commercial building. The location, dimensions, frontage, intended use, number of occupants,
vehicle
requirements
movements,
availability
of
safety
alternative
access are all relevant considerations. 15.22. Learned Counsel for the Petitioner submits that a uniform policy may provide an administrative framework, but its application must comply with constitutional requirements. If the policy
- 23 HC-KAR
does not permit meaningful consideration of an affected property’s circumstances, or if BMRCL refuses
to
consider
relevant
factors
when
deciding the Petitioner’s request, the resulting decision may be arbitrary even if the policy serves a legitimate administrative purpose in general. The Petitioner contends that BMRCL has
not
adequately
explained
why
requested arrangement is unsuitable, why a combined
six-metre
passage
would
be
sufficient, or why the policy must be applied without modification in the circumstances of this case. 15.23. Learned Counsel for the Petitioner submits that BMRCL has treated the way-leave policy as inflexible and has declined to consider the particular consequences of its acquisition and construction
activities.
The
Petitioner
accordingly challenges the policy at Annexure-C as unconstitutional, ultra vires, invalid and unenforceable to the extent that it fails to provide for fair, case-specific consideration of the circumstances pleaded, permits access to be denied or discontinued without adequate safeguards,
allows
a
time-bound,
- 24 HC-KAR
chargeable arrangement to be imposed without adequately addressing the loss of the access previously enjoyed. The Petitioner seeks a declaration to that effect and a consequential writ of mandamus directing the Respondents to provide the access claimed in the writ petition. 15.24. Learned Counsel for the Petitioner submits that the loss of access has affected the Petitioner’s ability to use the property for commercial purposes.
According
to
Petitioner,
tenant, M/s. GraphX Solution India Private Limited, vacated the premises in August 2019 following
proposed
demolition
interruption of utility services, and the building has remained vacant since then. The absence of effective access has impaired occupation, delivery of goods, maintenance, emergency response and the ability to lease the premises. Learned Counsel submits that the practical effect of the denial of access must be assessed in the context of the building’s established commercial use. 15.25. Learned Counsel for the Petitioner submits that the Petitioner does not contend that Article
- 25 HC-KAR
19(1)(g) guarantees every property owner the precise width of access preferred by that owner. The submission is that the State and its instrumentalities must consider the effect of their actions on the ability to use property for lawful commercial purposes. Where a public project
removes
former
access,
authority must consider whether the alternative arrangement is reasonable and effective. The Petitioner contends that the failure to do so in the present case infringes Article 19(1)(g). Learned Counsel further submits that the public purpose of the Metro project does not answer the separate question whether the remaining property
can
still
be
used
lawfully
effectively for commercial purposes. 15.26. Learned Counsel for the Petitioner also relies on Article 300A of the Constitution. The Petitioner acknowledges
that
acquisition
was
undertaken for a public purpose, but submits that the Court should consider the substance and effect of the action, rather than only the formal extent of the land acquired. According to the Petitioner, the use made of the acquired land has deprived the remaining property of the
- 26 HC-KAR
access required for its effective enjoyment. The consequences for the residual property must therefore
be
considered
compensation
for
separately
land
from
structure
actually acquired. 15.27. Learned Counsel for the Petitioner submits that the Petitioner does not seek to treat every inconvenience caused by a public project as a constitutional violation. Its case is that the loss is substantial: the former access has been blocked,
alternative
access
remains
disputed, and the proposed arrangement is subject
to
charges
conditions
that,
according to the Petitioner, do not secure dependable access. The Petitioner submits that compensation for the acquired land cannot automatically extinguish every separate claim arising from the effect of the acquisition on the remaining property. The access dispute must be determined on its own facts and under the applicable law. 15.28. Learned Counsel for the Petitioner further relies on Article 21 in relation to the safety of persons who
may
occupy
or
use
commercial
- 27 HC-KAR
building. The Petitioner submits that the access arrangement should not be treated solely as a dispute about licence charges. Its adequacy also affects emergency response and the safety of persons within the premises. In particular,
Petitioner
permanent
submits
that
unrestricted
requested
access
under
prayer (b) a six-metre ingress and a separate six-metre egress from the northern side, is relevant to fire safety and emergency response and thus to the life and liberty of persons using the building of the Petitioner. 15.29. Learned Counsel for the Petitioner submits that the Respondents’ offer of a single passage, of which 3.5 metres is free and anything above that width is chargeable, would not provide adequate access for fire tenders and other emergency vehicles. An emergency at the Schedule Property could also pose a risk to the adjoining
Metro
station,
its
operations,
commuters and members of the public. The Petitioner submits that access must therefore be
assessed
by
reference
to
actual
emergency-access requirements of the building
potential
consequences
for
- 28 HC-KAR
adjoining solely
Metro
by
infrastructure,
reference
to
a
rather
than
nominal
width
prescribed by policy. These considerations are relied upon in support of the specific mandamus sought under prayer (b). 15.30. Learned Counsel for the Petitioner submits that the claim for damages under prayer (c) has two components:
(i)
past
Annexure-F
dated
losses
quantified
07.10.2024;
in (ii)
continuing damages arising from the ongoing deprivation of effective access. The past claim relates to the period up to the date of the legal notice and is based on rental income said to have been lost after the tenant vacated the building.
The
Petitioner
submits
that
proposed subsequent reconnection of water, electricity and sewerage facilities does not extinguish the accrued claim, because proposed restoration of those utilities neither reverses past rental loss nor remedies the continuing access problem. 15.31. Learned Counsel for the Petitioner submits that continuing damages are claimed for the period after 07.10.2024, for so long as the Schedule
- 29 HC-KAR
Property
remains
commercial
use
incapable
of
effective
occupation
because
adequate ingress and egress have not been provided. The Petitioner seeks damages until the permanent and unrestricted access claimed under prayer (b) is provided. The claim for past damages and the claim for continuing damages thus relate to distinct periods. The Petitioner submits that both are covered by prayer (c), subject to adjudication on the pleadings and material on record. 15.32. Learned Counsel for the Petitioner submits that
property
Solution
was
India
leased
Private
to
M/s.
Limited
GraphX
under
a
registered lease deed dated 01.07.2015, at a monthly
rent
of
Rs.12,01,145/-,
with
an
escalation of 15% upon completion of every third year. The Petitioner contends that the tenant
vacated
in
August
2019
after
demolition and disconnection of utility services, and that the premises have remained vacant since then. By legal notice dated 07.10.2024, the Petitioner quantified rental loss and related amounts at Rs.11,30,36,834.57 and enclosed a statement calculating the claimed loss and
- 30 HC-KAR
interest by reference to the lease deed. Learned Counsel submits that the claim is based on identifiable contractual and financial records and should be assessed in light of those records. 15.33. Learned Counsel for the Petitioner submits that, by communication dated 23.12.2024, BMRCL stated that the compensation paid included compensation for the demolished building and that no further compensation was payable. BMRCL also stated that the Petitioner had been permitted, at its own expense, to strengthen the floors from the line of acquisition towards
line
of
cut,
without
entitlement
to
compensation for those works. The Petitioner submits that these statements do not resolve the separate issues concerning loss of access to the remaining property, interruption of utilities,
adequacy
of
proposed
alternative
passage, or the terms governing its continued use. 15.34. Learned Counsel for the Petitioner refers to the separate dispute concerning compensation for the 152 square metres acquired. The Petitioner
- 31 HC-KAR
submits that compensation was paid for only 95.75 square metres and that compensation for the remaining 56.25 square metres was refused on the ground that the land was classified as kharab land. The Petitioner challenged that refusal
in
W.P.
No.
4125/2023.
In
that
proceeding, this Court directed KIADB to take steps to issue a corrigendum containing the necessary corrections, including the remaining extent of 56.25 square metres, and to make payment of compensation. Learned Counsel submits that this dispute is distinct from the access grievance and that the circumstances demonstrate
need
to
consider
Petitioner’s claims fairly. 15.35. Learned Counsel for the Petitioner submits that
compensation
dispute
access
dispute must be kept distinct. The former concerns payment for the land acquired; the latter concerns the loss of access to the remaining property and the conditions on which alternative access is offered. Resolution of the compensation dispute would not, by itself, resolve
access
issue.
Conversely,
access claim should not replace consideration of
- 32 HC-KAR
whether
directions
concerning
remaining 56.25 square metres have been complied with. 15.36. Learned Counsel for the Petitioner submits that prayer (b) seeks substantive and prospective relief by way of a mandamus directing the Respondents
to
provide
permanent
unrestricted access to the remaining Schedule Property, comprising a six-metre ingress and a separate six-metre egress from the northern side, together with the necessary rights to install
maintain
water,
electricity
sewerage facilities. The Petitioner submits that this relief is intended to secure access and enable the property’s use and
occupation.
Compensation
land
for
acquired
demolished structure does not, by itself, satisfy this separate claim. 15.37. Learned Counsel for the Petitioner submits that prayer (c) seeks monetary relief for the losses quantified in Annexure-F dated 07.10.2024 and continuing damages until the access sought under
prayer
concerns
loss
(b)
is
of
provided. rental
The
claim
income
- 33 HC-KAR
consequential losses said to arise from the continued
deprivation
of
access
to
remaining property. The Petitioner submits that it is not a claim for duplicate compensation for the acquired land or demolished structure. An order
providing
access
may
remove
continuing impediment to use of the property, but
would
not,
by
itself,
determine
extinguish losses accrued before provided.
The
Petitioner
or
access is
accordingly
seeks
separate consideration of the monetary relief under prayer (c), in addition to the access relief under prayer (b). 15.38. Learned Counsel for the Petitioner submits that the central issue is not merely the amount of way-leave charges. It is whether the remaining property was left without access as a result of
public
proposed
project
solution
reasonable.
The
is
whether
adequate, Petitioner
BMRCL’s
lawful
seeks
an
arrangement that accounts for the physical configuration
of
site,
building’s
commercial use, the movement of vehicles and goods, applicable safety requirements and the need for continuity of access. The Petitioner
- 34 HC-KAR
maintains its request for separate six-metrewide ingress and six-metre-wide egress. 15.39. Learned Counsel for the Petitioner submits that the Petitioner is also willing, if effective and dependable
access
cannot
reasonably
be
provided, for BMRCL to acquire the remaining portion
of
property
upon
payment
of
appropriate compensation. This is advanced as an alternative and not as an admission that acquisition
of
remaining
necessary.
The
primary
relief
property
is
remains
provision of effective access on lawful and reasonable
terms.
The
alternative
is
put
forward because the Petitioner does not wish to remain indefinitely dependent on a licence that may be discontinued under the terms of the policy. 15.40. Learned Counsel for the Petitioner accordingly submits
that
Respondents
should
be
directed to provide permanent and unrestricted access to the Schedule Property in the manner sought under prayer (b), including a six-metre ingress and a separate six-metre egress from the northern side, together with the necessary
- 35 HC-KAR
utility
rights.
The
Petitioner
also
seeks
adjudication of its claim for past and continuing damages under prayer (c), and a declaration that
Annexure-C,
way-leave
policy,
is
unconstitutional, invalid and unenforceable to the extent pleaded, or, alternatively, a direction requiring BMRCL to apply the policy fairly and give a reasoned decision after considering the particular circumstances of the case. If effective access cannot reasonably be provided, the Petitioner seeks consideration of acquisition of the remaining property in accordance with law. 16.
Sri.Harish Narasimha Murthy, learned counsel for BMRCL, would submit that:
16.1.
Learned Counsel for the Respondents submits that BMRCL is a joint venture company in which
State
Government
Government
each
hold
50%
Central of
shareholding. It was established to implement the Bangalore Metro Rail project, a major urban infrastructure transit
for
project
providing
benefit
Bengaluru.
of
rapid
mass
citizens
of
- 36 HC-KAR
16.2.
Learned Counsel for the Respondents submits that BMRCL formulated the Way Leave Policy after due consideration to provide access where acquisition for the Metro project leaves a property without access. The policy recognises a right of necessity by providing free access up to 3.5 metres, while requiring payment for any additional width. The Respondents submit that the policy establishes a fair and transparent mechanism that balances access to affected properties
with
public
interest
operational requirements of the Metro project. 16.3.
Learned Counsel for the Respondents submits that the writ petition is not maintainable and that the Petitioner is estopped from challenging the Way Leave Policy. The Petitioner’s letter dated 31.07.2024 is said to record willingness to pay the applicable way-leave licence charges for access beyond the free entitlement of 3.5 metres. The Respondents contend that, having expressed cannot
such
willingness,
approbate
reprobate
subsequently challenging the policy.
Petitioner by
- 37 HC-KAR
16.4.
Learned Counsel for the Respondents submits that the Petitioner has no vested right to demand free access of 12 metres. BMRCL is prepared to provide 3.5 metres of access free of charge under the policy and to consider an additional five metres, subject to compliance with the policy and payment of the prescribed licence fee. The Respondents submit that no access beyond the additional five metres can be considered and that the Petitioner is bound by the policy. According to the Respondents, the Petitioner cannot challenge the policy merely on the basis of its own assertions, particularly when the different rates for different widths of access were prescribed after due consideration by BMRCL, which has the relevant technical expertise and personnel.
16.5.
Learned Counsel for the Respondents submits that the Petitioner’s claim for damages and further compensation raises disputed questions of fact that cannot appropriately be determined in
proceedings
under
Article
of
Constitution. The Respondents contend that the Petitioner should approach the competent Civil Court to seek damages, compensation or a
- 38 HC-KAR
declaration
of
easementary
rights,
where
evidence can be led. Learned Counsel submits that such claims cannot be adjudicated merely by filing a writ petition. 16.6.
Learned Counsel for the Respondents submits that the acquisition was carried out under the Karnataka Industrial Areas Development Act, 1966 (“KIAD Act”). A sum of Rs.4,01,44,404/was paid to the Petitioner as compensation for the acquired land and building. According to the Respondents,
Petitioner
accepted
that
compensation in respect of the acquisition and cannot claim further compensation on account of
same
acquisition.
Learned
Counsel
further submits that the compensation was calculated
at
together
with
200%
of
solatium
market
value,
interest,
in
accordance with the Right to Fair Compensation
Transparency
in
Land
Acquisition,
Rehabilitation and Resettlement Act, 2013. 16.7.
On this basis, the Respondents contend that BMRCL is entitled to levy licence charges for access beyond the free 3.5-metre entitlement
- 39 HC-KAR
and that such charges are neither unreasonable nor arbitrary. 16.8.
Learned Counsel for the Respondents admits that 152 square metres of the Petitioner’s property was acquired. The boundaries of the acquired land were recorded as follows: East— road; West—remaining portion of Property No. 28/B; North—property of Prema Raghu N. V.; and South—property of Madhusudhan P. Patel. Learned Counsel submits that the acquired land lies on the eastern side and now forms part of BMRCL’s property.
16.9.
It is also admitted that BMRCL demolished a portion of the building after taking possession from
Special
Land
Acquisition
Officer
(“SLAO”), and that compensation was paid for the demolished portion. 16.10. Learned Counsel for the Respondents submits that the land over which access is sought belongs to BMRCL and is required for its Metro infrastructure.
The
Petitioner
has
no
independent right to use that land apart from the benefit available under the Way Leave Policy.
According
to
Respondents,
- 40 HC-KAR
access permitted under the policy is not a vested right and remains subject to BMRCL’s discretion. This, he submits, is why the policy reserves the right to cancel the permission to use
BMRCL’s
land.
Learned
Counsel
nevertheless submits that, if the Petitioner pays the prescribed licence fee, BMRCL would not cancel the licence and would enter into renewal agreements from time to time, so long as the applicable fee continues to be paid. 16.11. Learned Counsel for the Respondents submits that
Petitioner’s
request
for
water,
electricity and sewerage connections through BMRCL’s land from the northern side is not covered by the Way Leave Policy. BMRCL therefore denies that it is obliged under the policy to provide those connections. However, he submits that in response to the Petitioner’s representation,
a
joint
inspection
was
conducted on 28.03.2025 in the presence of the Tahsildar,
BMRCL’s
Assistant
Engineer
Legal Advisor. 16.12. During the inspection, locations for laying the electricity,
sewage
water
lines
were
- 41 HC-KAR
marked, as shown in Annexure-R2 to the objections.
Learned
Counsel
submits
that
BMRCL is willing to permit the water line, sanitary line and electricity line to be laid at the marked locations. 16.13. Learned Counsel for the Respondents further submits that BMRCL is willing to provide an additional five metres of access, over and above the free 3.5-metre passage, subject to compliance with the Way Leave Policy and payment
of
Respondents
prescribed
maintain
that
amounts.
The
BMRCL
not
is
obliged to provide the 12 metres of access sought by the Petitioner and that any additional access
beyond
free
entitlement
is
conditional on payment under the policy. 16.14. Learned Counsel for the Respondents submits that BMRCL is not aware of the terms of the alleged lease of the property to M/s. GraphX Solution India Private Limited or the rent payable
under
Respondents
it.
In
contend
that
any
event,
lease,
amount of rent and the tenant’s decision to
- 42 HC-KAR
vacate are matters between the Petitioner and the tenant and do not concern BMRCL. 16.15. Learned Counsel for the Respondents submits that, if this Court were to hold the Way Leave Policy invalid, the Petitioner could not rely on that policy to claim even the free 3.5-metre passage. The Respondents contend that the Petitioner would then have to approach the competent
Civil
Court
establish
an
easementary right, including any claim based on easement of necessity. Such a claim, they submit,
requires
evidence
cannot
be
determined in the present writ proceedings. 16.16. Learned Counsel for the Respondents submits that the land on the northern side of the Petitioner’s
property
is
also
required
for
BMRCL’s infrastructure project. The acquired property was required for construction of the Jayadeva
Hospital
Metro
Station
on
Bannerghatta Road, which serves thousands of Metro users in the area. The Respondents maintain that the acquisition and construction of the station were lawful and proper and
- 43 HC-KAR
cannot
be
challenged
in
present
Respondents
proceedings. 16.17. Learned
Counsel
for
accordingly submits that the applicable licence charges are authorised by the Way Leave Policy and are not arbitrary. BMRCL is willing to provide free access up to 3.5 metres, consider an additional five metres subject to payment and compliance with the policy, and permit the laying of water, electricity and sewerage lines at
locations
marked
during
joint
inspection. The Respondents contend that the claims for damages, further compensation and easementary rights involve disputed questions of fact that should be pursued before the competent
Civil
Court.
On
these
grounds,
Learned Counsel prays that the writ petition be dismissed. 17.
Heard
Sri.S.Rajendra,
learned
counsel
for
Petitioner and Sri.Harish Narasimha Murthy, learned counsel for BMRCL, and perused papers. 18.
The points that would arise for consideration are as follows:
- 44 HC-KAR
(i)
Whether the writ petition is maintainable in its present form, having regard to the Respondents’ objections concerning the disputed questions of fact, the availability of a civil remedy and the alleged estoppel arising from Petitioner’s communication dated 31.07.2024?
(ii)
Whether the Petitioner has established grounds for declaring the impugned Way Leave Policy bearing No. BMRCL/LAQ/WLP/5132/2022-23, including its unilateral termination clause, unconstitutional, invalid unenforceable, as sought under prayer (a) of the writ petition?
(iii) Whether the Petitioner is entitled to a writ of mandamus under prayer (b), directing the Respondents to provide, permanently and free of cost, an unrestricted sixmetre-wide ingress and a separate sixmetre-wide egress to Schedule Property from the northern side, together with the necessary rights to install and maintain water, electricity and sewerage connections over the relevant acquired land; and, in particular, whether the Respondents can restrict such access to the arrangement contemplated under the impugned Way Leave Policy and subject any additional access to licence charges and time-bound conditions? (iv) Whether the compensation paid in respect of the acquired land and demolished
- 45 HC-KAR
structure precludes the Petitioner from pursuing its distinct claim for damages arising from the alleged loss of access to the remaining Schedule Property? (v)
Whether the Petitioner is entitled to the monetary relief sought under prayer (c), namely, recovery of the amount of ₹11,30,36,834.57 claimed under Annexure-F dated 07.10.2024 continuing damages until the access sought under prayer (b) is provided; and whether such relief can appropriately be adjudicated in present writ proceedings, having regard to Respondents’ objections concerning disputed facts, causation and the alleged loss of rental income?
(vi) What order? 19.
This Court answers the above points as follows:
20.
Answer to Point No. (i): Whether the writ petition is maintainable in its present form, having regard to the Respondents’ objections concerning the disputed questions of fact, the availability of a civil remedy and the alleged estoppel arising from Petitioner’s communication dated 31.07.2024?
20.1.
Learned Counsel for the Petitioner, Shri S. Rajendra, submits that the Petitioner does not challenge the acquisition of its land or the
- 46 HC-KAR
public
purpose
grievance
is
of
that
Metro
project.
The
acquisition
construction of the Metro station have left the remaining Schedule Property without access. The challenge is directed against the conditions imposed by BMRCL for providing access to the property. The Petitioner seeks relief under prayers (a) and (b) of the writ petition. 20.2.
The
Petitioner
submits
that
its
refusal
to
execute the proposed way-leave agreement does not amount to refusal to cooperate with BMRCL. Its letter dated 31.07.2024 expressed willingness to pay the applicable charges for additional
access
but
did
not
amount
to
acceptance of the Policy or its conditions. The Petitioner disputes the financial burden imposed and the absence of any assurance that access would continue. Reliance on Clause 4 of the Way
Leave
Policy
does
not
amount
to
acceptance of access limited to 3.5 metres or of BMRCL’s proposal for a combined six-metre passage. 20.3.
The Petitioner submits that the dispute is not confined to way-leave charges. The principal
- 47 HC-KAR
issue
is
whether
remaining
property
BMRCL
can
without
leave
access
as
a
consequence of a public project and then insist on access only on the terms of its Policy. The Petitioner relies on Articles 14 and 300A of the Constitution and also invokes Articles 19(1)(g) and 21. 20.4.
Learned Counsel for the Respondents, Shri Harish Narasimha Murthy, submits that BMRCL is a joint venture of the State Government and
Central
Government,
established
to
implement the Bengaluru Metro Rail project, which serves an important public purpose. 20.5.
The Respondents raise three objections to maintainability.
First,
dispute
involves
questions of fact, including the alleged loss of rental income and the claim for damages, which require determination by a civil court. Second, the Petitioner has an alternative remedy before the civil court by way of a suit for easement of necessity. Third, the Petitioner’s letter dated 31.07.2024, expressing willingness to pay the applicable way-leave charges, precludes it from
- 48 HC-KAR
challenging the Policy under the principle of approbation and reprobation. 20.6.
The Respondents further submit that, if the Policy is set aside, the Petitioner must establish its right to an easement before the competent civil court. They also rely on the court fee paid in the writ petition and contend that the acquisition
construction
of
Metro
station were undertaken for a public purpose and should not be questioned. 20.7.
The
Petitioner
does
not
challenge
acquisition or the construction of the Jayadeva Hospital Metro Station. It accepts that the project serves a public purpose. The validity of the acquisition and construction is therefore not in issue in this writ petition. 20.8.
The writ petition seeks three distinct forms of relief: 20.8.1.
Prayer (a) challenges the validity of the Way Leave Policy, including its unilateral termination clause.
20.8.2.
Prayer
(b)
seeks
permanent
unrestricted
access
to
Schedule
- 49 HC-KAR
Property, comprising a six-metre ingress and a separate six-metre egress from the northern side, together with the necessary
rights
relating
to
utility
connections. 20.8.3.
Prayer (c) seeks the amount claimed in the legal notice dated 07.10.2024 and continuing
damages
until the
access
sought under prayer (b) is provided. 20.9.
The maintainability of the writ petition must be examined separately in relation to each relief.
FIRST
OBJECTION:
DISPUTED
QUESTIONS
OF
FACT 20.10. Article 226 of the Constitution empowers the High Court to issue writs for the enforcement of fundamental rights and for any other purpose. The existence of disputed questions of fact does not,
by
itself,
bar
exercise
of
writ
jurisdiction. The Court must examine the nature of the dispute, the facts requiring determination and the relief sought. 20.11. In Whirlpool Corporation v. Registrar of Trade Marks [(1998) 8 SCC 1] and Radha
- 50 HC-KAR
Krishan Industries v. State of Himachal Pradesh [(2021) 6 SCC 771], the Hon’ble Supreme Court has held that the availability of an alternative remedy is not an absolute bar to the exercise of writ jurisdiction. The Court must determine
whether
particular
claim
is
appropriate for consideration under Article 226. 20.12. BMRCL
is
a
public-sector
joint
venture
established to implement the Metro project. The impugned Policy governs the conditions on which affected property owners may obtain access
over
land
under
its
control.
The
challenge concerns the exercise of public power and raises an issue under Article 14. The objection to jurisdiction cannot be sustained merely because the dispute concerns land or access. 20.13. In relation to prayer (a), the principal issue is the legal validity of the impugned provisions of the Way Leave Policy. The Policy is a written instrument issued by BMRCL. Its terms and legal effect can be examined on the basis of the record. The constitutional validity of the Policy
- 51 HC-KAR
is a matter for the Constitutional Court and cannot be determined by a civil court. 20.14. In relation to prayer (b), BMRCL admits that 152 square metres of land on the eastern side were acquired, that the acquired portion is under its control and that part of the building was
demolished
following
acquisition.
BMRCL’s proposal to provide access from the northern side also establishes that access over land under its control forms part of the dispute. These matters can be considered on the basis of the pleadings, admissions, correspondence and other documents on record. 20.15. These
admissions
do
not,
by
themselves,
establish the precise access to
which the
Petitioner is entitled. Whether the Petitioner is entitled to a six-metre ingress and a separate six-metre egress, whether those dimensions are legally required and whether access must be provided free of charge are matters to be determined under the point concerning prayer (b). For the present point, it is sufficient that the claim for access can be examined in writ proceedings.
- 52 HC-KAR
20.16. BMRCL disputes the lease in favour of M/s. GraphX Solution India Private Limited, the rent payable, the tenant’s departure and the alleged loss of rental income. These matters principally concern prayer (c). A dispute over the amount or cause of the alleged loss does not prevent the Court from examining the legal validity of the Policy or the claim for access. 20.17. BMRCL has not identified any specific factual dispute concerning prayers (a) and (b) that necessarily requires oral evidence before those claims can be considered. The objection based on disputed questions of fact is therefore rejected insofar as it concerns prayers (a) and (b). The monetary claim under prayer (c) is considered separately under Point No. (v). SECOND OBJECTION: AVAILABILITY OF A CIVIL REMEDY 20.18. The Respondents contend that the Petitioner must institute a civil suit for an easement of necessity. The availability of a civil remedy does not automatically oust the jurisdiction of this Court under Article 226. The question is
- 53 HC-KAR
whether
nature
of
relief
sought
warrants consideration in writ proceedings. 20.19. Prayer (a) challenges the validity of a Policy issued by
a
public body on constitutional
grounds. A civil suit for an easement would not resolve
that
challenge.
The
Petitioner’s
grievance concerns not merely the existence of a right of passage but also the conditions imposed by BMRCL for providing access under its
Policy.
The
constitutional
challenge
is
therefore appropriate for consideration by this Court. 20.20. BMRCL itself relies on the Policy as the basis for offering access over land under its control. It also states that the Policy recognises access where a property has been left without an outlet.
This
establishes
that
dispute
concerns, at least in part, the terms on which BMRCL proposes to provide access under its own Policy. 20.21. The correspondence shows that the parties have not reached an agreement on those terms. BMRCL offered a combined six-metre passage subject to charges and a time-limited
- 54 HC-KAR
agreement.
The
Petitioner
sought
separate
ingress and egress and disputed the proposed conditions.
BMRCL’s
subsequent
position
regarding free access and additional access on payment is considered under the point dealing with prayer (b). 20.22. The history of the dispute also does not warrant rejection of the writ petition. BMRCL informed the Petitioner in 2017 that land would be acquired for the project. The demolition of part of
building
is
admitted.
The
parties
exchanged correspondence concerning access in 2024, followed by the present writ petition in 2025.
This
history
does
not
require
Petitioner to pursue a civil remedy before the Court considers prayers (a) and (b). 20.23. The objection based on the court fee paid in the writ petition is also untenable. The issue is whether the reliefs sought are appropriate for consideration under Article 226, not whether the court fee is lower than that payable in a civil suit. 20.24. The objection that the Petitioner must first institute
a
civil
suit
for
an
easement
of
- 55 HC-KAR
necessity is therefore rejected insofar as it concerns prayers (a) and (b). This conclusion does not determine the nature or extent of any easementary
right
or
precise
access
arrangement to which the Petitioner is entitled. Those issues fall for consideration under the point dealing with prayer (b). THIRD OBJECTION: ESTOPPEL ARISING FROM THE LETTER DATED 31.07.2024 20.25. The Respondents contend that the Petitioner expressed
willingness
in
its
letter
dated
31.07.2024 to pay the applicable charges for access beyond 3.5 metres and cannot now challenge the Policy. 20.26. A statement of willingness to pay for access on proposed terms does not amount to acceptance of the validity of every provision of the Policy. The
Petitioner
challenges,
among
other
matters, the Policy’s termination clause and the conditions
imposed
for
access.
The
Respondents have not established that the Petitioner expressly accepted those provisions or abandoned its right to challenge them.
- 56 HC-KAR
20.27. The
principle
against
approbating
reprobating prevents a party from accepting and obtaining a benefit under a transaction while challenging that same transaction to secure
an
application
inconsistent requires
advantage.
acceptance
Its
of
transaction and the benefit flowing from it. A mere expression of willingness to proceed on proposed
terms
does
not
satisfy
that
requirement. 20.28. BMRCL’s own case is that access would be provided only after the agreement was signed and the required payment was made. It does not contend that the Petitioner signed the agreement,
obtained
access
under
it
or
otherwise received any benefit under the Policy. The Petitioner’s willingness to pay for additional access
therefore
does
not
amount
to
acceptance of the Policy as a whole. 20.29. The subsequent correspondence confirms that no final agreement was reached. The Petitioner sought access on 15.04.2024, did not accept BMRCL’s
proposal
subsequently
dated
objected to
28.06.2024
charges
- 57 HC-KAR
conditions
in
its
27.11.2024.
The
communication
correspondence
dated
does
not
establish that the dispute was settled or that
Petitioner
unequivocally
abandoned
its
challenge. 20.30. The Respondents have also not established that they changed their position to their detriment in reliance on the letter dated 31.07.2024. Their case is that access was not provided because the Petitioner did not sign the agreement. This does
not
establish
estoppel
against
Petitioner. 20.31. The objection based on estoppel is therefore rejected. The letter dated 31.07.2024 does not preclude the Petitioner from challenging the Policy. 20.32. The
Respondents’
objections
must
be
considered separately in relation to the reliefs sought. Prayer (a) raises a constitutional issue concerning the validity of a Policy issued by a public body. Prayer (b) concerns access to the remaining property and can be considered on the basis of the pleadings, admissions and documents on record. The disputed claim for
- 58 HC-KAR
damages under prayer (c) requires a separate assessment
of
facts
of
whether
monetary relief can properly be granted in writ proceedings. 20.33. This Court accordingly answers Point No. (i) by rejecting the objection to maintainability insofar as
it
concerns
prayers
(a)
(b).
The
availability of a civil suit for an easement of necessity does not require the Petitioner to pursue that remedy before this Court considers those prayers. The Respondents have also failed
to
31.07.2024
establish
that
estops
letter
dated
Petitioner
from
challenging the Policy. 20.34. The maintainability and merits of the monetary claim under prayer (c) are left for separate consideration under Point No. (v).
21.
Answer to Point No. (ii): Whether the Petitioner has established grounds for declaring the impugned Way Leave Policy bearing No. BMRCL/LAQ/WLP/5132/2022-23, including its unilateral termination clause, unconstitutional, invalid and unenforceable, as sought under prayer (a) of the writ petition?
- 59 HC-KAR
21.1.
Learned Counsel for the Petitioner, Shri S. Rajendra, challenges the Way Leave Policy at Annexure-C.
He
submits
that
Policy
prescribes different charges for passages of different widths—3.5 to 7 metres, 7 to 12 metres and 12 to 20 metres. This recognises that access requirements vary. The Petitioner submits that BMRCL must consider the actual need for access and the circumstances that created it, rather than apply the charging schedule
without
adequate
regard
to
individual case. 21.2.
Learned Counsel for the Petitioner submits that the Policy requires ten years’ charges to be paid in advance and calculates renewal charges by reference to the guidance value then prevailing. These conditions impose a substantial burden on an owner who requires access because the original frontage was acquired for the Metro project.
The
applicant
Petitioner
seeking
distinguishes
additional
access
an for
convenience from an owner whose existing access
was
lost
through
acquisition.
The
Petitioner had direct access from the main road before
acquisition
submits
that
- 60 HC-KAR
compensation
for
acquired
land
demolished portion of the building did not separately compensate for the loss of access to the remaining property. 21.3.
Learned Counsel for the Petitioner challenges Clause 3, which permits BMRCL to discontinue access without notice, compensation, refund or an alternative route. The Petitioner submits that these conditions make access uncertain even after substantial advance payment. Where BMRCL controls the only effective route, the power to withdraw access should be subject to safeguards, including notice, reasons and a suitable alternative arrangement. The Petitioner states that it declined to sign the proposed agreement because of its terms, not because it was unwilling to cooperate.
21.4.
On
Article
14,
Learned
Counsel
for
Petitioner submits that the Policy does not adequately distinguish owners who have other access from those whose only access was lost through acquisition. Nor does it sufficiently account for differences between properties, including the needs of a substantial commercial
- 61 HC-KAR
building.
The
challenge
is
not
merely
to
standard categories or charges, but to their application without fair consideration of the affected
owner’s
circumstances.
Learned
Counsel also relies on Article 300A and submits that
effect
of
acquisition
on
remaining property must be considered, rather than only the area acquired. Article 19(1)(g) is relied on in relation to lawful commercial use, but the Petitioner
does not claim that
it
guarantees the precise width of access sought. Article 21 was referred to in connection with fire safety. 21.5.
Learned Counsel for the Respondents, Shri Harish Narasimha Murthy, submits that the Policy was framed after due consideration to provide access where acquisition for the Metro project has left a property without an outlet. It recognises a right of necessity by allowing a passage up to 3.5 metres free of charge and prescribing According
charges to
for
additional
Respondents,
width. Policy
provides a fair and transparent system that balances property owners’ needs with public
- 62 HC-KAR
interest and the operational requirements of the Metro project. 21.6.
Learned Counsel for the Respondents submits that the Petitioner has no vested right to demand 12 metres of free access and must comply with the Policy if it seeks additional access.
The
Respondents
rely
on
compensation paid for the acquisition, said to have been calculated at 200% of market value, together with solatium and interest under the Right to Fair Compensation and Transparency in Land
Acquisition,
Rehabilitation
Resettlement Act, 2013. They contend that charging for additional access is not arbitrary. The Respondents further submit that the land belongs to BMRCL, access is permitted at its discretion,
termination
provision
protects BMRCL’s control over its land. They state that, if charges are paid, BMRCL will not cancel the arrangement and will renew it from time to time. 21.7.
Learned Counsel for the Respondents submits that the rates for different widths were fixed after
due
consideration
by
a
competent
- 63 HC-KAR
authority with the technical expertise required for the Metro project. The Respondents contend that the Court should not interfere merely because the Petitioner considers the charges excessive. They also argue that, if the Policy is invalidated, the Petitioner may lose even the benefit of the free 3.5-metre passage and may have to establish an easement before a civil court. The alternative-remedy objection has been considered under Point (i). 21.8.
This point concerns prayer (a), which seeks a declaration that the Way Leave Policy, including its
unilateral
termination
clause,
is
unconstitutional, invalid and unenforceable. The challenge must be decided on the grounds pleaded and the terms of the Policy. The Court does not sit in appeal over every policy choice made by a public authority, nor is it required to decide in the abstract whether a particular percentage of guidance value is the correct charge. The question is whether the challenged provisions are fair and lawful when applied to an owner whose access or frontage was lost through BMRCL’s acquisition for the Metro project.
- 64 HC-KAR
21.9.
The
Policy
is
dated
07.07.2022.
BMRCL
acquired the relevant land on 07.03.2017, and the Petitioner states that the tenant vacated in August 2019 and that part of the building was demolished thereafter. The Policy was issued after the events giving rise to this dispute, but BMRCL has applied it to the Petitioner and relied
on
it
in
its
correspondence
submissions. Its validity must therefore be considered on its merits. 21.10. On account of the very date of the Policy it could be held that the Policy dated 07.07.2022 could not be made applicable by BMRCL to the relevant
land
acquired
on
07.03.2017.
However, since BMRCL has in fact made the Policy applicable to the Petitioner and has relied upon it in its correspondence and submissions, this Court proceeds to decide the challenge to the Policy on merits and considers all the other arguments
addressed
by
respective
counsels. 21.11. The
opening
paragraphs
of
Policy
acknowledge that acquisition for the Metro project has, in some cases, left the remaining
- 65 HC-KAR
buildings or sites without access because their entire
frontage
was
acquired.
They
also
recognise that acquisition of only part of a property may affect direct access from the existing road to the remaining land. The Policy states that access in such cases may be unavoidable because of the nature and extent of the Metro alignment. BMRCL thus recognises that the project itself may create the need for access over its land. The issue is whether the terms prescribed to address that need are fair and lawful. 21.12. Clause 1 of the Way Leave Policy is reproduced below: 1. Way leave facilities on BMRCL land involve limited use of land by a party for a specified purpose like passage etc. without conferring upon the party any ownership or right of possession or occupation of the land and without in any way affecting the BMRCL's title, possession, control and use of the land.
21.13. Clause 1 defines a way-leave facility as limited use of BMRCL land for a specified purpose, without transferring ownership, possession or occupation.
The
Petitioner
does
not
claim
ownership of the land over which access is
- 66 HC-KAR
sought. Its case is that the conditions imposed on access must nevertheless be fair where the property has been left without access because of the Metro project. 21.14. Clause 2 is reproduced below: 2. The requests/applications for granting way leave facilities shall be considered with due regard to the circumstances of each case. Some such circumstances may be :(a) Non-availability of any other means of access to properties / houses/places of business. (b) Non-feasibility of provision of water supply, electricity, sewerage etc. from any other direction. (c) Other means of access are available, but not enough to meet the requirements of the applicant
21.15. Clause 7 is reproduced below: 7. Way leave facilities should not be granted as a matter of routine, but only after consideration of case on merits after site inspection. Special care should be taken to see that the way leave facility doesn't in any way impinge on the safety & security of metro operations & BMRCL property.
21.16. Clause 12 is reproduced below: 12. In cases not covered by the above way leave policy, a decision shall be taken with the approval of the Managing Director.
- 67 HC-KAR
21.17. Clauses 2, 7 and 12 require BMRCL to consider each application on its merits, including the availability or adequacy of other access and the feasibility of utility connections from another direction. Clause 7 requires a site inspection and protection of Metro operations and BMRCL property. Clause 12 permits the Managing Director to decide cases not covered by the Policy.
These
provisions
recognise
that
individual circumstances matter, but do not by themselves
resolve
challenge
to
mandatory termination and charging provisions. 21.18. Clause 3, including the termination provision challenged by the Petitioner, is reproduced below: 3. In genuine and unavoidable cases, way leave facility may be allowed, if feasible and for the developments coming up on this property, after execution of proper agreement. Land cannot be given on lease/license in such cases and only permission / leave is to be granted for a limited use which is to be specified in detail in the agreement. To avoid any misunderstanding on this score, the agreement should not use terms like ‘Lease/License and Rent/License fee etc.’ but only permission and way leave. The agreement should also clearly stipulate that the Metro Rail Administration retains full rights to enter upon, pass through or use the land, or to
- 68 HC-KAR
discontinue the way leave facility at any time, without any notice to the party. In the event of the way leave facility being discontinued with, the BMRCL will not be liable to pay any compensation or reimburse any amount to the party, nor to provide any alternative arrangement for access etc., In such a case, any installations like underground pipelines etc., put up by the party are liable to be removed/shifted by the party at his/its own cost.
21.19. Clause 3 permits BMRCL to discontinue access at
any
time
without
notice.
It
excludes
compensation, reimbursement or refund and does not require BMRCL to provide alternative access. It also places on the user the cost of removing
or
shifting
installations,
including
underground pipelines. The issue is whether these terms are fair and lawful when applied to an owner whose original frontage and access were lost through acquisition for the Metro project. 21.20. Clause 4 is reproduced hereunder for ease of reference: 4. The following amount shall be charged by BMRCL on the party requesting for the way leave, for different activities It shall be made clear in the agreement that these charges are subject to
- 69 HC-KAR
revision and the revised rates shall be applicable when the agreement is revised. Item
Type of way leave
1(a)
Passage/pathway on/across BMRCL land (up to 3.5 metres wide) for vehicular access. (If property became landlocked, with no other access as on the date of acquisition of the land) Passage for vehicles, scooters etc. (i.e., between 3.5–7 metres wide)
1(b)
1(c)
Passage for vehicles, scooters etc. (i.e., between 7–12 metres wide)
Way leave charges Free of cost
3% of the guidance value notified by the State Government per annum. Way leave agreement shall be entered into for 10 years and way leave charges shall be paid upfront for the 10-year period. Renewal of agreement after 10 years will be at 3% of the then prevailing guidance value per annum. 6% of the guidance
- 70 HC-KAR
1(d)
Passage for vehicles, scooters etc. (i.e., between 12–20 metres wide)
value notified by the State Government per annum. Way leave agreement shall be entered into for 10 years and way leave charges shall be paid upfront for the 10-year period. Renewal of agreement after 10 years will be at 6% of the then prevailing guidance value per annum. 10% of the guidance value notified by the State Government per annum. Way leave agreement shall be entered into for 10 years and way leave charges shall be paid
- 71 HC-KAR
2(a)
Electric lines (domestic purpose/service line) crossing for individual houses, shops etc. (both underground and overhead)
2(b)
Water/sewage/effluent pipeline crossing for individual up to 300 mm diameter. Electrical crossings by State Electricity Boards and Central Agencies.
2(c)
upfront for the 10-year period. Renewal of agreement after 10 years will be at 10% of the then prevailing guidance value per annum. Rs. 25,000/per annum. Way leave agreement shall be entered into for 10 years and the charges for 10 years shall be paid upfront. Renewal of this agreement will be at the discretion of BMRCL for another 10 years with a 50% increase in charges. Same as item 2(a). Same as item 2(a).
- 72 HC-KAR
2(d)
2(e) 2(f)
Open drains and overground water/sewage/oil/gas/effluent pipelines by private parties (including public sector undertakings). Underground oil/gas/pipelines. Underground/overhead electrical crossing other than covered under item 2(c); underground cables and alignment in favour of the Department of Telecommunications/BSNL/other telecom operators. This includes laying of Optic Fiber Cable (OFC). If electrical cable/pipeline is to be laid parallel to the BMRCL alignment in BMRCL land.
Same as item 2(a).
Same as item 2(a). Same as item 2(a).
(a) Up to a length of 250 metres: Rs. 25,000/- per annum. (b) Beyond 250 metres: Rs. 100 per running metre per annum. Way leave agreement shall be entered into for 10 years and way leave charges shall be paid upfront for the 10-year period. Renewal of this agreement will be at the discretion of BMRCL for
- 73 HC-KAR
another 10 years with a 50% increase in charges.
Note: i) Acquired land means land which is acquired /purchased / surrendered for the Bangalore Metro Rail Project, from the party seeking way leave permission. ii) Way leave charges will be calculated based on the guidance value as on the date of original application for way leave facility by the applicant. iii) Way leave charges shall be remitted upfront for a block period of 10 years for all the way leave permissions.
21.21. Clause 9 is reproduced below: 9. In all cases of way leave facility granted, proper agreement should be executed Agreement should provide for remittance of way leave charges upfront on signing of the agreement and revision by way leave charges from time to time, as provided in the policy.
21.22. Read together, Clauses 4 and 9 and Note (iii) provide free vehicular access up to 3.5 metres for a qualifying landlocked property, while wider passages attract charges based on the guidance value, payable ten years in advance. Since the first 3.5 metres is free, the charges under items 1(b) to 1(d) are leviable only for the width over and above 3.5 metres. The
- 74 HC-KAR
Policy also prescribes charges for specified utility crossings. The question is whether this structure fairly accounts for an owner who requires
replacement
access
because
original frontage was acquired for the Metro project. WHETHER ACCESS IS MERELY A DISCRETIONARY BENEFIT 21.23. Learned Counsel for the Respondents submits that the land belongs to BMRCL and that wayleave
access
is
granted
at
its
discretion.
BMRCL’s ownership is not disputed. However, ownership alone does not permit a public body to impose arbitrary conditions on access to a property. 21.24. The Petitioner’s case is that BMRCL’s acquisition for the Metro project removed the direct access or
frontage
of
property,
leaving
remaining property dependent on way-leave access. The Petitioner belongs to the class of owners whose access was lost in this manner. Clause 4 recognises the special position of a property that became landlocked and had no other
access
on
date
of
acquisition,
- 75 HC-KAR
providing free access up to 3.5 metres. Clauses 2 and 7 require individual consideration of applications, site
inspection and
regard
to
Metro safety. The validity of the challenged termination and charging provisions must be assessed against this context. THE TERMINATION PROVISION AND ARTICLE 14 21.25. Article 14 requires public authorities to act fairly and not arbitrarily. Clause 3 permits BMRCL to discontinue access at any time without notice. It does not require reasons or specify the circumstances in which termination may take place. It also excludes compensation or refund and provides no alternative access. 21.26. Read with Clause 4, which requires ten years’ charges in advance for wider passages, Clause 3 permits BMRCL to discontinue access after receiving advance payment without refunding any part of it. The owner must also bear the cost of removing or shifting installations. 21.27. These terms are inconsistent with the Policy’s requirement for individual consideration before access is granted. Although Clauses 2 and 7
- 76 HC-KAR
require BMRCL to consider the circumstances of
property
Metro
safety,
Clause
permits access to be withdrawn without notice, reasons or safeguards. 21.28. BMRCL must be able to discontinue a way-leave facility for reasons relating to safety, security or Metro
operations.
The
defect
lies
in
unrestricted power conferred by Clause 3 and the absence of safeguards against arbitrary termination. The provision is therefore arbitrary under Article 14 insofar as it permits access to be
withdrawn
without
notice,
refund
or
alternative access in the circumstances of the Petitioner’s case. 21.29. BMRCL’s assurance that it will not cancel access if charges are paid and that the arrangement will be renewed from time to time does not cure
defect.
That
assurance
is
not
contained in the Policy. Its validity must be assessed by the power Clause 3 confers, not by an assurance about how BMRCL expects to exercise it. THE CHARGING PROVISIONS AND ARTICLE 14
- 77 HC-KAR
21.30. The Petitioner does not contend that BMRCL can never charge for the use of its land. The challenge is to applying the prescribed charges to
replacement
access
required
in
circumstances identified above. 21.31. Clause
prescribes
charges
according
to
passage width. It does not distinguish between an applicant seeking additional access for other reasons
replacement recognises
an
owner
access. that
who
Although
existing
access
requires Clause
may
be
insufficient, the charging provisions do not adequately account for the circumstances that necessitate replacement access. 21.32. The width of a passage may affect the use of BMRCL land and Metro operations. However, applying the same charging structure without accounting for the reason access is required places an arbitrary financial burden on the Petitioner. 21.33. BMRCL relies on the compensation paid for the acquired land and demolished structure. That payment does not, by itself, establish that the separate charging conditions for replacement
- 78 HC-KAR
access are fair. The scope of compensation and its relationship to the claim for loss of access fall for consideration under Point (iv). 21.34. The requirement to pay ten years’ charges in advance further aggravates the burden. The charges are linked to the guidance value, and renewal
charges
are
based
on
value
prevailing at the time of renewal. Read with Clause 3, the Policy requires a substantial advance payment for access that may be discontinued without notice or refund. 21.35. The Court does not question the technical competence of the officers who fixed the rates or revised the percentages. The constitutional defect lies in the charging structure and its failure to account for the circumstances in which replacement access is required. 21.36. BMRCL’s submission that the Petitioner has no vested right to 12 metres of free access concerns the width and form of access sought. That issue falls under Point (iii). The present issue is the validity of the charging provisions.
- 79 HC-KAR
ARTICLE
300A
AND
THE
ULTRA
VIRES
CHALLENGE 21.37. Article 300A provides that no person shall be deprived of property except by authority of law. The acquisition in this case was undertaken under law and is not challenged in this petition. The present issue concerns the
conditions
imposed on access to the remaining property. The loss of access affects its practical use and is relevant to the assessment of the Policy. 21.38. The finding rests principally on Article 14. Article 300A reinforces the need to consider the effect of the Policy on the use of the remaining property, but does not, by itself, establish a right to a passage of any particular width. 21.39. The Petitioner also challenges the Policy as ultra
vires.
However,
neither
party
has
identified the specific statutory provision under which the Policy was framed or the statutory limit that it is alleged to exceed. No separate finding is made on that ground.
- 80 HC-KAR
ARTICLE
19(1)(G)
AND
THE
RESPONDENTS’
OBJECTION 21.40. Article 19(1)(g) protects the right to practise a profession or carry on an occupation, trade or business, subject to constitutionally permitted restrictions. The Petitioner does not claim that this provision guarantees access of the precise width sought. The finding on the challenged provisions therefore rests on Article 14. 21.41. BMRCL submits that invalidating the challenged provisions may deprive the Petitioner of even the free 3.5-metre passage. This objection does not justify retaining provisions that impose arbitrary conditions. The Policy’s provision for free access up to 3.5 metres in qualifying cases is not itself under challenge. 21.42. For the reasons stated above, THIS Court answers Point No. (ii) by holding that the Petitioner has established grounds for declaring the following provisions of the Way Leave Policy unconstitutional, invalid and unenforceable in their application:
- 81 HC-KAR
21.42.1. Clause 3, insofar as it permits BMRCL to discontinue access at any time without notice and excludes refund or alternative access upon discontinuance. 21.42.2. The charging provisions of Clause 4, namely items 1(b), 1(c) and 1(d), and items 2(a) and 2(b) relating to electricity lines and water or sewage pipelines serving the remaining property, read with
Note
(iii),
Clause
9,
requirements for payment of ten years’ charges
in
advance
revision
or
renewal of charges by reference to the prevailing guidance value. 21.43. The
declaration
does
not
invalidate
remainder of the Way Leave Policy. 22.
Answer to Point No. (iii): Whether the Petitioner is entitled to a writ of mandamus under prayer (b), directing the Respondents to provide, permanently and free of cost, an unrestricted six-metre-wide ingress and a separate six-metre-wide egress to the Schedule Property from the northern side, together with the necessary rights to install and maintain water, electricity and sewerage connections over the relevant acquired land; and, in particular, whether the Respondents can
- 82 HC-KAR
restrict such access to the arrangement contemplated under the impugned Way Leave Policy and subject any additional access to licence charges and time-bound conditions? 22.1. Learned Counsel for the Petitioner submits that the Petitioner owns Municipal No. 28/B, PID No. 57-137-28B,
Sarakki
Industrial
Layout,
measuring 766.26 square metres. The property contains a commercial building with a super built-up area of 21,839 square feet, comprising the ground floor and four upper floors. Before acquisition, the property had a full and wide entry and exit on the eastern side facing the main road, and the entire frontage served as access.
On
07.03.2017,
BMRCL,
through
KIADB, acquired 152 square metres on the eastern side. 22.2. Learned Counsel submits that the road-facing portion of the building was demolished and the Metro station was constructed. The acquisition took away the frontage and former access, leaving
remaining
property
without
effective ingress or egress. The photographs and site layout are relied on to show that the Metro station now abuts the property and that
- 83 HC-KAR
no other access is available. The Petitioner did not voluntarily surrender the frontage; the land was acquired in exercise of the State’s power of eminent domain. 22.3. Learned Counsel submits that the effect of acquisition cannot be assessed only by the area taken. The use made of the acquired land may affect access to, and the practical use of, the remaining
property.
Compensation
for
acquired land and demolished structure does not, by itself, resolve whether the remaining property has reasonable and usable access. The request
is
for
a
replacement
necessary
by
Metro
additional
facility
route
project,
sought
made
not
merely
an for
convenience. 22.4. Learned Counsel submits that, by letter dated 15.04.2024, the Petitioner sought a separate six-metre ingress and a separate six-metre egress from the northern side. BMRCL’s replies dated 28.06.2024 and 19.11.2024 offered a combined
six-metre
passage,
subject
to
advance way-leave charges and a ten-year agreement. By letter dated 23.12.2024, BMRCL
- 84 HC-KAR
stated that free access was available only up to 3.5 metres. Before this Court, BMRCL has offered 3.5 metres free and a further five metres on payment. None of these proposals provides the separate entry and exit lanes sought. 22.5. Learned Counsel submits that the Schedule Property
is
a
large
commercial
building
previously leased to M/s GraphX Solution India Private Limited. The Property would once again have to be let out, and its use involves employees, providers,
customers, vehicles,
visitors,
deliveries,
service
goods
maintenance. Pedestrian access alone would not be adequate. Access must be suited to the building’s size, layout and lawful commercial use, including access to its parking facilities and the movement of goods and materials. 22.6. Learned
Counsel
further
submits
that
fire
tenders and other emergency vehicles must be able to reach the building. Adequacy depends not only on nominal width but also on turning radius,
clear
height,
alignment
obstructions. The Policy’s minimum free width
- 85 HC-KAR
cannot replace a site-specific assessment or override applicable safety requirements. A fire in the building may also pose a risk to the adjoining Metro station and its commuters. The Petitioner relies on Article 21 in support of the need for safe access. 22.7. Learned Counsel submits that Clause 4 of the Way Leave Policy provides free access up to 3.5 metres for qualifying landlocked properties, but that width cannot be treated as sufficient in every case. The Petitioner does not contend that Article 19(1)(g) guarantees any particular width of access. Its submission is that the State and its instrumentalities must not disregard the effect of their actions on the lawful use of the remaining property. The Petitioner seeks a proportionate arrangement that permits the Metro
project
to
continue
while
restoring
effective access. 22.8. Learned Counsel submits that prayer (b) seeks permanent
access
comprising
a
six-metre
ingress and a separate six-metre egress from the northern side, together with the right to install
maintain
water,
electricity
- 86 HC-KAR
sewerage lines over the relevant land. The width and configuration must be assessed in relation to the property’s size, shape, use and applicable safety and operational requirements. 22.9. Learned Counsel for the Respondents submits that BMRCL admits acquisition of 152 square metres on the eastern side of the Petitioner’s property. The acquired land is bounded by the road to the east, the remaining portion of Property No. 28/B to the west, the property of Prema Raghu N. V. to the north and the property of Madhusudhan P. Patel to the south. BMRCL admits that the acquired portion is now its property and that part of the building was demolished after possession was taken through the Special Land Acquisition Officer, for which compensation was paid. 22.10. Learned Counsel submits that BMRCL is not obliged to provide twelve metres of free access. It is willing to provide 3.5 metres free under
Policy
a
further
five
metres
on
payment. BMRCL contends that the northern land is also required for Metro infrastructure
- 87 HC-KAR
and that the Petitioner has no vested right to twelve metres of free access. 22.11. On utility connections, Learned Counsel for the Respondents initially submits that the Policy does not cover water, electricity and sewerage connections
through
BMRCL
land.
BMRCL
nevertheless states that a joint inspection was held on 28.03.2025 in the presence of the Tahsildar and BMRCL’s Assistant Engineer and Legal Advisor, and that locations for electric, sewage and water lines were marked. The plan is produced as Annexure-R2. BMRCL is willing to permit the lines at those points, subject to the Policy and payment of applicable charges. It also states that it is willing to provide an additional five metres of access over and above the free 3.5 metres on the same conditions. The Petitioner has throughout sought separate ingress and egress, each six metres wide. ISSUES AND MATERIAL FACTS 22.12. Point (iii) concerns the relief sought under prayer
(b):
permanent
free
access
comprising a six-metre ingress and a separate six-metre
egress
from
northern
side,
- 88 HC-KAR
together with the right to install and maintain water,
electricity
questions
are
what
sewerage
lines.
access
reasonably
is
The
required, whether BMRCL may confine the Petitioner to its standard Policy arrangement, and on what terms replacement access and utility routes must be provided. The validity of
relevant
charging
termination
provisions has been considered under Point (ii). 22.13. The material facts are substantially undisputed. BMRCL admits that 152 square metres of the eastern, road-facing portion were acquired, that the land is now BMRCL property, and that part of the building was demolished. The correspondence records the Petitioner’s request for separate six-metre entry and exit lanes on 15.04.2024; BMRCL’s proposals for a combined six-metre
passage
on
28.06.2024
19.11.2024, subject to advance payment and a ten-year
agreement;
its
letter
dated
23.12.2024 referring to free access of 3.5 metres; and its offer before this Court of 3.5 metres free plus five metres on payment. None provides the separate lanes sought.
- 89 HC-KAR
22.14. BMRCL has not identified another effective route into the Schedule Property. Its own proposals to provide access over land under its control support the conclusion that the property has lost its former access and requires a replacement route. BMRCL has admitted that the land on the northern side belongs to it, and it is from that land that it proposed to provide 3.5 metres free and a further five metres on payment. There is no dispute as to BMRCL’s ownership of that land. ENTITLEMENT TO REPLACEMENT ACCESS; WHY IT MUST BE FREE AND PERMANENT 22.15. The Petitioner previously had direct access from the main road on the eastern side. That frontage was acquired and the road-facing part of the building was demolished for the Metro project. The remaining property thereby lost its former access. The Petitioner seeks to replace access
lost
construction,
through not
acquisition
merely
to
improve
convenience. 22.16. BMRCL’s ownership of the land proposed for the replacement route entitles it to protect its
- 90 HC-KAR
property and the safe operation of the Metro. It does
not,
remaining
by
itself,
property
answer may
be
whether left
without
effective access after the project took away the former route. The Policy itself recognises that acquisition
may
leave
a
property
without
access. In the circumstances of this case, replacement access is necessary to make the remaining
property
reasonably
usable.
The
source of the Petitioner’s entitlement is the admitted fact that BMRCL, by its acquisition and construction of the Metro station, closed the existing access and left the remaining property without access. Having deprived the Petitioner of its access, BMRCL is bound to provide replacement access, and it is therefore unnecessary to examine whether an easement of necessity is made out. 22.17. Under
Point
provisions
(ii),
relevant
charging
Policy’s
unilateral
termination provision have been held invalid and unenforceable insofar as they apply to owners whose access was lost through BMRCL acquisition
who
require
replacement
access. BMRCL cannot rely on those provisions
- 91 HC-KAR
to
require
advance
payment,
agreement,
renewal
at
a
ten-year
revised
rates
or
discretionary withdrawal of access in this case. 22.18. Compensation demolished resolve
for
structure
separate
acquired does
not,
question
land
by
itself,
of
access.
Compensation is considered under Point (iv). For present purposes, payment of acquisition compensation is not a sufficient reason to require the Petitioner to pay again for the route made necessary by the acquisition. 22.19. The Policy’s free-access provision recognises the distinction between replacement access made necessary by acquisition and additional access sought for convenience. However, the standard
width
conclusively
of
determine
3.5
metres
what
this
cannot property
reasonably requires. The need for replacement access will continue for as long as the Schedule Property requires it. A ten-year permission subject to renewal and revised charges would leave use of the property dependent on periodic approval and expose the Petitioner to the risk of losing access. No sufficient reason has been
- 92 HC-KAR
shown for imposing that uncertainty. Access must therefore be permanent and continue in perpetuity,
subject
safeguards
that
to
law
protect
reasonable
Metro
operations
without defeating the right granted. WHETHER SEPARATE SIX-METRE INGRESS AND EGRESS ARE JUSTIFIED 22.20. The Petitioner seeks a six-metre ingress and a separate six-metre egress. BMRCL has offered a combined six-metre passage and later offered 3.5 metres free plus five metres on payment, making 8.5 metres in total. The question is whether the proposed arrangement provides safe, reasonable and dependable access for a large commercial building, including two-way vehicle movement, deliveries, movement of goods and access by emergency services. 22.21. An owner cannot insist on a width merely because it is preferred. The width must bear a reasonable relationship to the size and use of the property, site configuration and applicable safety and operational requirements. However, a
standard
conclusive
width
in
where
a
policy
Policy
cannot
itself
be
requires
- 93 HC-KAR
individual consideration. Clause 2 identifies inadequate
alternative
access
as
relevant;
Clause 7 requires consideration of the merits after site inspection; and Clause 12 provides for cases not covered by the Policy to be decided with the Managing Director’s approval. 22.22. The Schedule Property contains a commercial building with a super built-up area of 21,839 square
feet
facilities.
over
Its
five
floors
parking
use
involves
employees,
customers,
service
providers,
deliveries,
maintenance
movement
of
goods.
A
pedestrian route or a single narrow passage does not, without more, establish adequate access. BMRCL
has not
produced material
showing that separate lanes are unnecessary or that
a
lesser
configuration
would
provide
equivalent and dependable access. 22.23. The dimensions of ordinary vehicles illustrate the practical issue but do not determine the technical requirement. A bus or goods truck may
be
about
2.5
to
3.5
metres
wide,
depending on the vehicle, and mirrors require additional clearance. Fire engines vary in size
- 94 HC-KAR
and need sufficient clear width and turning space. Actual requirements depend on vehicle dimensions,
turning
radius,
clear
height,
alignment, surface and obstructions. No sitespecific technical report on these matters has been identified in the material before the Court. 22.24. Separate
ingress
egress
reduce
likelihood that entering and exiting vehicles will obstruct one another. In a single passage, a vehicle breakdown or obstruction may prevent both entry and exit and delay emergency access. Separate lanes do not eliminate every risk, but they provide a more dependable arrangement. 22.25. BMRCL’s proposals have varied: a combined six-metre
passage
in
letters
dated
28.06.2024 and 19.11.2024; 3.5 metres free in the letter dated 23.12.2024; and 3.5 metres free plus five metres on payment before this Court. These proposals show the widths BMRCL was willing to offer under its Policy. 22.26. The joint inspection dated 28.03.2025 is relied on in relation to locations marked for utility lines. The record does not establish that BMRCL
- 95 HC-KAR
assessed the width and configuration needed for
vehicular
movement,
access,
emergency
including access
two-way
risk
of
obstruction. Nor has it explained why separate entry and exit lanes cannot be accommodated. 22.27. BMRCL’s
statement
that
it
was
willing
to
provide five metres in addition to the free 3.5 metres does not establish that the Petitioner abandoned the claim for separate six-metre lanes. The Petitioner did not accept that offer, and no document records any reduction in the request.
The
Petitioner’s
letter
dated
15.04.2024 sought separate six-metre entry and exit lanes, and its reply dated 27.11.2024 maintained that request while disputing the charges. The Petitioner continues to seek the same
relief.
In
any event, one
combined
passage of 8.5 metres is not equivalent to two separate six-metre lanes. 22.28. BMRCL
submits that the northern
land is
required for infrastructure. The Metro’s public purpose and operational requirements must be respected. However, BMRCL has not identified a particular plan, structure, operational need or
- 96 HC-KAR
safety constraint that would be affected by the access sought. Nor has it explained why the land it is willing to use for an 8.5-metre passage cannot accommodate separate entry and exit lanes. 22.29. The Policy contemplates passages wider than 3.5 metres, with categories for widths of 3.5–7 metres,
7–12
metres
12–20
metres.
BMRCL has described the request as a total width of twelve metres. The Policy therefore does
not
treat
impermissible.
that
The
width
issue
as
is
inherently
whether
configuration is justified on the facts and whether
BMRCL
properly
considered
circumstances. The charging provisions cannot defeat the relief for the reasons given under Point (ii). BUILDING
REGULATIONS,
ZONING
AND
DEVELOPMENT POTENTIAL 22.30. The Petitioner relies on Bangalore Mahanagara Palike Building Bye-laws, 2003, of which Byelaw 9.2, read with Table 6, and Bye-law 9.10 link plot coverage and Floor Area Ratio (FAR) for commercial buildings, among other things,
- 97 HC-KAR
to plot area, development-area classification and road width. The Petitioner submits that replacement access must permit lawful and effective use of the existing building under applicable building regulations. 22.31. Bye-law 9.2, Table 6, and Bye-law 9.10 of the Bangalore Mahanagara Palike Building Byelaws, 2003, are reproduced hereunder for easy reference: 9.2 Exterior open spaces/ setbacks, coverage, floor area ratio, numbers of floors and heights The setbacks required on all the sides of building/s, maximum plot coverage, maximum FAR, maximum number of floors, maximum height of buildings that are permissible for different dimensioned sites and widths of roads are set out in Tables 4, 5 and 6 given below.
TABLE 6 (Bye-law 9.2 and 9.10) COVERAGE AND FAR FOR RESIDENTIAL, COMMERCIAL, PUBLIC AND SEMI-PUBLIC, TRAFFIC & TRANSPORTATION, AND PUBLIC UTILITY BUILDING Public & Semi Plot Residential
Commercial
Public T&T &
Road width
Public Utilities
(Mtrs)
Area in Sq. mtr. Plot
F.A.R.
Plot
F.A.R.
Plot
F.A.R.
- 98 HC-KAR
Cove-
Max.
Cove-
Max.
Cove-
rage
rage
rage
Max.
Max.
Max.
Max.
A – INTENSELY DEVELOPED AREA Upto 240
65%
0.75
65%
1.00
60%
1.00
Upto 6
60%
0.75
60%
1.00
55%
1.00
Over 6 upto 9
60%
1.00
60%
1.25
50%
1.00
Over 9 upto 12
60%
1.00
60%
1.25
50%
1.25
Over 12 upto 15
60%
1.25
55%
1.50
45%
1.25
Over 15
Over 240 Upto 500 Over 500 Upto 750 Over 750 Upto 1000 Over 1000
B – MODERATELY DEVELOPED AREA Upto 240
65%
1.00
65%
1.25
60%
1.00
Upto 9
60%
1.25
60%
1.50
55%
1.25
Over 9 upto 12
60%
1.25
60%
1.50
50%
1.25
Over 12 upto 15
60%
1.50
60%
1.75
50%
1.50
Over 15 upto 18
60%
1.75
55%
1.75
45%
1.50
Over 18
Over 240 Upto 500 Over 500 Upto 750 Over 750 Upto 1000 Over 1000
C - SPARSELY DEVELOPED AREA Upto 240
65%
1.00
65%
1.25
60%
1.25
Upto 9
60%
1.25
60%
1.50
55%
1.50
Over 9 upto 12
60%
1.50
60%
1.75
50%
1.50
Over 12 upto 15
Over 240 Upto 500 Over 500
- 99 HC-KAR
Upto 750 Over 750 60%
1.50
60%
1.75
50%
1.80
Over 15 upto 18
60%
2.00
55%
2.00
45%
1.80
Over 18
upto 1000 Over 1000
Note 1: The dimensions in British system if any, adopted for the dimensions of plots may be interpreted as follows in Metric system and set backs may be applied accordingly. 20’-0” – 6.0 m 30’-0” – 9.0 m 40’-0” – 12.0 m 50’-0” – 15.0 m 60’0” – 18.0 m 80’-0” – 24.0 m Note 2 : The open spaces to be provided shall conform to the height necessary to consume the permissible FAR. Note 3: (a) The front and rear set backs shall be with reference to the depth of the site. (b) The left and right set backs shall be with reference to the width of the site. (c) If the height of a building exceeds 9.5 metres, the set backs to be provided shall be higher of the set backs specified in tables 4 and 5. Note 4 : Building lines have been prescribed to certain roads by the Bangalore Development Authority in Table 33 of the Zoning Regulations. This table is appended as Schedule X to these byelaws. In such cases, the front set back or the building line which is higher of the two shall be provided. Note 5 : In the case of corner sites both the sides facing the road shall be treated as front side and regulations applied accordingly to maintain the building line on these roads and to provide better visibility.
- 100 HC-KAR
Note 6 : In the case of a building facing more than two roads, the plot should be considered as corner plot taking two wider roads into consideration. Note 7 : In the case of sites facing roads both in front and rear, both the sides facing roads should be treated as front and other two sides not facing roads should be treated as right and the setbacks be applied accordingly. Note 8 : In case where the plinth of the building is not parallel to the property line, the setbacks shall not be less than the specified setbacks at any given point on any side. Note 9 : In case of irregular plots the set-backs are to be calculated according to the depth or width at the points where the depths or widths are varying. Average set-backs shall not be considered in such cases. Note 10 : The left and right set-backs may be interchanged by the Authority in exceptional cases due to existing structures like; open well and also considering the topography of the land. However, this shall be resorted to by the Authority only as an exception. Note 11: Set-backs should be provided in the owner’s plot. Public open space or conservancy should not be considered as set-backs. Note 12: In case of two or more buildings proposed on a single site, the set-backs shall be applied by considering them as a common building. In such cases, the distance between the two buildings shall be minimum of half the height of the taller building. Note 13: For plots with an area of more than 750 sqm. bell mouth entrance shall be provided.
- 101 HC-KAR
Note 14: The front set back mentioned above are minimum. The building shall be shifted back to the building lines, if any declared by any competent authority. 9.10 Limitations of floor area and covered area 9.10.1 The coverage, and FAR, for different sizes of plots with reference to existing road width as limiting factor are given in the table No.6 for various types of buildings like residential, commercial, public and semi-public, etc. The local planning area of Bangalore City is divided into A, B & C areas by the Bangalore Development Authority for the purpose of regulating building constructions as under:A: Intensely developed area. B: Moderately developed area. C:– Sparsely developed area . Note: (1) A map showing the details of A, B and C areas is available in the office of the Bangalore Development Authority, Bangalore. A copy of this map is appended to these bye-laws. Note: (2) When two sides of the same road are included in two different areas like: A and B or A and C, then both the sides shall be treated as intensively developed area (‘A’ area) up to one property depth. Note: (3) When two sides of the same road are included in two different areas like: B and C, then both the sides shall be treated as moderately developed area (‘B’ area) up to one property depth. 9.10.2 In respect of the following buildings, the maximum coverage shall be as prescribed below.
- 102 HC-KAR
Building Permissible maximum coverage a. Hospital 25% b. Health centre/nursing home 33.33% c. Nursery school/primary school 33.33% d. Secondary school 30% e. College 25% 9.10.3 (a) The floor area of a building shall be the aggregate area of the floors of all parts of the building including thickness of walls, parking area, staircase rooms, lift rooms, ramps, escalators, machine rooms, balconies, ducts including sanitary ducts, water tanks, lobbies, corridors, foyers and such other parts provided for common service. (b) The floor area ratio shall exempt the floor area used for the following purposes, namely:- (i) parking space (ii) staircase rooms (iii) lift rooms (iv) ramps (v) escalators (vi) machine rooms (vii) open balconies (viii) ducts including sanitary ducts and (ix) water tanks. (c) Parking area shall be exempted to the extent required for the building. (d) The area covered by the following structures on the roof are exempted from the floor area upto fifteen percent of the area of the roof over which they are erected, namely:- (i) staircase rooms (ii) lift machine rooms (iii) pent house (iv) water tanks (v) equipments for ventilation, air conditioning and similar services. (e) Lobbies, corridors provided in the plan shall be considered for F.A.R. (f) The nomenclature of certain roads may differ with those mentioned in the District Maps of the Revised C.D.P. In such cases, the location of the site may be considered to determine the land use. Note : One penthouse only is permissible for a building. The area of the penthouse with staircase room shall be limited to 19 sq.mtrs. If this limit is
- 103 HC-KAR
exceeded, the structures shall be considered for reckoning the FAR. 9.10.4 When sites do not face the roads of required width noted against each, then the FAR applicable to the corresponding width of roads shall apply. 9.10.5 When a site faces wider road than the one prescribed against it, the FAR shall be restricted only to the limit prescribed for the area of that particular site. 9.10.6 When coverage is less than the maximum prescribed in Table 6, floors and height beyond the limits indicated in table 5 may be permitted to utilise the full FAR subject to the provision of minimum set backs prescribed in Tables 4 and 5, whichever is applicable. 9.10.7 The set-backs and coverage shall be determined irrespective of the width of the road.
22.32. The schedule of the property in question as per the lease deed is as under:SCHEDULE All that piece and parcel of premises having a super built-up area of 21,839 sq. ft. consisting Stilt + 3 floors + terrace, situated at Plot no 28/ B, Bannergahatta Main Road, Sarakki Industrial Area, JP Nagar, Phase III, Bangalore – 560076
22.33. A perusal of the above would indicate that the super built-up area consists of stilt + three floors + terrace. The said building has been put to commercial use. The National Building Code,
- 104 HC-KAR
2016 determines the access required for a building in order to provide a No-objection Certificate by the fire and emergency services. The
fire
emergency
services
have
themselves not fixed any particular width of the road, nor does the building bylaws or the zonal regulation fix such width. 22.34. Regulation
4.6,
which
is
applicable
regulation in relation thereto is reproduced hereunder for ease of reference: 4.6 For high rise buildings and special buildings (see Part 4 'Fire and Life Safety' of the Code), the following additional provisions of means of access shall be ensured: a) The width of the main street on which the building abuts shall not be less than 12 m and one end of this street shall join another street not less than 12m in width. b) The road shall not terminate in a dead end; except in the case of residential building, up to a height of 30 m. c) The approach to the building and open spaces on all its sides shall be not less than 6 m in width, and a turning radius of minimum 9 m shall be provided for fire tender movement of fire tenders weighing up to 45 t. The same shall be hard surface capable of taking the mass of fire tender, weighing up to 45 t minimum. For heavier fire tenders, the minimum width, turning radius and the hard surface capable of taking the fire tender loads shall be as per the requirement laid down by the Fire Department. The layout for the open space for fire tender movement
- 105 HC-KAR
shall be done in consultation with the Chief Fire Officer of the city, which shall be kept free of obstructions shall be motorable. The compulsory open spaces around the building shall not be used for parking. d) The main entrance to the plot shall be of adequate width to allow easy access to the fire engine and in no case shall it measure less than 6 m. The entrance gate shall fold back against the compound wall of the premises, thus leaving the exterior accessway within the plot free for movement of fire tender. If the main entrance at the boundary wall is built over, the minimum clearance shall be 4.5 m.
22.35. A
perusal
of
above
regulation
would
indicate that other than a high-rise building or special building, the width of the main street on which the building abuts shall not be less than 12 meters and one end of the street shall join another street not less than 12 meters in width. In the present case, what was requested for by the Petitioner was 6 meters separate ingress and 6 meters separate egress which is in tune with the requirement of Regulation 4.6 of the National Building Code. 22.36. Clause (ix) of Regulation 3.16 of the Zonal Regulations of the Revised Master Plan 2015, is reproduced hereunder for ease of reference:
- 106 HC-KAR
ix. Areas which fall within 150m radius from the metro terminals shall be eligible for a maximum FAR of 4 for all permissible uses, irrespective of the FAR applicable for the respective uses in the respective tables. However, this will be applied only after the completion of the metro stations and also the same to be confirmed by the BMRCL. Till such time the existing regulations shall apply.
22.37. The
above
Clause
IX
of
Regulation
3.16
provides for any building which falls within a distance
of
meters
from
outer
boundary of the metro station/terminals to be eligible for a maximum FAR of 4 for all permissible applicable
uses, for
irrespective
of
respective
uses
in
FAR
respective tables of the zoning regulation. Admittedly,
property
of
Petitioner
abutting the metro railway station is definitely within 150 meters, and therefore would be eligible to a FAR of 4. Thus, apart from the construction which has already been put up, the Petitioner would be entitled to put up construction to an extent of 4 times the area of the property. 22.38. If the area of 766.26 sq. mt. represents the plot area before acquisition of 152 sq. mt. by BMRCL, the residual plot area would be 614.26
- 107 HC-KAR
sq. mt. The total permissible floor area at FAR 4 would then be 2,457.04 square meters or approximately
26,447
square
feet.
The
construction which has been put up now, being 21,839 square feet, the Petitioner would, on this calculation, be entitled to put up an additional construction of approximately 4,608 square feet. Alternatively, if the area of 766.26 sq. mt. represents the plot area remaining after acquisition of 152 sq. mt. by BMRCL, the total extent area of the property being 766.26 sq. mt., the Petitioner would be entitled to put up 766.26 into 4, i.e., 3,065.04 square meters or approximately
32,992
square
feet.
The
construction which has been put up now, being a super-built up area of 21,839 square feet, the Petitioner would be entitled to put up an additional construction of approximately 11,153 square feet. 22.39. As per the Schedule to the Lease Deed, the property consists of stilt + 3 floors + terrace. In terms of the zonal regulation, the height of the building would vary on the ground coverage permissible,
taking
into
account
FAR
applicable. The FAR in the present matter being
- 108 HC-KAR
assumed at 4, the total permissible floor area would be approximately 32,992 square feet if the plot area is 766.26 sq. m. after acquisition, or approximately 26,447 square feet if the said extent
represents
plot
area
before
acquisition of 152 sq. m. by BMRCL. The actual permissible construction would be subject to verification
of
plot
area
available
for
development, the applicable Zonal Regulations and the area of the existing construction counted for FAR purposes. 22.40. The FAR being 4, the road access that would have to be provided to the said building would have to be commensurate with the FAR as per the zonal regulation so as to make available the incentive of 4 FAR being achieved by the land user. Though the FAR is required to be provided by a different authority, namely the local planning authority and the BMRCL has nothing to do with it, it is required for BMRCL to make
achievement
of
incentive
of
additional FAR possible. 22.41. Hence,
taking
into
consideration
requirement of the National Building Code, the
- 109 HC-KAR
minimum width of the road which is required to be provided is 12 meters. It may be for achieving the larger FAR, there may be a higher road width which is required to be provided. That would have to be ascertained during the course of trial and cannot be done in this writ petition. What this Court can only direct is the provision of the minimum width of the road as required under the National Building Code. If the Petitioner has any further grievance relating to the width of the road, then the same would have to be agitated before the Civil Court and proper reliefs would have to be sought for. 22.42. On the present record, separate six-metre ingress and egress provide a more reasonable and dependable arrangement than a single combined passage. They address the separate needs of entering and leaving traffic, reduce
likelihood
of
obstruction
improve
access for emergency vehicles. BMRCL has not established
that
arrangement
would
interfere with an identified Metro requirement or that a lesser configuration would provide adequate access. Separate six-metre ingress
- 110 HC-KAR
and egress are therefore justified on the facts of this case. FIRE SAFETY, EMERGENCY ACCESS AND THE ADJOINING METRO STATION 22.43. The building’s size and commercial use make emergency
access
relevant.
The
Petitioner
submits that fire tenders must be able to reach the building and that a fire could affect the adjoining Metro station, its operations and commuters. 22.44. The approximate dimensions of buses, trucks
fire
engines
do
not,
by
themselves,
establish the prescribed minimum width for this site. The applicable requirement depends on the relevant building and fire-safety standards and the site-specific circumstances. Clause 4.6 of Part 3 of the National Building Code of India, 2016,
prescribes
certain
means
of access to
requirements
high-rise
for
special
buildings. 22.45. The Metro station and its commuters must be protected. The station is on the eastern side, where the former frontage was acquired, and
- 111 HC-KAR
requested
replacement
access
on
northern side over land admitted to be held by BMRCL. BMRCL has not identified a specific security or operational risk arising from the proposed
northern
access.
It
may
impose
reasonable safeguards consistent with law, but those safeguards must not narrow, obstruct or withdraw the access granted without lawful justification. WATER,
ELECTRICITY
AND
SEWERAGE
CONNECTIONS 22.46. BMRCL submits that the Policy does not cover utility connections through its land. However, the Policy’s introduction refers to way-leave requests for underground water-supply and sewerage
pipelines
electrical
telecommunication lines. Clause 2(b) identifies the feasibility of providing water, electricity and sewerage from another direction as a relevant consideration. Items 2(a) and 2(b) of the charging table prescribe charges for electric service lines and water and sewage pipelines. The
Policy
therefore
contemplates
such
- 112 HC-KAR
installations, although it prescribes charges for them. 22.47. The Petitioner does not ask BMRCL to supply these services; it seeks the right to install and maintain
its
own
connections
across
relevant land. BMRCL states that locations for water, sanitary and electric lines were marked during the joint inspection on 28.03.2025 and that it is willing to permit the lines at those points. This
is
inconsistent
with
its
initial
position that the lines cannot be provided under the Policy and confirms that installation is feasible in principle, subject to appropriate alignment and safeguards. 22.48. For the reasons given under Point (ii), the relevant charging provisions cannot be applied to make the necessary replacement utility routes chargeable in this case. The Petitioner must bear the cost of installing and maintaining the lines and any charges payable to the relevant service providers. The lines shall be laid at the points marked during the joint inspection and shown in Annexure-R2, or at such
other
points
as
may
be
marked
in
- 113 HC-KAR
accordance with the operative order. BMRCL shall not obstruct the authorised lines except in accordance with law and that order. 22.49. Water and sewerage pipes passing through the acquired
portion
were
closed
during
construction and the replacement utility lines have not yet been installed and commissioned. Merely marking their locations does not secure the Petitioner’s ability to install and maintain them. The Petitioner must have the right to route the necessary lines through the relevant land, subject to applicable technical and safety requirements. BMRCL need not supply the services
or
installing,
bear
costs
of
operating
or
water
sanitation
obtaining,
maintaining
connections. 22.50. Access
to
is
closely
connected with the right to life and human dignity under Article 21. Electricity is also necessary for the ordinary and lawful use of a modern commercial building. Where the need to route utility lines arises from acquisition and construction for the Metro project, BMRCL must not impose conditions that leave the remaining
- 114 HC-KAR
property without a practical means of obtaining essential
services
merely
to
protect
its
administrative or commercial interests.
APPLICATION OF THE POLICY AND BALANCE OF INTERESTS 22.51. BMRCL appears to have treated the Policy’s standard widths and charges as controlling. Yet Clause
requires
consideration
of
circumstances of each case, Clause 7 requires consideration
on
merits
after
site
inspection, and Clause 12 provides for cases not covered by the Policy to be decided with the Managing Director’s approval. A case like this in which the entire road frontage has been acquired
remaining
commercial
property has been left without effective access requires individual assessment. 22.52. BMRCL’s positions have differed: it says the Policy does not cover utility lines but offers to permit them at marked points; it says the northern land is needed for infrastructure but has offered a passage of 8.5 metres; and its
- 115 HC-KAR
access proposals have varied in width and configuration. These changes have not been accompanied by a reasoned explanation of what the property requires or why separate sixmetre lanes cannot be provided. 22.53. The relief must respect the public purpose of the Metro project. The Court does not direct the return of acquired land or alteration of the Metro station, nor does it transfer BMRCL’s ownership or control of its land. The direction is confined to replacement access and necessary utility routes over land held by BMRCL. BMRCL may protect its infrastructure and operations through reasonable measures consistent with this order, but the public purpose of the project does not justify leaving the remaining property without
effective
access
where
no
specific
operational or safety impediment has been demonstrated. 22.54. BMRCL’s offer of 3.5 metres free plus five metres on payment does not resolve the issue. A combined passage of 8.5 metres is not equivalent to separate six-metre ingress and egress, which together provide twelve metres,
- 116 HC-KAR
approximately 40 feet. Nor does an assurance that access will not be cancelled while charges are
paid
remove
or
payment
conditions
time
limit,
renewal
burden
found
inapplicable under Point (ii). NATURE OF THE RIGHT AND IMPLEMENTATION 22.55. Replacement access cannot be made subject to a
ten-year
revised
agreement,
way-leave
periodic
charges
or
renewal,
discretionary
withdrawal. It must continue in perpetuity, subject to law. BMRCL cannot withdraw, curtail or obstruct it merely at its discretion or because a fixed term has expired. Any lawful restriction must be supported by a genuine requirement consistent with law and must not defeat the right granted. Since the access is free and in perpetuity, the question of termination of the way-leave does not arise. 22.56. Permanent and free access does not transfer ownership or possession of BMRCL’s land to the Petitioner and does not create a public road. The route is for the Petitioner and persons lawfully using the Schedule Property to enter and leave, and for authorised utility lines to
- 117 HC-KAR
pass.
No
construction
other
than
that
reasonably required for the access surface and utility lines is permitted. Clauses 5 and 11 of the Policy continue to apply to the extent consistent with this order. BMRCL may take reasonable measures to protect Metro safety, security and operations, provided they do not narrow,
obstruct
or
render
ineffective
access granted. 22.57. The alignment of the two six-metre lanes shall be marked on land held by BMRCL on the northern side. It must avoid third-party land and interference with the Metro station and its operations. Utility lines shall be laid at the points marked on 28.03.2025 and shown in Annexure-R2, or at such other points as are agreed or determined under the operative order. Either party may approach this Court for directions
on
a
genuine
implementation
dispute. Such an application shall not reopen the entitlement to replacement access, its free and permanent character, or the separate sixmetre widths determined under this Point, subject
only
to
determination
by
committee mentioned below. Whether separate
- 118 HC-KAR
six-metre width ingress and egress can be provided shall be determined by a committee to be constituted by the Managing Director of BMRCL, comprising concerned officers having the requisite technical expertise, after notice to the Petitioner and having regard to the building bye-laws,
zonal
requirements
regulations,
fire
nature
of
force
construction. Only if the committee records in writing, with reasons, that separate ingress and egress cannot be provided, BMRCL shall provide a single access of at least 40 feet (about 12.2 metres) for both ingress and egress. 22.58. This Court answers Point No. (iii) by holding that the Petitioner is entitled to a writ of mandamus under prayer (b). BMRCL shall provide, free of cost and on a permanent basis, over land held by BMRCL, a six-metre-wide ingress and a separate six-metre-wide egress to the Schedule Property from the northern side;
if
committee
referred
to
above
records, with reasons, that separate ingress and egress cannot be provided, BMRCL shall instead provide a single access of at least 40 feet (about 12.2 metres) for both ingress and
- 119 HC-KAR
egress. The access shall continue in perpetuity and shall not be withdrawn, curtailed, made subject to renewal or obstructed at BMRCL’s discretion. This direction is subject to law and to reasonable safeguards for Metro safety, security
operations,
provided
those
safeguards do not defeat or materially impair the access granted. 22.59. BMRCL shall permit the Petitioner to install and maintain water, electricity and sewerage lines at the points marked during the joint inspection on 28.03.2025 and shown in Annexure-R2, or at such other points as are marked under the operative order. The Petitioner shall bear the costs of installing and maintaining the lines and any applicable charges payable to the relevant service providers. BMRCL shall not rely on the charging provisions or fixed-term conditions of the Way Leave Policy to deny, charge for or interrupt the replacement access and utility routes granted under this Point. 22.60. The exact alignment and marking shall be settled under the operative directions, on land held by BMRCL and without encroachment on
- 120 HC-KAR
third-party land or interference with the Metro station. Any dispute concerning implementation may be brought before this Court in accordance with the operative order.
23.
Answer to Point No. (iv): Whether the compensation paid in respect of the acquired land and demolished structure precludes the Petitioner from pursuing its distinct claim for damages arising from the alleged loss of access to the remaining Schedule Property?
23.1. Learned Counsel for the Petitioner submits that the compensation paid for the land and building acquired by BMRCL does not automatically extinguish every separate claim arising from the effect of the acquisition on the remaining property. The compensation was paid for the property taken over for the Metro project. Prayer allegedly
(c),
by
caused
contrast,
concerns
by
resulting
losses loss
of
effective access to the property left with the Petitioner. The two claims must be considered separately.
- 121 HC-KAR
23.2. Learned Counsel submits that, when only part of a property is acquired, the effect on the remainder must also be considered. Adequate ingress and egress are necessary for the effective use of a commercial building by its owner, tenants, employees, customers and other lawful users. The Petitioner’s case is that its former access from the eastern side, facing the main road, was entirely lost when the land was
acquired
Metro
station
was
constructed, leaving the remaining building without effective access and causing the tenant to vacate. 23.3. Learned Counsel submits that compensation for the acquired land and demolished structure is distinct from losses caused by the deprivation of access to the remaining property. Payment for what was taken does not, by itself, settle the consequences for what remained. 23.4. Learned Counsel also refers to the dispute concerning
compensation
for
acquired
extent of 152 square metres. Compensation was paid for 95.75 square metres, while the remaining 56.25 square metres were treated as
- 122 HC-KAR
kharab land. The Petitioner challenged that treatment in W.P. No. 4125/2023, in which this Court directed KIADB to take steps to issue a corrigendum including the remaining extent and to pay compensation. Learned Counsel submits
that
this
proceeding
concerns
a
separate issue from the claim arising from loss of access. 23.5. Referring to BMRCL’s letter dated 23.12.2024, Learned Counsel submits that the statement that compensation included the demolished building does not answer the claims concerning loss of access, interruption of utility services or loss of rental income. Nor does the statement that the Petitioner was permitted to strengthen the remaining floors at its own cost resolve whether the building could be accessed and used. 23.6. Learned prayer
Counsel (c)
is
compensation
accordingly
submits
not
a
claim
for
for
acquired
that
duplicate land
or
demolished structure. It is a separate claim for losses suffered because the remaining property could not be accessed and effectively used.
- 123 HC-KAR
Acceptance of acquisition compensation does not, by itself, bar consideration of that claim. 23.7. Learned Counsel for the Respondents submits that the acquisition was carried out under the Karnataka Industrial Areas Development Act, 1966, and that BMRCL paid Rs.4,01,44,404/as compensation for the acquired land and building. The Petitioner accepted that amount and, according to BMRCL, cannot seek further compensation arising from the acquisition. 23.8. Learned Counsel submits that compensation was calculated at 200% of the market value, together with solatium and interest, under the Right to Fair Compensation and Transparency in
Land
Acquisition,
Rehabilitation
Resettlement Act, 2013. BMRCL relies on the amount paid to support its position that no further compensation is payable and that it may levy charges for access beyond the free width permitted under its Way Leave Policy. 23.9. Learned Counsel further relies on BMRCL’s letter dated 23.12.2024, which states that the compensation included the demolished building
that
Petitioner
was
permitted
to
- 124 HC-KAR
strengthen the remaining floors at its own cost, without any right to compensation. QUESTION FOR DETERMINATION AND SCOPE OF THIS POINT 23.10. The question under this Point is limited to whether the compensation paid for the acquired land and demolished structure, by itself, bars the Petitioner from pursuing a distinct claim for losses allegedly caused by the acquisition and the resulting loss of access to the remaining Schedule
Property.
This
Point
does
not
determine whether the Petitioner has proved its entitlement
to
amount
claimed
in
Annexure-F. That issue falls for consideration under Point (v). WHETHER THE COMPENSATION PAID BARS A SEPARATE CLAIM 23.11. BMRCL states that it paid Rs.4,01,44,404/- as compensation
for
acquired
land
building, including the demolished structure, and relies on its assertion that the award included 200% of market value, solatium and interest. The purpose for which compensation
- 125 HC-KAR
was assessed is material. BMRCL has not shown that the amount included a specific assessment of losses arising from the loss of access to the remaining
property,
interruption
of
utility
services or loss of rental income. 23.12. The substantial amount paid does not, by itself, establish
that
every
consequence
of
acquisition was assessed or compensated. The acquired land and demolished structure are distinct from the remaining property and the impairment of its use. If the loss of access is established, it concerns the use and utility of the property left with the Petitioner, rather than the value of the property acquired. 23.13. The Petitioner’s case is that it formerly had independent and complete access from the eastern side facing the main road and lost that access after the acquisition and construction of the Metro station. It alleges that the remaining building was left without effective ingress and egress. Whether the loss of access caused the tenant to vacate, whether other circumstances contributed to the vacancy, and whether any
- 126 HC-KAR
resulting rental loss is legally recoverable are matters reserved for Point (v). 23.14. Compensation for acquired land does not itself provide access to the remaining property. Nor does it establish, that the loss of use or rental income was included in the award. BMRCL has not identified a settlement or release by which the Petitioner relinquished claims concerning access,
interruption
of
utilities
or
loss
of
income. On the material placed before this Court,
acceptance
of
acquisition
compensation does not, by itself, dispose of those distinct claims. 23.15. The effect of acquisition on the remaining property must be considered separately from the value of the property taken. The public purpose of the Metro project and the payment of compensation for the acquired property do not,
by
themselves,
answer
whether
remaining property was left without effective access or whether any resulting loss has been addressed in accordance with law. 23.16. Article 300A of the Constitution is relevant to the extent that it protects against deprivation
- 127 HC-KAR
of property except by authority of law. It does not, by itself, establish an entitlement to every consequential loss claimed by an owner. It reinforces, however, that the effect of public action on private property must be considered in accordance with law and cannot be treated as immaterial merely because compensation has been paid for the property acquired. STATUTORY COMPENSATION AND THE HEADS OF LOSS 23.17. BMRCL has referred to both the Karnataka Industrial Areas Development Act, 1966, and
Right
to
Fair
Compensation
Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. The present Point does not require the Court to determine the complete statutory basis of the acquisition or reopen the acquisition award. It requires the Court to distinguish the compensation actually paid from the losses now claimed. 23.18. Section 28 of the 2013 Act is reproduced hereunder for easy reference:
- 128 HC-KAR
28. Parameters to be considered by Collector in determination of award.–In determining the amount of compensation to be awarded for land acquired under this Act, the Collector shall take into consideration— firstly, the market value as determined under section 26 and the award amount in accordance with the First and Second Schedules;
secondly, the damage sustained by the person interested, by reason of the taking of any standing crops and trees which may be on the land at the time of the Collector's taking possession thereof; thirdly, the damage (if any) sustained by the person interested, at the time of the Collector's taking possession of the land, by reason of severing such land from his other land; fourthly, the damage (if any) sustained by the person interested, at the time of the Collector's taking possession of the land, by reason of the acquisition injuriously affecting his other property, movable or immovable, in any other manner, or his earnings; fifthly, in consequence of the acquisition of the land by the Collector, the person interested is compelled to change his residence or place of business, the reasonable expenses (if any) incidental to such change; sixthly, the damage (if any) bona fide resulting from diminution of the profits of the land between the time of the publication of the declaration under section 19 and the time of the Collector's taking possession of the land; and
- 129 HC-KAR
seventhly, any other ground which may be in the interest of equity, justice and beneficial to the affected families.
23.19. Section 28 identifies matters to be considered when
determining
compensation,
including
damage caused by severance of the acquired land from other land and damage caused where the acquisition injuriously affects other property or earnings. The provision may therefore be relevant to the distinction between the value of the land acquired and consequential loss. 23.20. The amount paid at 200% of market value, together with solatium and interest, does not by itself establish that the Petitioner was compensated for every consequence of the acquisition. The amount may be relevant to the acquisition claim, but its magnitude does not prove that the separate losses now claimed were included or that the Petitioner agreed to relinquish any distinct remedy available under law.
- 130 HC-KAR
RELEVANCE OF THE WAY LEAVE POLICY AND ACCEPTANCE OF COMPENSATION 23.21. The
Way
acquisition
Leave may
Policy
leave
a
recognises property
that
without
adequate access and provides a mechanism for considering access in such circumstances. This supports the conclusion that access to the remaining
property
is
a
distinct
matter
requiring consideration. The Policy’s existence does not, by itself, establish the Petitioner’s entitlement
to
damages
or
amount
recoverable. 23.22. The Petitioner’s acceptance of Rs.4,01,44,404/is not disputed. However, BMRCL has not identified any release or settlement showing that the Petitioner relinquished its separate claims concerning access, utility services or loss of rental income. Acceptance of compensation for the acquired land and building does not, without more, establish that the Petitioner agreed to make no further claim for the effect of the acquisition on the remaining property. 23.23. The Petitioner’s continued access grievance and
separate
proceedings
concerning
- 131 HC-KAR
compensation for part of the acquired extent are consistent with its maintaining distinct claims. The finding under this Point rests principally on the purpose of the compensation paid and the absence of material showing that the consequential losses were included in or settled by that payment. SEPARATE
PROCEEDING
CONCERNING
56.25
SQUARE METRES 23.24. The dispute concerning the remaining 56.25 square metres is separate. The Petitioner states that compensation was paid for 95.75 square metres out of the 152 square metres acquired and that the balance was treated as kharab land.
In
W.P.
No.
4125/2023,
directed KIADB
to
take
this
steps to
Court
issue
a
corrigendum including the remaining extent and to pay compensation. Compliance with those
directions
amount,
if
any,
remaining payable are not determined under this Point. Nothing in this finding alters the directions in that proceeding. 23.25. The extent for which acquisition compensation was paid is a separate issue from whether the
- 132 HC-KAR
compensation
for
acquired
land
building bars the claim arising from loss of access to the remaining property. The answer to the latter question does not depend on the final outcome of the former. EFFECT
OF
THE
STATEMENT
CONCERNING
STRENGTHENING OF THE BUILDING 23.26. BMRCL’s letter dated 23.12.2024 states that the Petitioner was permitted to strengthen the remaining floors at its own cost and without any right to compensation. That statement concerns work on the remaining structure. It does not establish that effective access was provided or that loss of use and rental income was included in the acquisition compensation. No finding is made under this Point concerning the cost or adequacy of the strengthening work. 23.27. This Court answers Point No. (iv) by holding that the compensation paid for the acquired land and demolished structure does not, by itself, preclude the Petitioner from pursuing a distinct
claim
for
losses
caused
by
- 133 HC-KAR
acquisition and the resulting loss of effective access to the remaining Schedule Property.
24.
Answer to Point No. (v): Whether the Petitioner is entitled to the monetary relief sought under prayer (c), namely, recovery of the amount of ₹11,30,36,834.57 claimed under Annexure-F dated 07.10.2024 and continuing damages until the access sought under prayer (b) is provided; and whether such relief can appropriately be adjudicated in the present writ proceedings, having regard to the Respondents’ objections concerning disputed facts, causation and the alleged loss of rental income? 24.1. Learned Counsel for the Petitioner submits that the Schedule Property bearing Municipal No. 28/B,
PID
Industrial
No.
57-137-28B,
at
Sarakki
Layout,
Bannerghatta
Road,
3rd
Phase, J.P. Nagar, Bengaluru, measures 766.26 square metres and comprises a commercial building with a super built-up area of 21,839 square feet, extending from the ground floor to the fourth floor. 24.2. Learned Counsel submits that, before the Metro project, the property had access from the eastern side facing the main road. By letter dated 07.03.2017, BMRCL indicated that 152
- 134 HC-KAR
square metres on the eastern side would be acquired
through
Karnataka
Industrial
Areas Development Board (KIADB) for the Metro station. The Petitioner’s case is that the acquisition and subsequent construction took over the former frontage and deprived the remaining property of effective access. 24.3. Learned
Counsel
further
submits
that
electricity, water and sanitation connections serving
Schedule
Property
were
disconnected in 2019 in connection with the Metro construction. The property had been leased to M/s GraphX Solution India Pvt. Ltd. under
a
01.07.2015,
registered recording
lease
deed
monthly
dated
rent
of
₹12,01,145 and contractual escalation of 15% every three years. The Petitioner asserts that the tenant vacated in August 2019 because effective access and essential services were unavailable,
that
property
has
consequently remained incapable of effective commercial use. 24.4. Learned Counsel submits that compensation paid for the acquired land and demolished 03/11/2026, 16:40, Bengaluru
- 135 HC-KAR
structure does not necessarily compensate for the separate effect on the remaining property. Of
square
metres
identified
for
acquisition, compensation is said to have been paid
for
95.75
square
metres,
while
remaining 56.25 square metres were treated as kharab
land.
The
issue
concerning
remaining extent is the subject of W.P. No. 4125/2023. The Petitioner submits that the acquisition compensation issue is distinct from the loss allegedly caused to the remaining property by deprivation of access and essential services. 24.5. Learned Counsel submits that, by request dated 15.04.2024, the Petitioner sought replacement access from the northern side over land held by BMRCL, comprising a separate six-metre-wide entry and a separate six-metre-wide exit. By letters
dated
28.06.2024
19.11.2024,
BMRCL offered a combined six-metre passage subject to upfront way-leave charges and a ten-year agreement. The Petitioner disputes those
conditions
replacement
access
because
arose
from
project. 03/11/2026, 16:40, Bengaluru
need
for
Metro
- 136 HC-KAR
24.6. Learned Counsel relies on the registered lease deed as a relevant basis for assessing rental loss. By legal notice dated 07.10.2024, the Petitioner
claimed
Annexure-F
compensation
until
₹11,30,36,834.57 also
sought
effective
under
continuing access
essential services were provided or restored. 24.7. Learned Counsel for the Respondents submits that access and utility lines over land acquired for the Metro project are governed by BMRCL’s Way Leave Policy. BMRCL relies on the Policy provisions
concerning
permitted
widths,
charges and licence conditions, and on its offers of a combined six-metre passage subject to the terms set out in its letters dated 28.06.2024 and 19.11.2024. 24.8. Learned Counsel submits that, by letter dated 23.12.2024, BMRCL stated that pipes passing through the acquired portion had been closed during construction because the property was vacant, and that separate utility connections could
be
obtained.
BMRCL
disputes
responsibility for the alleged loss of rental income and contests the dates, circumstances 03/11/2026, 16:40, Bengaluru
- 137 HC-KAR
and causal connection relied upon by the Petitioner. 24.9. Learned Counsel for the Respondents further submits
that
claim
raises
disputed
questions concerning the acquisition award, the date
responsibility
for
utility
disconnections, the date and reason for the tenant’s departure, the rent payable from time to time, the period of any loss, mitigation and the computation of damages. BMRCL contends that those issues require evidence and should be determined in a civil suit. 24.10. The issues for determination are: 24.10.1. whether payment of compensation for the acquired portion, by itself, bars a separate claim for consequential loss allegedly
suffered
by
remaining
property; 24.10.2. which aspects of the dispute can be determined in these writ proceedings; 24.10.3. whether the precise amount and period of any recoverable rental loss should be 03/11/2026, 16:40, Bengaluru
- 138 HC-KAR
left
to
a
competent
civil
court
for
determination on evidence. 24.11. The Court has considered the claim in the context of its findings under Point Nos. (ii), (iii) and (iv). The issues must be kept distinct. The legality of BMRCL’s approach to replacement access and utility services is one matter. Whether
acquisition
award
included
compensation for the particular consequential loss now alleged is another. Whether, for what period and in what amount the Petitioner in fact suffered recoverable rental loss attributable to the acts or omissions complained of is a further, evidentiary question. 24.12. The findings under Point Nos. (ii) and (iii) determine
legal
position
governing
replacement access and utility connections in the circumstances of this case. The identified provisions of the Way Leave Policy cannot be relied upon to impose the impugned charges or time-limited conditions on an owner whose former
access
acquisition
or
was
lost
through
construction,
BMRCL’s BMRCL
is
required to provide the replacement access and 03/11/2026, 16:40, Bengaluru
- 139 HC-KAR
utility arrangements directed in this judgment. Those findings and directions remain operative irrespective of the forum in which the precise monetary loss is assessed. 24.13. The Court rejects BMRCL’s broad proposition that payment of compensation for the acquired land
demolished
structure,
by
itself,
necessarily bars a separate claim arising from the effect of the acquisition and Metro works on the remaining property. The acquired land and the remaining property are distinct subjects of potential injury. The fact that compensation was paid for the former does not, without examination of the award and its component heads, establish that loss of access, severance, injurious affection, loss of earnings or rental loss concerning the remaining property was also assessed and compensated. 24.14. Section 28 of the Right to Fair Compensation
Transparency
in
Land
Acquisition,
Rehabilitation and Resettlement Act, 2013, and 23 of the Land Acquisition Act, 1894, illustrate the legal distinction between the value of the land acquired and certain consequential injuries 03/11/2026, 16:40, Bengaluru
- 140 HC-KAR
to other property or earnings. The Court does not decide in these writ proceedings which statutory regime governs the acquisition or whether a particular head was payable under that regime. The relevant factual question is what the acquisition award actually assessed and paid. That question must be answered by examining
complete
materials,
payment
award,
records
valuation
related
proceedings. 24.15. The registered lease deed is relevant evidence of the parties’ contractual arrangement and may
provide
an
important
measure
when
assessing loss. It does not, by itself, prove that rent at the stated rate was payable or received throughout every month claimed; that the tenant vacated for the reason alleged; that the premises could not otherwise have been let; or that all loss during the period was caused by BMRCL. Those matters must be considered with the tenancy records, termination and handover documents,
rent-payment
evidence,
utility
records, evidence concerning access, and any attempts to re-let the property. 03/11/2026, 16:40, Bengaluru
- 141 HC-KAR
24.16. The precise date on which each utility service was disconnected must be established from the relevant records. The date on which the tenant vacated, the reason for its departure and the period for which rent would otherwise have been payable must likewise be proved. The rent applicable from time to time must be calculated by reference to the complete lease deed, including its escalation provisions and any relevant period,
variation, credit
or
termination, other
rent-free
adjustment.
These
matters bear directly on causation, the period of
loss
amount,
if
any,
legally
recoverable. 24.17. The
same
compensation
applies
to
issue.
Whether
acquisitionthe
award
included compensation for severance, injurious affection, loss of earnings, rental loss or any overlapping head cannot safely be determined by a general assertion from either side. The award and supporting valuation record must be examined. If any payment is shown to cover the identical loss for the identical period, it must be accounted for to prevent double recovery. If no such overlap is established, the 03/11/2026, 16:40, Bengaluru
- 142 HC-KAR
mere
payment
of acquisition
compensation
cannot defeat a distinct claim. 24.18. The Court is satisfied that the Petitioner has raised a substantial grievance concerning the consequences of a public infrastructure project and BMRCL’s handling of the resulting access and utility problem. The record warrants the findings elsewhere in this judgment concerning BMRCL’s application of the Way Leave Policy, the need for effective replacement access and
obligation
to
address
continuing
impairment of the remaining property. BMRCL’s conduct, as analysed under Point No. (vi), merits the Court’s express disapproval for the reasons recorded there. 24.19. However, the existence of a public-law wrong or the establishment of the Petitioner’s right to effective access does not permit the Court to presume
every
monetary
claim.
element Article
of
pleaded
permits
consequential relief where appropriate, but it does not require the Court to conduct a full civil trial within writ proceedings. Where damages depend
on
contested
03/11/2026, 16:40, Bengaluru
evidence
about
- 143 HC-KAR
contents of an acquisition award, dates of disconnection, the tenant’s departure, the rent payable over time, mitigation, causation and the extent of any overlap, a trial is the appropriate means of resolving those issues. 24.20. The Court therefore distinguishes the matters that
can
properly
be
decided
in
these
proceedings from those that cannot. This Court can determine the legality of the impugned Policy provisions as applied to the Petitioner, the Petitioner’s entitlement to the replacement access and utility-related relief directed under Point No. (iii), and the legal proposition that payment for the acquired portion does not automatically extinguish a distinct claim for consequential loss to the remaining property. It can also record its disapproval of BMRCL’s handling of the grievance, award costs where justified, and issue directions governing future cases. 24.21. This Court cannot, on the present record and without a trial, finally determine the precise commencement date of rental loss, the date on which the tenant vacated, whether the tenant 03/11/2026, 16:40, Bengaluru
- 144 HC-KAR
left for the reasons alleged, the rent legally payable in each month, the extent to which the property could have been re-let, the effect of intervening circumstances, the contents and effect of the acquisition award, or the precise amount of recoverable loss. Those questions require production and testing of evidence, including cross-examination where necessary. 24.22. The Court does not accept BMRCL’s submission insofar as it seeks to use the existence of disputed facts to defeat the Petitioner’s publiclaw challenge or the relief concerning access and utility services. Nor does the Court accept that
payment
of
acquisition
compensation
automatically bars the Petitioner from pursuing a separate claim. The proper consequence of
factual
disputes
is
that
precise
monetary claim must be left to a competent civil court, rather than being quantified finally in these writ proceedings. 24.23. The Petitioner shall accordingly have liberty to institute an appropriate civil suit before the competent court for recovery of rental loss and other consequential damages, if so advised and 03/11/2026, 16:40, Bengaluru
- 145 HC-KAR
in accordance with law. The civil court shall determine, on the evidence adduced by the parties,
whether
to
what
extent
Petitioner suffered loss attributable to BMRCL’s acts or omissions; the relevant period of loss;
effect
of
acquisition
award
compensation already paid; the rental terms and escalation applicable from time to time; mitigation and other relevant circumstances; interest thereon, and the final amount, if any, payable. The Petitioner though shall be entitled to the benefit of Section 14 of the Limitation Act, 1963 for the time spent in prosecuting this writ petition. The loss complained of is a continuing cause of action, which shall be treated as continuing until the access is made available
water,
electricity
sewerage facilities are restored. 24.24. For that purpose, the Petitioner may rely on the registered
lease
deed
dated
01.07.2015,
Annexure-F dated 07.10.2024 or any other document that would reflect the rentals that the Petitioner would have secured, which it has now lost out on, the acquisition award and payment
records,
utility
03/11/2026, 16:40, Bengaluru
construction
- 146 HC-KAR
records, tenancy and handover documents, correspondence, and such other admissible evidence as may be available. BMRCL shall be at liberty to raise all legally available defences concerning
causation,
proof,
quantum,
mitigation and overlap, except that the general proposition
that
acquisition
compensation
automatically bars a distinct consequential-loss claim stands rejected for the reasons stated above. All questions requiring evidence shall be decided by the trial court independently in accordance with law. 24.25. The trial court shall not treat the observations in this judgment concerning the legal distinction between
acquisition
consequential
loss
Petitioner
already
has
as
compensation
a
finding
proved
that
precise
amount claimed; the observation is only limited to the fact that the Petitioner would be entitled to losses caused by the deprivation of access, in addition to the acquisition compensation, the existence and extent of such losses not having been
determined
or
proved
in
these
proceedings. Equally, the Petitioner shall not be required to establish the legal validity of the 03/11/2026, 16:40, Bengaluru
- 147 HC-KAR
Policy provisions afresh as determined in this judgment,
or
replacement
entitlement
access
to
utility-related
directions granted herein. The trial court shall determine the factual issues and monetary consequences
on
evidence
before
it,
consistently with the binding findings of this Court. 24.26. The Court expresses no final view on whether the entire sum of ₹11,30,36,834.57 claimed under Annexure-F is recoverable, nor on the exact
amount
of
continuing
or
other
consequential damages. No monetary decree for
that
sum
is
passed
in
proceedings.
This
observation
ensure
claim
that
is
these is
writ
made
to
adjudicated
on
complete evidence and that BMRCL has a fair opportunity to contest the factual basis and calculation. 24.27. Accordingly, Point No. (v) is answered partly in favour of the Petitioner. BMRCL’s contention that payment of compensation for the acquired portion, without examination of the award and
relevant
heads
03/11/2026, 16:40, Bengaluru
of
compensation,
- 148 HC-KAR
automatically
defeats
claim
for
consequential loss is rejected. The precise claim for
rental-based
compensation
other
damages is reserved for determination by a competent civil court on evidence. The findings and directions under Point Nos. (ii), (iii) and (iv) remain unaffected.
25.
Answer to Point No. (vi): What order?
BMRCL’S STAND AND THE APPLICATION OF ITS OWN POLICY 25.1. The Petitioner contends that BMRCL treated its Way Leave Policy as rigid, asserted that it was bound by the Policy, and failed to consider the particular
circumstances
property.
The
Court
of
records
Petitioner’s
following
further observations. 25.2. The
Policy
itself
provided
mechanisms
for
considering cases on their individual merits. Clause
required
circumstances
of
consideration each
case;
of
Clause
contemplated a decision on the merits after site inspection;
and Clause 12
03/11/2026, 16:40, Bengaluru
provided for a
- 149 HC-KAR
decision, with the approval of the Managing Director, where the Policy did not cover the case. 25.3. The present case concerned a property whose eastern frontage had been acquired for the Metro
project,
leaving
remaining
commercial building without any access. The need for a permanent replacement route and associated
utility
connections
called
for
a
reasoned, site-specific assessment. Although a joint inspection was later conducted and points were marked for utility lines, the separate sixmetre-wide ingress and egress sought by the Petitioner was not provided and no reasons are placed on record, except to contend that it cannot be provided. BMRCL cannot justify its stand merely by referring to standard widths and charges prescribed by the Policy when the Policy
itself
contemplated
consideration
of
individual circumstances. 25.4. BMRCL’s positions were also inconsistent. It relied on the Policy to contend that access was governed licence
by
its
conditions,
discretion while
03/11/2026, 16:40, Bengaluru
its
prescribed own
Policy
- 150 HC-KAR
recognised the special position of properties left without access. It initially maintained that the Policy did not cover the provision of utility lines, yet subsequently identified points at which those lines could be laid. It asserted that the relevant
land
was
required
for
Metro
infrastructure, but also offered access over that land, though on conditions disputed by the Petitioner. 25.5. Its proposals shifted from a combined sixmetre-wide
passage
to
an
arrangement
involving 3.5 metres free of charge and a further
five
metres
on
payment.
Neither
proposal
addressed
Petitioner’s
distinct
request for separate six-metre-wide entry and exit passages. Further, BMRCL relied on an assurance that access would not be cancelled if charges were paid, while maintaining that its Policy’s power of discontinuance must remain available. These positions reveal the absence of a consistent and reasoned approach to the particular problem before it. BMRCL also did not adequately address the applicable building byelaws and fire-safety requirements relied upon by the Petitioner. 03/11/2026, 16:40, Bengaluru
- 151 HC-KAR
25.6. BMRCL’s stand placed the practical and financial burden of resolving the access problem on the Petitioner, although the need for replacement access arose from the Metro project. The Petitioner’s refusal to accept terms requiring advance
payment
a
time-limited
agreement cannot, in the circumstances found under Point Nos. (ii) and (iii), be treated as a sufficient answer to the failure to provide effective replacement access. RELIANCE ON ACQUISITION COMPENSATION TO ANSWER THE DISTINCT LOSS OF ACCESS 25.7. A further feature of BMRCL’s stand is its reliance on compensation paid for the acquired land and demolished structure as though that payment necessarily answered the grievance concerning access to the remaining property. As explained under Point No. (iv), these are distinct matters. Compensation for the land and building acquired does not, by itself, establish that the effect on the remaining property, including deprivation of effective access and loss of use, was assessed and compensated. 03/11/2026, 16:40, Bengaluru
- 152 HC-KAR
25.8. BMRCL did not identify a specific assessment showing that the compensation already paid included the separate loss now in issue. Nor did it show that the Petitioner had settled or relinquished the distinct claim arising from the effect of the acquisition on the remaining property. The
Court does not reopen the
adequacy of compensation for the property acquired. The criticism is that BMRCL relied on that payment as a complete answer to a different grievance without addressing whether
two
matters
were
in
fact
assessed
separately. INCONSISTENT
POSITION
CONCERNING
THE
TENANT AND THE VACANCY OF THE PROPERTY 25.9. BMRCL’s letter dated 23.12.2024 presents an inconsistency
requiring
comment.
BMRCL
disputed the Petitioner’s assertion concerning the tenant’s departure, while also stating that the property was vacant and that the pipes had been closed because there was no need to restore services to a vacant property. Those positions
are
difficult
to
reconcile.
The
inconsistency is relevant to the adequacy of 03/11/2026, 16:40, Bengaluru
- 153 HC-KAR
BMRCL’s response to the grievance, although it does not, without trial, conclusively establish the date or reason for the tenant’s departure or the precise amount of rental loss. 25.10. The registered lease deed dated 01.07.2015 predates the present dispute and records the agreed
rent
escalation.
BMRCL’s
correspondence did not provide a consistent or reasoned answer to the Petitioner’s case that the interruption of access and essential services had impaired the use of the property. This inconsistency assessment
is of
relevant BMRCL’s
to
handling
Court’s of
grievance. The precise tenancy facts and their monetary
consequences
remain
open
for
determination on evidence in the civil suit. RELIANCE ON A CIVIL SUIT FOR AN EASEMENT OF NECESSITY 25.11. BMRCL also submitted that, if the Petitioner required more access than the Policy allowed, it should institute a civil suit for an easement of necessity
that
this
Court
intervene
in
writ
proceedings.
should
not
However,
BMRCL’s own Policy recognises the need to 03/11/2026, 16:40, Bengaluru
- 154 HC-KAR
consider access where acquisition leaves a property
without
effective
access.
BMRCL
cannot rely on the Policy framework while declining to address the consequences of its acquisition
construction
in
a
manner
consistent with that framework. 25.12. The availability of a civil remedy is relevant to the limits of relief that may be granted in writ proceedings. It does not remove this Court’s jurisdiction to examine whether BMRCL applied its Policy lawfully and fairly. The Court has considered
maintainability
objection
separately and rejected it insofar as it concerns the public-law challenge and the prayers for replacement access and utility-related relief. The monetary claim, by contrast, involves disputed facts requiring trial and is therefore left open to the competent civil court. THE CUMULATIVE EFFECT OF BMRCL’S CONDUCT 25.13. The above features must be viewed together with the findings under Point Nos. (ii), (iii) and (iv). The former frontage and access were lost in connection with the Metro project. The grievance
concerning
03/11/2026, 16:40, Bengaluru
access
utility
- 155 HC-KAR
arrangements remained unresolved despite the Petitioner’s representations and the later joint inspection.
When
Petitioner
sought
replacement access, BMRCL’s proposals were conditional and did not address the distinct request for separate entry and exit passages. BMRCL did not produce a reasoned, site-specific assessment
explaining
why
requested
arrangement could not be accommodated, and continued to rely on Policy conditions found unenforceable as applied to the Petitioner. 25.14. The Court recognises the public importance of the Metro project and BMRCL’s responsibility to protect its land,
infrastructure,
safety and
operations. The relief granted does not require alteration
of
Metro
station,
return
of
acquired land or surrender of BMRCL’s control over
its
property.
It
requires
workable
replacement access and routes for utility lines, subject to reasonable safeguards consistent with this order. No specific operational or safety requirement
has
been
established
on
material before the Court that justifies leaving the remaining property without effective access 03/11/2026, 16:40, Bengaluru
- 156 HC-KAR
or making replacement access dependent on the impugned charges. 25.15. A public authority is expected to deal fairly, consistently
proactively
with
persons
affected by its projects. Its Policy should assist it in identifying and resolving the consequences of acquisition, not become a reason to avoid doing so. BMRCL’s failure to make effective use of the case-specific mechanisms in its Policy, its inconsistent positions, and its insistence that
Petitioner
securing
should
bear
replacement
burden
access
of
materially
contributed to the continuation of the dispute. DISAPPROVAL
OF
BMRCL’S
CONDUCT
AND
AWARD OF COSTS 25.16. The Court’s disapproval is not based merely on the fact that BMRCL has failed in its defence. A public authority is entitled to contest a claim
protect
operational
its
property
interests.
This
legitimate
case,
however,
involves more than an ordinary disagreement over
interpretation
of
a
policy.
The
cumulative record shows that BMRCL failed to address
a
foreseeable
03/11/2026, 16:40, Bengaluru
consequence
of
its
- 157 HC-KAR
acquisition, did not provide an effective solution for a prolonged period, relied on compensation for the acquired land as a complete answer to a distinct
grievance,
adopted
inconsistent
positions concerning the tenancy and vacancy of the premises, and sought to place the burden
of
resolving
resulting
access
problem on the Petitioner. 25.17. The Petitioner was compelled to approach this Court to secure relief concerning access and essential services necessary for the effective use of the remaining commercial property. The prolonged
failure
to
provide
a
reasoned
resolution, despite the mechanisms available under BMRCL’s own Policy, materially added to the burden of the proceedings. The Court considers that a declaration and directions for access should be accompanied by an award of costs reflecting its disapproval of the manner in which BMRCL dealt with the grievance. 25.18. In these circumstances, an award of costs is justified.
The
amount
must
reflect
prolonged and avoidable nature of the dispute, the need for the Petitioner to institute and 03/11/2026, 16:40, Bengaluru
- 158 HC-KAR
prosecute these proceedings to secure effective relief, and the failure of a public authority with
requisite
technical
administrative
capacity to resolve the problem through a fair and lawful application of its own Policy. The award
is
intended
to
mark
Court’s
disapproval of that conduct and to meet, in part, the burden of litigation imposed on the Petitioner. It is distinct from any rental loss or consequential damages that may be established in the civil suit. 25.19. Having regard to the cumulative circumstances, this Court directs Respondent No. 1, BMRCL, to pay costs of ₹10,00,000 (Rupees Ten Lakhs only) to the Petitioner. The costs shall be paid within eight weeks from the date of this order. CLARIFICATION 25.20. The
above
observations
are
confined
to
BMRCL’s handling of the Petitioner’s request and the positions taken in these proceedings. They do not question the public purpose of the Metro project or BMRCL’s authority to protect its property and operations by lawful means. The criticism concerns the failure to address 03/11/2026, 16:40, Bengaluru
- 159 HC-KAR
fairly and consistently the consequences of the project for the remaining Schedule Property, and the resulting need for judicial intervention. BEFORE PARTING: DIRECTIONS FOR FUTURE CASES 25.21. Before
parting,
this
Court
considers
it
necessary to set out directions for BMRCL to follow in future cases involving acquisition of private land for Metro projects, particularly where the acquisition or construction may affect access to or the ordinary use of the remaining
property.
demonstrates
that
The
present
case
consequences
of
acquisition cannot be assessed by considering only the extent of land taken over. The effect on the remaining property must also receive due attention. 25.22. Whenever BMRCL proposes to acquire land or undertake construction that may affect access to, or the ordinary use of, the remaining property,
it
shall
identify
likely
consequences for that property at the planning and implementation stages. The assessment shall, as relevant to the site, consider existing 03/11/2026, 16:40, Bengaluru
- 160 HC-KAR
ingress and egress, access for vehicles and emergency services, the availability of water, electricity
sanitation,
any
other
essential facility that may be affected by the proposed works. 25.23. Where the proposed acquisition or construction is likely to leave the remaining property without access or effective access or essential services, BMRCL shall, as far as practicable, inspect the site, consult the affected owner and consider a workable access
arrangement or
services
before are
existing
disrupted.
The
assessment and proposed solution shall be recorded in writing. The purpose is to identify
address
consequences
for
remaining property in a timely manner, rather than leave the owner to seek a remedy after deprivation has occurred. 25.24. While considering a request for replacement access, BMRCL shall distinguish between a request
for
additional
or
more
convenient
access and a request made necessary because the original access or frontage has been lost owing
to
its
acquisition
03/11/2026, 16:40, Bengaluru
or
construction
- 161 HC-KAR
activities. Such a request shall not be rejected merely
by
referring
to
standard
widths,
charging slabs or licence conditions under the Way Leave Policy. BMRCL shall consider actual site conditions, the use and configuration of the remaining
property,
availability
of
alternative
access,
relevant
safety
operational requirements, applicable building bye-laws, the National Building Code, Fire and Emergency Services requirements and other applicable
regulatory
requirements.
The
decision shall state reasons for accepting or rejecting the requested arrangement. 25.25. BMRCL shall give due effect to the provisions of its Way Leave Policy that require consideration of individual circumstances, site inspection and a
decision
on
merits,
including
procedure for cases not specifically covered by the Policy. The Policy shall be applied as a framework for fair decision-making and not as a reason to avoid examining the consequences of BMRCL’s own acquisition or construction. The provisions declared invalid or unenforceable in this judgment shall not be applied to owners whose original access or frontage has been lost 03/11/2026, 16:40, Bengaluru
- 162 HC-KAR
because of BMRCL’s acquisition for the Metro project. 25.26. Where utility routes are likely to be affected, BMRCL shall coordinate, as necessary, with the relevant service providers and the affected owner to identify a workable arrangement for continuity or restoration of essential services at
earliest,
without
any
delay.
Where
replacement utility routes are required over land held by BMRCL, the proposed alignment, responsibilities
for
installation
maintenance, and applicable service-provider charges
shall
be
clearly
communicated.
Administrative or contractual conditions shall not be imposed in a manner that defeats the practical provision of essential services. 25.27. If BMRCL considers that effective replacement access
cannot
reasonably
or
lawfully
be
provided, it shall communicate its reasons to the affected owner and consider, in accordance with applicable law, whether acquisition of the remaining property or another lawful solution is appropriate. An owner whose property has been left without access or effective access 03/11/2026, 16:40, Bengaluru
- 163 HC-KAR
shall not be kept indefinitely in uncertainty while the authority neither provides a workable solution nor takes a reasoned decision on the available alternatives. 25.28. BMRCL shall ensure that decisions concerning replacement access and essential services are communicated
within
a
reasonable
time,
supported by recorded reasons, and identify the steps required for implementation. Any genuine technical or operational restriction relied upon shall be identified with sufficient clarity to permit the affected owner to understand the basis of the decision and, where appropriate, challenge it in accordance with law. 25.29. The Managing Director of BMRCL shall issue appropriate
internal
instructions
to
concerned officers to ensure compliance with these
directions
findings
in
this
judgment. The instructions shall make clear that the consequences of acquisition for the remaining property must be considered at the planning and implementation stages; requests for replacement access must receive individual consideration;
03/11/2026, 16:40, Bengaluru
provisions
declared
- 164 HC-KAR
invalid or unenforceable in this judgment must not be applied to the class of owners covered by the declaration. The instructions shall be issued within four weeks from the date of this order. 25.30. These directions do not prevent BMRCL from acquiring land for a lawful public purpose, protecting its property or imposing reasonable measures necessary for Metro safety, security and operations. They require that such powers be
exercised
fairly,
consistently
in
accordance with law, with due regard to the consequences for the remaining property of persons affected by acquisition. The public purpose of the Metro project and the rights of affected owners must be addressed together; the former does not justify ignoring the latter. 25.31. In view of the reasons and the answers given above, this Court passes the following: ORDER (i)
The writ petition is allowed in part, in terms of the declarations and directions set out below. 03/11/2026, 16:40, Bengaluru
- 165 HC-KAR
(ii)
It is declared that the following provisions of the Way Leave Policy of BMRCL bearing No. BMRCL/LAQ/WLP/5132/2022-23
dated
07.07.2022 (Annexure-C) are unconstitutional, invalid
unenforceable
as
against
Petitioner and any owner of land whose direct access
or
frontage
was
lost
because
of
acquisition by BMRCL for the Metro project: a.
provision
in
Clause
permitting
BMRCL to discontinue a way-leave facility at any time without notice, together with provisions excluding compensation, refund or
alternative
access
upon
such
discontinuance; and b.
the charging provisions in Clause 4 for passages wider than 3.5 metres, namely rows 1(b), 1(c) and 1(d), and rows 2(a) and 2(b) relating to electricity lines and water or sewage pipelines serving the remaining property, read with Note (iii), Clause 9 and the requirements for ten years’ upfront payment and revision or renewal
of
charges
by
prevailing guidance value. 03/11/2026, 16:40, Bengaluru
reference
to
- 166 HC-KAR
c.
This
declaration
is
confined
to
provisions identified above and the class of owners described. The remainder of the Way
Leave
Policy
is
not
invalidated.
BMRCL may impose lawful and reasonable safeguards
for
property,
Metro
protection
safety,
of
security
its
operations, subject to this order. (iii)
A writ of mandamus is issued to Respondent Nos. 1 to 3, directing them as follows: a.
within four weeks from the date of this order, BMRCL shall depute officers to mark on the ground, after reasonable notice to the Petitioner and jointly with the Petitioner’s representative, an ingress six metres wide and a separate egress six metres wide on the northern side of the Schedule Property over the adjoining land held by BMRCL. Whether separate ingress and egress can be provided shall be determined, within the same period, by a committee
to
be
constituted
by
Managing Director of BMRCL comprising concerned officers having the requisite 03/11/2026, 16:40, Bengaluru
- 167 HC-KAR
technical expertise, after notice to the Petitioner
having
regard
to
building bye-laws, zonal regulations, fire force requirements and the nature of the construction;
only
if
committee
records in writing, with reasons, that separate ingress and egress cannot be provided, BMRCL shall mark and provide instead a single access of at least 40 feet (about 12.2 metres) for common ingress and egress. If the Petitioner does not attend after notice, BMRCL may mark the access in the Petitioner’s absence, record the action taken and provide a copy to the Petitioner; b.
Within eight weeks from the date of this order, BMRCL shall provide and hand over to the Petitioner, on a permanent basis, free of cost and without an agreement for a fixed term, the ingress and egress so marked.
The
access
shall
not
be
withdrawn, curtailed, obstructed or made subject to renewal or payment of wayleave charges at BMRCL’s discretion; 03/11/2026, 16:40, Bengaluru
- 168 HC-KAR
c.
BMRCL
shall
permit
Petitioner
to
install and maintain water, electricity and sewerage lines to the Schedule Property over the land held by BMRCL on the northern side, at the points marked at the joint inspection of 28.03.2025 (AnnexureR2), or, where those points cannot be used because of the marking of the strips, at other points marked by BMRCL for that purpose, without way-leave charges. The Petitioner shall bear the cost of laying and maintaining the lines and charges payable to service providers; and d.
The
access
persons
is
for
lawfully
using
Petitioner and
Schedule
Property. It does not create a public road or general right of access for third parties. BMRCL may adopt reasonable measures to protect Metro safety, security and operations, provided such measures do not narrow, obstruct or render ineffective the access directed above. (iv)
It is declared that payment of compensation for the land acquired and structure demolished 03/11/2026, 16:40, Bengaluru
- 169 HC-KAR
does not, by itself, bar a distinct claim for consequential loss suffered by the remaining property.
Whether
included
compensation
acquisition for
loss
of
award access,
severance, injurious affection, loss of earnings, rental loss or any overlapping head shall be determined by the competent civil court upon examination of the complete award, valuation materials and payment records. Any proven overlap shall be accounted for to prevent double recovery. (v)
No monetary decree is passed in these writ proceedings
in
respect
₹11,30,36,834.57
made
of
under
claim
for
Annexure-F
dated 07.10.2024, or for continuing rental loss or other consequential damages. The Petitioner is at liberty to institute an appropriate civil suit before the competent court, if so advised and in accordance with law. Though the Petitioner shall be entitled to the benefit of Section 14 of the Limitation Act, 1963 for the time spent in these proceedings, the cause of action shall be treated as continuing until the access is made available
water,
sewerage facilities are restored. 03/11/2026, 16:40, Bengaluru
electricity
- 170 HC-KAR
(vi)
In any suit instituted by the Petitioner, the competent civil court shall determine on the evidence: a.
the date or dates of disconnection of electricity, water and sanitation services
whether
disconnections
were
attributable to the Metro works or BMRCL; b.
the date and reason for the tenant’s vacation;
c.
the rent legally payable from time to time under the registered lease deed dated 01.07.2015,
including
contractual
escalation and any relevant adjustment; d.
whether and to what extent the Petitioner suffered rental loss or other recoverable damage
caused
by
BMRCL’s
acts
or
omissions; e.
the period of any recoverable loss and the effect
of
any
intervening
mitigation; 03/11/2026, 16:40, Bengaluru
cause
or
- 171 HC-KAR
f.
heads
of
compensation
actually
included in the acquisition award and any overlap with the claim; g.
interest;
h.
All such factual and monetary issues are left open for determination at trial.
(vii) The Petitioner may rely in the civil suit on the registered
lease
deed
dated
01.07.2015,
Annexure-F dated 07.10.2024, the acquisition award
payment
records,
utility
construction records, tenancy and handover documents, correspondence, and any other admissible evidence. BMRCL shall be at liberty to raise all legally available defences concerning causation,
proof,
quantum,
mitigation
overlap, subject to the findings of law recorded in
this
judgment.
The
trial
court
shall
independently assess the evidence and shall not treat this judgment as having established the precise amount of rental loss. (viii) If BMRCL elects not to provide the replacement access directed under clause (iii), or maintains that such access cannot lawfully or feasibly be 03/11/2026, 16:40, Bengaluru
- 172 HC-KAR
provided, it shall take appropriate steps under applicable law to acquire the balance property. Any acquisition, valuation and payment of compensation
shall
follow
applicable
statutory procedure. The current value of the balance
property
any
acquisition
compensation are not determined in these writ proceedings.
Merely
deciding
to
initiate
acquisition proceedings or taking preliminary steps shall not satisfy the direction to provide effective access or, by itself, determine any monetary
claim
reserved
for
civil
trial.
Acquisition of the balance property shall not negate
claim
of
Petitioner
for
compensation for rental loss already incurred or continuing, and other consequential damages. (ix)
BMRCL
shall
pay
Petitioner
costs
of
₹10,00,000 (Rupees Ten Lakhs only) within eight weeks from the date of this order. These costs are distinct from, and shall not be treated as a determination of, the rental loss or consequential damages reserved for civil trial. 03/11/2026, 16:40, Bengaluru
- 173 HC-KAR
(x)
The stand of BMRCL, as recorded in this order, is deprecated for the reasons set out under Point No. (vi).
(xi)
BMRCL shall file a memo of compliance in this Court, with a copy to the Petitioner, within two weeks after expiry of the period for handing over the ingress and egress. The memo shall state the dates on which the access was marked and handed over and the steps taken to facilitate the utility lines.
(xii) Either
side
directions
if
may a
apply
genuine
to
this
Court
for
difficulty
arises
in
carrying out the directions concerning access or utility lines, including a difficulty concerning the land over which the strips are to be marked or their length along the boundary. This liberty does not authorise reopening of the monetary issues reserved for civil trial. (xiii) Pending interlocutory applications, if any, stand disposed of. Any interim order in force stands merged in this order. (xiv) Though the writ petition is disposed of by this order, relist the matter on 22.01.2027 for the 03/11/2026, 16:40, Bengaluru
- 174 HC-KAR
Managing
Director
of
BMRCL
to
report
compliance.
This Court has been assisted by Ms. Harshada R.B., Law Clerk, in reviewing this judgment. 03/11/2026, 16:40, Bengaluru
(SURAJ GOVINDARAJ) JUDGE PRS, List No.: 1 Sl No.: 45