MR. Justus C K v. State of Karnataka
- Court
- High Court of Karnataka
- Date of judgment
- 7 November 2026
- Judge
- Justice Ashok S.kinagi
- Case number
- WP No. 3603 of 2026
- Result
- ALLOWED
- Acts & sections
- Section 12 Industrial Disputes Act, Article 309 Constitution, Article 16 Constitution, Article 14 Constitution, Article 136 Constitution
- Subject
- Service, Labour
Full judgment
-1HC-KAR
IN THE HIGH COURT OF KARNATAKA AT BENGALURU DATED THIS THE 7TH DAY OF NOVEMBER, 2026 BEFORE THE HON'BLE MR. JUSTICE ASHOK S.KINAGI WRIT PETITION NO. 3603 OF 2026 (S-RES) C/W WRIT PETITION NO. 38357 OF 2025 (S-RES)
IN WP No. 3603/2026 BETWEEN:
Digitally signed by B NAGAVENI Location: HIGH COURT OF KARNATAKA
1.
MR. JUSTUS C K S/O. LATE, CK GEORGE, AGED ABOUT 39 YEARS, HAVING WORKING AS ASSISTANT EXECUTIVE ENGINEER (M) OFFICE OF EXECUTIVE ENGINEER (M) -1, YTPS, RPCL YERAMARAS, RAICHURU DISTRICT - 584135
2.
KUSHAVANT R KONNUR, S/O. RAJAPPA F KONNUR AGED ABOUT 35 YEARS, WORKING AS ASSISTANCE EXECUTIVE ENGINEER (E) OFFICE OF EXECUTIVE ENGINEER (O AND M) SUPA, KPCL, GANESHGUDI, TOIDA TALUK, UTTARAKANNADA DISTRICT - 581365,
3.
SOUMYA D/O. LATE DEVENDRA M C, AGED ABOUT 38 YEARS, WORKING AS ASSISTANCE EXECUTIVE ENGINEER (E), OFFICE OF CHIEF ENGINEER DESIGN KPCL GREEN BUILDING, BENGALURU -560001
-2HC-KAR
4.
PRAVEEN V CHAVADI S/O. LATE, VIRUPAKSHI CHAVADI, AGED ABOUT 37 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER (M) OFFICE OF S E (O) BTPS, EE(ST-3)/ U-3, BTPS, BELLARY, THERMAL POWER STATION, BELLARY KARNATAKA - 583152
5.
SHAKTHIPRASAD S/O. LATE ASHOK G YADAVE, AGED ABOUT 36 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER (E) OFFICE OF CHIEF ENGINEER THERMAL DESIGN KPCL GREEN BUILDING, BENGALURU 560001.
6.
MADHUSHREE S D W/O. ROHAN S PURANIK, AGED ABOUT 35 YEARS WORKING AS ASSISTANT ENGINEER (C) KPCL, R/O 'RADHEY SHYAM', NO.1,2ND FLOOR, 4TH MAIN ROAD, CHANDRAMMA LAYOUT, BANASAVADI, KALYANNAGAR POST, BENGALURU-560043
7.
MAHESHWARA G S/O. K GANAPATHI, AGED ABOUT 33 YEARS, WORKING AS ASSISTANT ENGINEER, O/O EXECUTIVE ENGINEER (CIVIL) KARGAL, KARGAL POST, SAGARA TALUK SHIVAMOGGA DISTRICT PIN 577421
8.
RAGHUNANDAN N CHITRAK S/O. NARASIMHAMURTY VG CHITRAK AGED ABOUT 36 YEARS, WORKING AS ASSISTANT ENGINEER (M) OFFICE OF EXECUTIVE ENGINEERING
-3HC-KAR
(O,PS AND C)N, KPCL AMBIKANAGAR, HALIYAL TALUK, UTTARA KANNADA DISTRICT-581 363. 9.
NAVEED ASLAM H MULLA S/O. LATE, HASANMIYA, AGED ABOUT 42 YEARS WORKING AS EXECUTIVE ENGINEER (M), KARNATAKA POWER CORPORATION LTD THERMAL POWER STATION, BELLARI-583101.
10. MANJUNATHA LAKKUNDI S/O. SHANKAR LAKKUNDI, AGED ABOUT 40 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER, (C), O/O. EE(C)/ADPH, KPCL, ALMATTI DAM POWER HOUSE, SITIMANI, BAGALKOT 11. RAGHAVENDRA M MAYACHARI, S/O. MALAJAPPA MAYACHARI, AGED ABOUT 41 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGEENER, (PS AND O) JOG, JOGFALLS POST SAGARA TALUK, SHIVAMOGGA DISTRICT - 577435 12. SHIVAKUMAR G S/O. LATE GURUNANJAIAH, AGED ABOUT 44 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER, (M), AT EE/GTPS OFFICE, JANJGIR CHHATTISGARH DISTRICT, 13. RAGHU M S/O. LATE, SATHYANARAYANA MANKAN, AGED ABOUT 37 YEARS WORKING AS ASSISTANT EXECUTIVE ENGINEER, (C), OFFICE OF CHIEF ENGINEER (O&M) YCCPP, YELAHANKA - 560063.
-4HC-KAR
14. SANKET S/O. LATE, NARAYAN RAO AGED ABOUT 41 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER, (M), OFFICE OF EXECUTIVE ENGINEERING (SHP) 2 RTPS, KPCL SHAKTHINAGARA DISTRICT, RAICHUR 584170. 15. DEEPAK G MATH S/O. LATE, G K MATH AGED ABOUT 47 YEARS, WORKING AS EXECUTIVE ENGINEER, (C), 0/0. EE(OLA)C-1/RTPS, KPCL SHAKTINAGAR, DISTRICT RAICHUR 584170. 16. CHETAN L CHAVAN, S/O.LATE, LAKSHMANARAV CHAVAN, AGED ABOUT 47 YEARS, WORKING AS EXECUTIVE ENGINEER, (M), O/O. EXECUTIVE ENGINEER, (MM)-1, RTPS, KPCL, SHAKTINAGAR DISTRICT, RAICHUR 584170. 17. SRINIVAS PRATAP M S/O. MAHADEVAPPA, AGED ABOUT 34 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER, (M), O/O. THE EEST-4/U7 & 8, RTPS, KPCL, SHAKTINAGAR DISTRICT, RAICHUR 584170. 18. PRITHVIRAJ R SHET, S/O. LATE, RAMESH G SHET, AGED ABOUT 38 YEARS WORKING AS ASSISTANCE ENGINEER (M) /SE(O)/YTPS RAICHUR - 584170. 19. MAHESH KUMAR B S/O. RAMALINGAPPA AGED ABOUT 30 YEARS,
-5HC-KAR
WORKING AS ASSISTANT ENGINEER, (M), O/O. 4/U7AND8, RTPS, KPCL, SHAKTINAGAR DISTRICT, RAICHUR -584170. 20. RAVEESH VIJAYA KUMAR C D, S/O. LATE, R DEVAKUMAR, AGED ABOUT 41 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER, (M), OFFICE OF EXECUTIVE ENGINEER (M-4), YERMARUS THERMAL POWER STATION, CHICKASUGUR RAICHUR 584 134. 21. VENKATESH G S/O. LATE G NARASIMULU, AGED ABOUT 46 YEARS WORKING AS EXECUTIVE ENGINEER(E) OFFICE OF EXECUTIVE ENGINEER, (CHPE-1), RTPS, KPCL, SHAKTINAGAR, RAICHURU TALUK AND DISTRICT - 584170. 22. DEVANAGOWDA B T TOPANAGOWDA, S/O.BASAVANAGOWDA TOPANAGOWDA, AGED ABOUT 39 YEARS WORKING AS ASSISTANT ENGINEER(E) EXECUTIVE EXECUTIVE ENGINEER (O&M) KADRA, KPCL KARWAR TALUK, UTTARA KANNADA DISTRICT -581301 23. K PAVAN KUMAR S/O. LATE, K RAMARAO AGED ABOUT 43 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER, (E) 0/0. EXECUTIVE ENGINEER (ST-4/U/12), RTPS, KPCL SHAKTINAGAR, TALUK AND DISTRICT RAICHUR 584 170. 24. RAMDAS SHANKAR DESAI, S/O. S R DESAI, AGED ABOUT 49 YEARS, WORKING AS EXECUTIVE ENGINEER(C)
-6HC-KAR
O/O.. EXECUTIVE ENGINEER (C) KADRA, KPCL KARWAR TALUK, UTTARA KANNADA DISTRICT 581301 25. PRASANNA KUMAR G R S/O. RAJE GOWDA N AGED ABOUT 45 YEARS, WORKING AS EXECUTIVE ENGINEER (E), (UG) O/O. EXECUTIVE ENGINEER (O&M) LPH, KPCL, LINGANAMAKKI, SAGARA TALUK, SHIVAMOGGA DISTRICT 577421. 26. SHARANABASAPPA, S/O. LATE MARTHANDAPPA, AGED ABOUT 41 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER(M), 0/0. EXECUTIVE ENGINEER (M-1), YERMARUS THERMAL POWER STATION, CHICKASUGUR-584134 …PETITIONERS (BY SRI. VIKRAM HUILGOL, SR. COUNSEL FOR SRI. SHOWRI H R., ADVOCATE) AND:
1.
STATE OF KARNATAKA REP. BY ITS ADDITIONAL CHIEF SECRETARY TO GOVERNMENT, ENERGY DEPARTMENT, VIKAS SOUDHA, DR. AMBEDKAR VEEDHI, BENGALURU 560 001
2.
KARNATAKA POWER CORPORATION LIMITED, REP. BY ITS MANAGING DIRECTOR, SHAKTHI BHAVANA, RACE COURSE ROAD, BENGALURU 560 001
-7HC-KAR
3.
THE DIRECTOR (ADMIN AND HR) SHAKTHI BHAVANA, RACE COURSE ROAD, BENGALURU 560 001 ....RESPONDENTS
(BY SRI. SHASHI KIRAN SHETTY, A.G., ALONG WITH SRI. G RAMESH NAIK, AGA FOR R1 SRI. SHASHIKIRAN SHETTY, SR. COUNSEL FOR SRI. AJAY J NANDALIKE, ADVOCATE FOR R2 & R3)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227 OF THE CONSTITUTION OF INDIA PRAYING TO QUASHING THE PROVISIONAL SENIORITY LIST-II DATED. 01.12.2025 ISSUED BY THE RESPONDENT NO.2 KARNATAKA POWER CORPORATION LIMITED (KPCL FOR SHORT), VIDE ANNEXURE-A.
B)
ISSUE A WRIT OF MANDAMUS OR ANY
OTHER DIRECTION THAT THE ACT OF THE RESPONDENT NO.2 APPLYING THE RATIO OF THE ORDER AT ANNEXURE PASSED BY THIS HON'BLE COURT ON PETITIONERS AND REVISING THE SENIORITY LIST AS PER ANNEXURE- A IS IMPROPER AND NOT JUSTIFIED.
C) ISSUE ANY OTHER WRIT OR DIRECTION TO
MEET THE ENDS OF JUSTICE. D) AND PASS ANY ORDERS AS DEEMED FIT AND PROPER IN THE FACTS AND CIRCUMSTANCE OF THE CASE. IN WP NO. 38357/2025 BETWEEN: 1.
H B SIDDALINGASWAMY
-8HC-KAR
S/O S BASAVANNA AGED ABOUT 45 YEARS DESIGNATION EXECUTIVE ENGINEER (MECHANICAL) VARAHI HYDRO ELECTRIC PROJECT EC NO 05-2645 R/AT NO.T-4/12 KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282 2.
MANJUNATH P N S/O NANJEGOWDA AGE ABOUT 46 YEARS. DESIGNATION EXECUTIVE ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO-2648 R/AT TYPE- B/67, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170
3.
MANJUNATH H S S/O SHAMANNA AGED ABOUT 47 YEARS DESIGNATION EXECUTIVE ENGINEER (ELE) KPCL, CEED, BENGALURU-560 001. EC NO 05-2498 R/AT NO.10/1, 1ST MAIN ROAD, JUSTICE BHIMAYYA LAYOUT K R PURAM, BENGALURU- 560 036.
4.
SUMA H D/O LATE HANUMANTHARAYA AGED ABOUT 48 YEARS DESIGNATION EXECUTIVE ENGINEER(M) KPCL, CEED, BENGALURU-560 001. EC NO 05-2529 R/AT NO.530, 1ST MAIN ROAD, C CROSS, 3RD STAGE, 4TH BLOCK, BASAVESHWARA NAGAR, BENGALURU-560079
-9HC-KAR
5.
KRISHNEGOWDA LK S/O KANTHARAJU AGED ABOUT 40 YEARS DESIGNATION: ASSISTANT EXECUTIVE ENGINEER(ELE) KPCL, BIDADI WASTE TO ENERGY PROJECT. EC NO 06-10152 R/AT NO.244, 7TH MAIN, RPC LAYOUT HAMPINAGARA, VIJAYANAGARA, BENGALURU-560104
6.
RAJESH D S/O DEVAIAH L AGED ABOUT 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER(ELE) KPCL, YERMARUS THERMAL POWER STATION. EC NO 06-10174 R/AT NO.301,3RD FLOOR, B3 BLOCK YTPS BUILDING, KPCL COLONY, SHAKTINAGAR RAICHUR- 584170
7.
SUNIL KUMAR K S/O KRISHNEGOWDA K C AGED ABOUT 35 YEARS DESIGNATION ASSISTANT ENGINEER (MECH) KPCL, BIDADI WASTE TO ENERGY PROJECT. EC NO 07-10511 R/AT NO.44/1, KURUBALLI DODDI, KABBAL POST, SATHANUR HOBLI, KANAKAPURA TALUK, BENGALURU SOUTH DIST-562126
8.
PRADEEP M S/O NAGARAJU S.M AGED ABOUT 38 YEARS DESIGNATION ASSISTANT ENGINEER(ELE) KPCL, SHIVASAMUDRA POWER HOUSE. EC NO 07-10165 R/AT NO.514, 9TH CROSS,
- 10 HC-KAR
TK LAYOUT, MYSORE-570009 9.
SHWETHA M P W/O VINOD P AGED ABOUT 40 YEARS DESIGNATION ASSISTANT ENGINEER(ELE) KPCL, SHIVASAMUDRA POWER HOUSE. EC NO 07-10172 R/AT NO.119/A, 1ST MAIN, 4TH CROSS, MS LAYOUT, JARAGANAHALLI, JP NAGAR, 6TH PHASE, BENGALURU-560078
10.
SHESHU M S/O MADAIAH AGED ABOUT 52 YEARS DESIGNATION EXECUTIVE ENGINEER(MECH) KPCL, CEED, BENGALURU-560 001. EC NO 05-2490 R/AT NO.340/1, BESIDE MADESWARA TEMPLE T NARASIPURA MAIN ROAD, ALANAHALLI MYSORE- 570 028.
11.
UMADEVI G W/O PRAVEEN S HIREMATH AGED ABOUT 52 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER(E) KPCL, CEED, BENGALURU-560 001. EC NO 06-2895 R/AT NO.33A, SHREE LINGA BASAVESHWARA NILAYA 2ND CROSS, SNEHANAGARA, AMRUTHAHALLI MAIN ROAD, BYATARAYANAPURA, BENGALURU-560092
12.
UDAY K M S/O MURALISHANKAR AGED ABOUT 39 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELE) KPCL, CEED,
- 11 HC-KAR
BENGALURU-560 001. EC NO 06-10154 R/AT MAIN ROAD, 1ST BLOCK KALVARA(POST), KAIVARA CHINTAMANI TALUK, CHIKKABALLAPURA DIST -563128 13.
YASHASWINI T C D/O CHANDARA RAJ URS T G AGED ABOUT 35 YEARS DESIGNATION ASSISTANT ENGINEER(E) KPCL, CEED, BENGALURU-560 001. EC NO 07-10489 R/AT NO.3419, 2ND FLOOR, 6TH CROSS ROAD GAYATRI NAGAR, RAJAJINAGAR BENGALURU-560021
14.
DUSHYANTH T S/O LATE THIRUMALE GOWDA AGED ABOUT 48 YEARS DESIGNATION EXECUTIVE ENGINEER(M) KPCL, CETD, BENGALURU-560 001. EC NO 05-2646 R/AT 2C JAYANTH SANTIS, RAMANASHREE CALIFORNIA GARDENS, ANANTHPURA GATE, YELAHANKA, BENGALURU-560064
15.
KEERTHI R S/O LT. RAMEGOWDA AGED ABOUT 48 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER(M) KPCL, CETD, BENGALURU-560 001. EC NO 06-2705 R/AT RAVI ARAMANE, BCC LAYOUT, 2ND STAGE, 4TH CROSS, CHANDRA LAYOUT BENGALURU-560040
16.
NEELAM G GAONKAR
- 12 HC-KAR
D/O GOPINATH F GAONKAR AGED ABOUT 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER(E) KPCL, EESOLAR, BENGALURU-560 001. EC NO 06-2794 R/AT NO.8 T1, SHREYAS APARTMENT, 6TH MAIN, 13TH CROSS, VYALIKAVAL, BENGALURU-560003 17.
SHANTHAMANI D/O LT. SIDDANAGOUDA PATIL AGED ABOUT 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER(E) KPCL, EESOLAR, BENGALURU-560 001. EC NO 06-2894 R/AT M2004, BLOCK4, MANTRI SERENITY, DODDAKALLASANDRA, BENGALURU-560064
18.
GANESHA C S/O CHANDRAPPA V AGED ABOUT 42 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER(M) KPCL, CE(MINES), BENGALURU-560 001. EC NO 06-2902 R/AT NO.76/2, 2ND FLOOR, VARALAKSHMI NILAYA, GOVINDAPPA ROAD, BASAVANAGUDI, BENGALURU-560004
19.
PALLAVI H N D/O NARAYANASWAMY D AGED ABOUT 38 YEARS DESIGNATION ASSISTANT ENGINEER(M) KPCL, CE(MINES), BENGALURU-560 001. EC NO 07-10229 R/AT NO.360, 6TH CROSS, 1ST FLOOR, BCC LAYOUT, CHANDRA LAYOUT BENGALURU-560040
- 13 HC-KAR
20.
SHIVAPRAKASH S S/O SAHEBAGOWDA PATIL AGE ABOUT 46 YEARS DESIGNATION EXECUTIVE ENGINEER (MECH) KPCL, BELLARY THERMAL POWER STATION, EC NO 2642 R/AT NO.407, RAGA FORT KOLAGAL ROAD, VIDYA NAGAR BALLARI, PIN-583104
21.
SANTOSH KUMAR M S S/O CHANDRASHEKAR RAO M S AGED ABOUT 34 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELE) KPCL, BELLARY THERMAL POWER STATION, EC NO 10579 R/AT PLOT NO.8/9, V V COLONY HARIPRIYA NAGARA, MOKA ROAD BALLARI, 583103
22.
MANJUNATHA B S/O LAKSHMAPPA B AGED 37 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) KPCL, BELLARY THERMAL POWER STATION, BELLARY, EC NO 06-10207 R/AT NO.619, W NO.29 B/H INDIAN BANK, BELAGAL CROSS AT POST BALLARI-583104
23.
SHANTHAMALLAPPA S/O SHANKARAPPA AGED ABOUT 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) KPCL BELLARY THERMAL POWER STATION, BELLARY, EC NO 10204 R/AT NO.17, GURU CRESCENT, A2 HOUSE, AISHWARYA COLONY BALLARI-583101
- 14 HC-KAR
24.
KARTHIKA KAMMAR S/O K KOMARASWAMY AGED ABOUT 37 YEARS DESIGNATION AEE(M) KPCL, BELLARY THERMAL POWER STATION, BELLARY, EC NO 10192 R/AT 'NAMMANE', 1ST WARD YASHAWANTHA NAGAR POST, SANDUR TALUK, BALLARI-583124
25.
CHETHAN KUMAR S/O CHANDRASHEKAR AGED 39 YEARS DESIGNATION AEE(E) KPCL, BELLARY THERMAL POWER STATION, BELLARY, EC NO 10150 R/AT NO.201, GS HEIGHTS BEHIND KAVITHA WINES, TALUR ROAD BALLARI-583103
26.
JADESH KUMAR SHETTY S/O SATHYA NARAYANA SHETTY AGED 42 YEARS DESIGNATION AEE (E)KPCL, BELLARY THERMAL POWER STATION, BELLARY, EC NO 10159 R/AT PLOT NO 17C, VADDE NAGAPPA COLONY NEAR JAYARAMA VIDYALAYA SCHOOL CONTONMENT, BELLARY 583104
27.
GIRISH BEVOOR S/O K F BEVOOR AGED 46 YEARS DESIGNATION EXECUTIVE ENGINEER (ELE) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 2692 R/AT 1025, OPPOSITE AKASHAVANI 2ND CROSS, 35TH WARD VIDYARANYA BADAVANE
- 15 HC-KAR
HOSPET-583201 28.
ADARSHA M S/O MANJUNATHA REDDY AGED 36 YEARS DESIGNATION ASSISTANT ENGINEER(ELE) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 07-10491 R/AT NO.10, RENUKA NAGAR 17 TH CROSS, TALUR ROAD, BALLARI 583103
29.
VANISHREE V B W/O B SHAILESH AGED 41 YEARS DESIGNATION AEE (E) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 10281 R/AT MIG 2-14, GANDHINAGAR KHB NEAR BALABHODINI SCHOOL BALLARI 583103
30.
SANTHOSH KUMAR H T S/O THIPPANNA S AGED 37 YEARS DESIGNATION AE(M) KPCL, BELLARY THERMAL POWER STATION, BELLARY, EC NO 10515 R/AT NO.48 AND 49 GROUND FLOOR, NEAR KIDZEE SCHOOL BHATRI ROAD, VIDYA NAGAR, BALLARI-583104
31.
SHIVAGOND BIRADAR S/O RAMAGOND AGE 39 YEARS DESIGNATION ASSISTANT ENGINEER (MECHANICAL) KPCL, BELLARY THERMAL POWER STATION, BALLARI EC NO 10513 R/AT NO.378, 5TH MAIN, KUVEMPU NAGAR
- 16 HC-KAR
BALLARI-583115 32.
KRISHNA RANGAYYA S/O VENKATA RANGAYYA AGE 38 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 10191 R/AT GANDHINAGAR, BALLARY-583158
33.
BABU KUMAR H S/O KARIYAPPA AGE 39 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) KPCL, BELLARY THERMAL POWER STATION, EC NO 10216, R/AT 14TH WARD, SUBHASH NAGAR, CHAPPARDALLI, SANDUR, BALLARY-583119
34.
HULIRAJA G S/O G VENKAPPA AGE 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECH) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 10213 R/AT NO.188, SKANDAPUR LAYOUT, SANDUR, SANDUR TALUK,. BALLARY-583119
35.
MALLIKARJUNA B S/O B KM OMKARAPPA AGE 43 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECH) KPCL, BELLARY THERMAL POWER STATION, BELLARY R/AT NO.33, 1ST CROSS, KUVEMPU NAGARA, BALLARI 583104
- 17 HC-KAR
36.
NAGANJAN S L S/O LAKHISHMALAH SHETTY SN AGE 43 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELE) KPCL, BELLARY THERMAL POWER STATION, EC NO 2889 R/AT NO.8, 1ST FLOOR, 4TH CROSS VIDYA NAGAR, WEST BALLARI-583104
37.
SACHIN V MAHAPURUSH S/O VIVEKANANDA SWAMY M AGED 37 YEARS DESIGNATION ASSISTANT ENGINEER (ELE) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 10474 R/AT G04, SURYA HILL VIEW APRT, VIDYANAGAR, 4TH CROSS, BELLARY-583104
38.
IKRAMUDDIN LANGOTI S/O NIJAMUDDIN AGE 41 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 10202 R/AT SURYA HILL VIEW APRT, VIDYANAGAR 4TH CROSS, BELLARY-583104
39.
K SOUJANYA W/O KRISHNA KISHORE AGE 34 YEARS DESIGNATION ASSISTANT ENGINEER (MECHANICAL) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 10531 R/AT NO.33, VADDE NAGAPPA COLONY TILAK NAGAR, BALLARI-583101
40.
RAVI KUMARA B M AGE 39 YEARS
- 18 HC-KAR
DESIGNATION ASSISTANT ENGINEER (MECHANICAL) KPCL, BELLARY THERMAL POWER STATION, BELLARY EC NO 10201 R/AT BHARADWAJA NILAYA 4TH CROSS, VIDYA NAGAR BALLARI-583104 41.
NIRANJANA MURTHY. T.N S/O T G NAGARAJA AGED ABOUT 45 YEARS DESIGNATION EXECUTIVE ENGINEER (E) KPCL, SHARAVATHY POWER GENERATING STATION EC NO. NO. 2497 R/AT H. NO. PC 10, SE MOUNT, KPCL, JOG FALLS SAGAR TQ. SHIMOGA DIST. -577435
42.
ALLAMAPRABHU M. AMBI S/O MALLAPPA M. AMBI AGED ABOUT 51 YEARS DESIGNATION EXECUTIVE ENGINEER (E) KPCL, SHARAVATHY POWER GENERATING STATION EC NO. NO. 2531 R/AT H. NO. 82/2, KPCL COLONY, KARGAL, SAGAR TQ. SHIMOGA DIST. -577435
43.
HASEENA K., W/O MOHAMMED AFROZ AHAMED AGED ABOUT 46 YEARS DESIGNATION EXECUTIVE ENGINEER (E) KPCL, SHARAVATHY POWER GENERATING STATION EC NO 2538 R/AT II. NO. PC 11, SE MOUNT, KPCL, JOG FALLS SAGAR TQ, SHIMOGA DIST. -577435
44.
APPANNA N.K S/O KUTTAPPA N.K AGED ABOUT 48 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (E)
- 19 HC-KAR
EC NO 2888 R/AT D NO 432, GOKULAM, VIJAYNAGAR, 2ND STAGE, 1ST MAIN, 6TH CROSS, SAGAR (T)-577401 45.
SHLIPA S. MOTHI, W/O NIRANJANA MURTHY. T. N AGED ABOUT 46 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (M) KPCL, GERUSOPPA POWER HOUSE. EC NO 2652 R/AT B-13/2, KPC COLONY, JYOTHINAGAR, GERUSOPPA-581384
46.
VENKATESHA R S/O LATE RUDRAMUNI AGED ABOUT 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (E) KPCL, SHARAVATHY POWER GENERATING STATION EC NO 10171 R/AT H.NO. PF 5/2 SVP COLONY, KPCL, JOG FALLS SAGAR (T), SHIMOGA (D) -577435
47.
MOHAMMED FAROOK AHMED S/O LATE MOHAMMED BASHEER AHMED AGED ABOUT 41 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (E) KPCL, SHARAVATHY POWER GENERATING STATOION EC NO 10170 R/AT H.NO. PF-5/1, S.V.P COLONY, KPCL, JOGFALLS SAGAR (T), SHIMOGA (D)-577435
48.
CHANNAKESHAVA B.K S/O BANDI KERIYAPPA AGED ABOUT 41 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER. (E) KPCL, SHARAVATHY POWER GENERATING STATOION EC NO 10153 R/AT H.NO. PF 23/2, SVP COLONY, KPCL, JOG FALLS SAGAR (T), SHIMOGA (D)-577435
- 20 HC-KAR
49.
SHIVANAND YAJI S/O MANJUNATHA YAJI AGED ABOUT 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (E) KPCL, GERUSOPPA POWER HOUSE EC NO.10160 R/AT B-16/1, KPC COLONY, JYOTHINAGAR, GERUSOPPA-581384
50.
DIVYA S W/O MANOHARA C AGED ABOUT 37 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (E) KPCL, SHARAVATHY POWER GENERATING STATION EC NO. 10185 R/AT H. NO. B2/2, KPCL COLONY, KARGAL-577435 SAGAR TQ. SHIMOGA DIST.
51.
RAVISHANKAR S B S/O BASAVARAJAPPA S AGED ABOUT 36 YEARS DESIGNATION ASSISTANT ENGINEER (E). KPCL, SHARAVATHY POWER GENERATING STATION EC NO-10168 R/AT H NO PF 1/2 SVP COLONY, KPCL, JOG FALLS SAGAR (T), SHIMOGA (D) -577435
52.
PURUSHOTHAMA S S/O SREENIVASACHARI M AGED ABOUT 35 YEARS DESIGNATION ASSISTANT ENGINEER (E) KPCL, GERUSOPPA POWER HOUSE EC NO 10473 R/AT B-17/1, KPC COLONY, JYOTHINAGAR, GERUSOPPA-581384
53.
MARUTHI L S/O LAKSHMINARASIMHAIAH AGED ABOUT 35 YEARS
- 21 HC-KAR
DESIGNATION ASSISTANT ENGINEER (E) KPCL, GERUSOPPA POWER HOUSE EC NO-10581 R/AT B-12/1, KPC COLONY, JYOTHINAGAR, GERUSOPPA-581384 54.
SATISH KUMAR K S/O KRISHNAPPA P AGED ABOUT 36 YEARS DESIGNATION ASSISTANT ENGINEER (E) KPCL, GERUSOPPA POWER HOUSE EC NO 10475 R/AT B-17/2, KPC COLONY, JYOTHINAGAR, GERUSOPPA-581384
55.
PRASAD S S/O SHIVANNA R AGE 35 YEARS DESIGNATION ASSISTANT ENGINEER (M) KPCL, BHADRA GENERATING STATION E.C.NO 10509 R/AT H.NO. TYPE B 3/3, BHEP COLONY, KPCL, B R PROJECT -577115 BHADRAVATI (T), SHIMOGA(D)
56.
MEGHARAJA H H S/O LATE HUCHAPPA H H AGED ABOUT 52 YEARS ASSISTANT EXECUTIVE ENGINEER (M) KPCL, SHARAVATHY POWER GENERATING STATION EC NO. 06-2905 R/AT B BLOCK DOOR NO 4/4 SVP COLONY, KPCL JOG FALLS-577435 SAGAR T, SHIMOGA DISTRICT
57.
MANJOORILAHI JAKATI S/O MAHAMMADARAFIK JAKATI AGED ABOUT 37 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (CIVIL) KPCL, NAGJHARI POWER HOUSE. EC NO 06-10462 R/AT H.NO 28/2, TYPE 5, 2ND COLONY, KPCL,
- 22 HC-KAR
AMBIKANAGAR, DANDELI-581363 58.
ZAHEER AHAMAD S/ O SULAIMAN SAHEB AGED ABOUT 40 YEARS DESIGNATION ASSISTANT ENGINEER (ELECTRICAL) VARAHI HYDRO ELECTRIC PROJECT EC NO 07-10498 R/AT NO.T-3/27/2, KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282
59.
KISHORE KUMAR SHETTY B S/ O LATE VASU SHETTY. AGED ABOUT 43 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECH) VARAHI HYDRO ELECTRIC PROJECT EC NO 06-2808 R/AT NO.T-4/09 KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282
60.
DINESH NAYAK S/O LATE MANJUNATHA NAYAK AGED ABOUT 41 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER(ELECTRICAL) VARAHI HYDRO ELECTRIC PROJECT EC NO 06-10179 R/AT NO.T-3/4/2 KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282
61.
VISHWANATHA S K S/ O KODANDARAM AGED ABOUT 39 YEARS DESIGNATION ASSISTANT ENGINEER(MECHANICAL) VARAHI HYDRO ELECTRIC PROJECT EC NO 07-10506 R/AT NO.T-3/43/2
- 23 HC-KAR
KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282 62.
MAHESHACHARI MAYACHARI S/O LATE NAGENDRA ACHARI AGED ABOUT 39 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER(ELECTRICAL) VARAHI HYDRO ELECTRIC PROJECT EC NO 06-10175 R/AT NO.T-3/3/1 KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282
63.
CHETHANA S SHETTY S/O SHIVARAMA SHETTY AGED ABOUT 37 YEARS DESIGNATION ASSISTANT ENGINEER (ELECTRICAL) VARAHI HYDRO ELECTRIC PROJECT EC NO 07-10479 R/AT NO.T-3/47/2 KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282
64.
MADHU K R S/O REVANASIDDAPPA K U AGED ABOUT 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELECTRICAL) VARAHI HYDRO ELECTRIC PROJECT EC NO 06-10173 R/AT NO.T-3/32/1 KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282
65.
VAGESH HIREMATH S/O BASAVARAJAYYA AGED ABOUT 43 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELECTRICAL)
- 24 HC-KAR
VARAHI HYDRO ELECTRIC PROJECT E.CODE 06-2686 R/AT NO.T-4/3 KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282
66.
RADHESH S/O. CHANDAYA BONTRA AGED ABOUT 35 YEARS DESIGNATION ASSISTANT ENGINEER (ELECTRICAL) KODSALLI POWER HOUSE E. CODE 07-10490 R/AT NO.B-10/3 KPCL COLONY, KADRA KARAWAR, UTTAR KANNADA- 581396
67.
K SHASHIDAR S/ O K BASAVARAJ AGED ABOUT 44 YEARS DESIGNATION EXECUTIVE ENGINEER (ELECTRICAL) VARAHI HYDRO ELECTRIC PROJECT E.CODE 05-2499 R/AT NO.T-5/3 KPCL COLONY, HOSANGADI KUNDAPURA TALUK, UDUPI-576282
68.
SHRUTHI C. W/O ABHIJITH AGED ABOUT 37 YEARS DESIGNATION ASSISTANT ENGINEER (ELECTRICAL) VARAHI HYDRO ELECTRIC PROJECT EC NO 07-10176 R/AT NO.T-3/8/1, KPCL COLONY, HOSANGADI, KUNDAPURA TALUK UDUPI-576282
69.
SHWETHA TJ W/O NAVEEN CP AGED ABOUT 34 YEARS
- 25 HC-KAR
DESIGNATION ASSISTANT ENGINEER (ELE) KPCL, SHIVA HYDRO EIEC NOTRIC STATION. EC NO 07-10500 R/AT HOUSE NO C1, SBI BANK ROAD, KPCL SHIVA COLONY, BLUFF, SHIVASAMUDRAM, MALAVALLI 571430 70.
SHIVAKUMAR B S/O NAGENDRACHARI AGE ABOUT 40 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO-10525 R/AT TYPE- 5/73, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170
71.
YALLAPPA S/O SHIVAPPA MADDIKAR AGE ABOUT 35 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (CIVIL), KPCL, RAICHUR THERMAL POWER STATION EC NO-10451 R/AT TYPE- 4/61, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170
72.
LANKESH KUMAR M D S/O DEVARAJE GOWDA M B AGE ABOUT 36 YEARS DESIGNATION ASSISTANT ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO-10206 R/AT TYPE- B/94, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170
73.
SRINIVASA S C S/O CHIKKANNA AGE ABOUT 36 YEARS DESIGNATION ASSISTANT ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO-10526
- 26 HC-KAR
R/AT TYPE- 5/158, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170 74.
NATESH BABU C S S/O SRINIVASAPPA AGE ABOUT 38 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (CIVIL), KPCL, RAICHUR THERMAL POWER STATION EC NO 10452 R/AT TYPE- B3/502, YTPS QRTS, RTPS COLONY, SHAKTHINAGAR. RAICHUR 584170
75.
NAGRAJ S/O BHEEMANNA AGE ABOUT 42 YEARS. DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO-10211 R/AT H.NO T-4/67, RTPS COLONY, SHAKTHINAGAR RAICHUR 584170
76.
SHIVARUDRA S/O SHIVANNA AGE ABOUT 37 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO. 06-10203 R/AT B3-501, RTPS COLONY, SHAKTHINAGAR RAICHUR 584170
77.
SURESH B S/O BHEEMAPPA AGE ABOUT 33 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO-10528
- 27 HC-KAR
R/AT T-6-702, RTPS COLONY, SHAKTHINAGAR RAICHUR 584170 78.
SOMEGOWDA B.S S/O SOMEGOWDA AGE ABOUT 36 YEARS DESIGNATION ASSISTANT ENGINEER (MECHANICAL) KPCL, RAICHUR THERMAL POWER STATION EC NO10514 R/AT H.NO T-5/173 RTPS COLONY, SHAKTHINAGAR RAICHUR 584170
79.
AMRUTH C S/O CHANDRA NAIK C K AGE ABOUT 35 YEARS EC NO-10584 DESIGNATION ASSISTANT ENGINEER (MECHANICAL) KPCL, RAICHUR THERMAL POWER STATION EC NO10584 H NO.T-5/208RTPS COLONY, SHAKTHINAGAR RAICHUR-584170
80.
ABHISHEK NAIK M S/O MOTHILAL NAIK AGE ABOUT 34 YEARS, EC NO-10535 DESIGNATION ASSISTANT ENGINEER (MECHANICAL). KPCL, RAICHUR THERMAL POWER STATION EC NO. 10535 R/AT H.NO T-5/190 RTPS COLONY, SHAKTINAGAR RAICHUR-584170
81.
SUGURESH S/O NAGAREDDY AGE ABOUT 42 YRS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO 2810
- 28 HC-KAR
R/AT H.NO-T-4/64 RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170 82.
MANJUNATHA G K S/O KRISHNAPPA AGE ABOUT 41 YRS DESIGNATION ASSISTANT ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO.NO-07-10518 R/AT H.NO-TYPE-B/40 RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170
83.
KRISHNAMURTHY G D. S/O DODDAIH AGE ABOUT 43 YEARS DESIGNATION ASSISTANT ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO.NO-10530 R/AT TYPE-5/175, RTPS COLONY, SHAKTHINAGAR RAICHUR-584170
84.
VINOD D S/O A DAS AGE ABOUT 35 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELE), KPCL, RAICHUR THERMAL POWER STATION EC NO. 10493 R/AT TYPE-B/50, RTPS COLONY, SHAKTHINAGAR RAICHUR-584170
85.
CHANDRASHEKAR E S/O ERAPPA AGE ABOUT 41 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELE), KPCL, RAICHUR THERMAL POWER STATION EC NO.NO-10164 R/AT TYPE-5/256
- 29 HC-KAR
RTPS COLONY, SHAKTHINAGAR RAICHUR-584170 86.
MAHESHWARI B D/O BASAVANNA AGE ABOUT 38 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELE),, KPCL, RAICHUR THERMAL POWER STATION EC NO.NO-10182 R/AT TYPE-5/256 RTPS COLONY, SHAKTHINAGAR RAICHUR-584170
87.
RAJASHEKAR S/O SANGAPPA AGE ABOUT 53 YEARS DESIGNATION EXECUTIVE ENGINEER (MECHANICAL) KPCL, RAICHUR THERMAL POWER STATION EC NO.NO-2647 R/AT TYPE- B-9, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170
88.
MANJUNATH H SONNAD AGE ABOUT 48 YEARS DESIGNATION EXECUTIVE ENGINEER (MECHANICAL) KPCL, RAICHUR THERMAL POWER STATION EC NO.2434 R/AT TYPE-3/H NO.3, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170
89.
MANJUNATH HALEGOUDRA S/O THIMMANAGOUDA HALEGOUDRA AGE ABOUT 47 YEARS,. DESIGNATION EXECUTIVE ENGINEER (MECHANICAL) KPCL, RAICHUR THERMAL POWER STATION EC NO. 2701 R/AT TYPE-5/192, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170
90.
SATHISHA C
- 30 HC-KAR
91.
S/O CHIKKADASAIAH AGE ABOUT 39 YEARS DESIGNATION ASSISTANT ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO, NO-10524 R/AT TYPE-4/66, RTPS COLONY, SHAKTHINAGAR RAICHUR-584170 KRISHNA SANGA S/O SANTOSH AGE ABOUT 36 YEARS DESIGNATION ASSISTANT ENGINEER (ELE) KPCL, RAICHUR THERMAL POWER STATION EC NO. 10161 R/AT B-1/G3 RTPS COLONY, SHAKTHINAGAR RAICHUR-584170
92.
GIRIBABU M. C S/O CHOWDAPPA AGE ABOUT 49 YEARS DESIGNATION EXECUTIVE ENGINEER (MECHANICAL) KPCL, RAICHUR THERMAL POWER STATION EC NO. 2717 R/AT B-1/303 YTPS QUARTERS, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170
93.
ANAND S/O PRAHLAD GANGAVATI AGE ABOUT 44 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL), KPCL, RAICHUR THERMAL POWER STATION EC NO 10197 R/AT T-B/33, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170
94.
RAVI.B.S S/O SOMEGOWDA AGE ABOUT 41 YRS
- 31 HC-KAR
DESIGNATION ASSISTANT ENGINEER (MECHANICAL),, KPCL, RAICHUR THERMAL POWER STATION EC NO-10527 R/AT T-5/201, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170 95.
NAGARAJ M.G S/O GAIBU AGE ABOUT 38 YRS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (CIVIL),, KPCL, RAICHUR THERMAL POWER STATION EC NO.13382 R/AT YERAMARAS RAILWAY STATION AREA RAICHUR-584134
96.
RAKESH G.K S/O KUBERAPPA AGE ABOUT 33 YEARS DESIGNATION ASSISTANT ENGINEER (MECH),, KPCL, RAICHUR THERMAL POWER STATION EC NO-07-10521 R/AT T-5/271, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170
97.
GOVERDHAN S/O MALLIKARJUN AGE ABOUT 49 YEARS DESIGNATION EXECUTIVE ENGINEER (ELE), KPCL, RAICHUR THERMAL POWER STATION EC NO-2683 R/AT T-5/209, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170
98.
KADAPPA M NAYAK S/O LATE MAGEPPA S NAIK AGE ABOUT 55 YEARS DESIGNATION SUPERINTENDED ENGINEER (CIVIL), KPCL, RAICHUR THERMAL POWER STATION EC NO-2460 R/AT T-2/2, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170
- 32 HC-KAR
99.
CHANDRAPPA G S/O LATE GUGGARI HANUMANTHAPPA AGE ABOUT 35 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECH),, KPCL, RAICHUR THERMAL POWER STATION EC NO 10519 R/AT T-B/115, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170
100. TEKURI HARIBABU S/O LATE T KRISHNAIAH AGE ABOUT 35 YEARS DESIGNATION AE(E) KPCL, RAICHUR THERMAL POWER STATION EC NO-10580 R/AT T-5/179, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170 101. GOWRI MAHESH S/O LATE BASAVAIAH AGE ABOUT 46 YEARS DESIGNATION EE(E) KPCL, YERMARUS THERMAL POWER STATION EC NO-2630 R/AT T-4/88, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170 102. MAHESH N. VERNEKAR S/O NAGESH K VERNEKAR AGED ABOUT 46 YEARS DESIGNATION EXECUTIVE ENGINEER (ELE), KPCL, YERMARUS THERMAL POWER STATION EC NO-2662 R/AT T-B/14, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170
- 33 HC-KAR
103. NAGARJUN Y S/O YAJAMAN HN AGE ABOUT 37 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELE),, KPCL, YERMARUS THERMAL. POWER STATION EC NO-10151 R/AT H.N 81, AKSHARADAMA, NISARGA LAYOUT ABBIGERE BENGALURU -560090 104. SHASHIDHAR V KUNTOJI C/O VEERESH B KUNTOJI AGE ABOUT 40 YEARS. DESIGNATION ASSISTANT EXECUTIVE ENGINEER (CIVIL), KPCL, ALMATTI DAM POWER HOUSE. EC NO, NO-10449 R/AT OM NAGAR, NEAR POST OFFICE, BASAVANA BAGEVADI, BIJAPUR-586203 105. AYISHA I H D/O IMTHIYAZ HUSSAIN AGED ABOUT 36 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (ELE), KPCL, RAICHUR THERMAL POWER STATION EC NO, NO-10285 R/AT T-V/150, RTPS COLONY SHAKTHINAGAR, RAICHUR-584170 106. SHIVAKUMAR BARBARE S/O UMAKANT BARBARE AGE ABOUT 44 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECH), KPCL,, ALAMATTI DAM POWER HOUSE EC NO-2699 R/AT M.H.POWER P-19,22ND CROSS SHIVALAYA TEMPLE, VIDYAGIRI, BAGALKOT-587103
- 34 HC-KAR
107. KAVITHA AMBALI D/O RANGAPPA AMBALI AGED ABOUT 33YEARS DESIGNATION ASSISTANT ENGINEER (ELE) KPCL, ALAMATTI DAM POWER HOUSE. EC 10485 R/T SHRI ALLAMAPRABHU NILAYA, PLOT NO 63L, 4TH CROSS VIDYAGIRI, BAGALKOT-587102 108. KHAJAPEER T S/O MOHAMMED ISAK AGED ABOUT 37 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECH) KPCL, BALLARI THERMAL POWER STATION EC NO 10522 R/AT H NO 21 1ST WARD FORT, NEAR KALLESHWARA TEMPLE, HUVINA HADAGALI - 583219 109. RAMESH TR S/O LATE RAMAIAH AGED ABOUT 37 YEARS DESIGNATION ASSISTANT ENGINEER (ELE) KPCL, BALLARI THERMAL POWER STATION. EC 07-10477 R/T NO. GHOUSIA MANZIL, 1ST FLR, 1ST CROSS MK NAGAR, BALLARI- 583104 110. J NATARAJA S/O ESHWARAPPA J AGED ABOUT 38 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECH) KPCL, BALLARI THERMAL POWER STATION. EC 10209 R/T NO.209, VIDYANAGAR WEST KSR PEARL APARTMENT,
- 35 HC-KAR
3RD CROSS, BALLARI-583104 111. HANUMANTAPPA S/O YALLAPPA MADIVALAR, AGED ABOUT 38 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (CIVIL) KPCL, BALLARI THERMAL POWER STATION. EC 10459 R/T HOOLAGERI TQ, KUSTAGI DT KOPPAL PIN- 583281 112. ARUN PS S/O SANNEGOWDA, AGED ABOUT 39 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (CIVIL) KPCL, BALLARI THERMAL POWER STATION. EC 10458 R/T NO.28, NEAR OVERHEAD TANK PEEHALLI(V) KADIYALA(P) ARAKERE(H) SRIRANGAPATNA(T) MANDYA DIST-571415
113. GOPALKRISHNA V S/O SHANMUKHAPPA, AGED ABOUT 33 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER (CIVIL) KPCL, BALLARI THERMAL POWER STATION. EC 10463 R/AT NO.137, WARD NO.3, NEAR DYAVAMMA TEMPLE HOSADAROJI POST, SANDUR TALUK, BELLARY DISTRICT-583189. 114. PUSHPARAJA N S/O M CHANDAPPA POOJARY AGED ABOUT 41 YEARS DESIGNATION ASSISTANT ENGINEER (MECH)
- 36 HC-KAR
MASTHIKATTE-577448 EC 10217 R/AT PB 2/3, KPC COLONY, MASTHIKATTE, HOSANAGAR TALUK, SHIVAMOGGA-577448 115. RAMESH G V S/O GURAPPA AGE ABOUT 45 YEARS, DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) KPCL, RAICHUR THERMAL POWER STATION EC NO,2643 R/AT TYPE-B/130, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170 116. HARISH K M S/O M MOODALAGIRI GOWDA AGE ABOUT 44 YEARS, DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) O/O EE (O AND M), SHIVA, KPCL EC NO 2528 R/AT KL 586, 11TH CROSS APMC ROAD V V NAGAR, KALLAHALLI, MANDYA-571401 117. SHARANABASAVA S/O SUGAPPA K AGE ABOUT 35 YEARS, DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) EC NO. 13381 KPCL, RAICHUR THERMAL POWER STATION R/AT TYPE-V/320, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170 118. SHOBHA
- 37 HC-KAR
D/O VENKOBA AGE ABOUT 45 YEARS, DESIGNATION EXECUTIVE ENGINEER (ELE) KPCL, RAICHUR THERMAL POWER STATION EC NO,2637 R/AT TYPE-B3/103, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170 119. RAVI KUMAR V S/O VEERESH H AGE ABOUT 39 YEARS, DESIGNATION ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) KPCL, RAICHUR THERMAL POWER STATION EC NO, 10208 R/AT TYPE-B1/204, RTPS COLONY, SHAKTHINAGAR, RAICHUR-584170 120. S VIJAY KUMAR S/O S.H.SOMAPPA AGED ABOUT 46 YEARS DESIGNATION EXECUTIVE ENGINEER (ELE) KPCL, NAGJHARI POWER HOUSE. EC 2532 R/AT TYPE-4/49, KPCL COLONY, DANDELI TALUK_581363 UTTARA KANNADA DISTRICT 121. CHANNABASAVA S U S/O SHANMUKAPPA C U AGED ABOUT 35 YEARS OCC ASSISTANT ENGINEER (M) EC. NO. 10507 H. NO. 9/2, TYPE-5, FIRST COLONY, KPCL AMBIKANAGAR-581363 DANDELI TQ. UTTARA KANNADA DISTRICT. 122. GIRISH L S/O LAKSHMINARAYANA.M.C AGED ABOUT 39 YEARS DESIGNATION ASSISTANT EXECUTIVE ENGINEER
- 38 HC-KAR
(MECH) KPCL, BELLARY THERMAL POWER STATION. EC 07-10210 R/AT 2ND CROSS, AISHWARYA COLONY, BALLARI -583104 123. MAMATHA.S W/O ASHOK KUMAR.B.V AGED ABOUT 35YEARS DESIGNATION ASSISTANT ENGINEER (MECH) KPCL, SHIVA HYDRO POWER STATION. EC 07-10588 R/AT NO 2627, KOLAR MAIN ROAD, GANDHINAGAR, BANGARPETE, KOLAR-563114 124. PRIYANKA I W/O SIDDU RAVINDRA REDDY AGED ABOUT 36 YEARS DESIGNATION ASSISTANT ENGINEER(ELE) KPCL, CETD, BENGALURU-01 EC NO. 10157 R/AT NO. 203, VICTORY HARMONY APPT, SSA ROAD, CHOLANAYAKANAHALLI HEBBAL, BENGALURU, 560032, ...PETITIONERS (BY SRI. P.S. RAJGOPAL, SR. COUNSEL FOR SRI. PRASANNA V R., ADVOCATE) AND: 1.
THE KARNATAKA POWER CORPORATION LIMITED REP. BY ITS MANAGING DIRECTOR, NO.82, RACE COURSE ROAD, SHAKTHI BHAVAN, BENGALURU-560 001.
- 39 HC-KAR
2.
THE DIRECTOR (HR), THE KARNATAKA POWER CORPORATION LIMITED, NO.82, RACE COURSE ROAD, SHAKTHI BHAVAN, BENGALURU-560 001.
3.
THE GENERAL MANAGER (ADMIN. AND HR) THE KARNATAKA POWER CORPORATION LIMITED, NO.82, RACE COURSE ROAD, SHAKTHI BHAVAN, BENGALURU-560 001.
4.
SRI HARISHA K S/O KESHAVAMURTHY G AGED ABOUT 52 YEARS WORKING AS EXECUTIVE ENGINEER (MECHANICAL)IN THE OFFICE OF THE SE(O) KPCL-BTPS AND R/AT MANDARA NEAR VIDYARANTA TEMPLE VIDYARANYAPURA, SRINGERI CHIKKAMANGALORE DISTRICT - 577 139
5.
SRI SHANKAR V K S/O VISHWESHWAR S K AGED ABOUT 50 YEARS WORKING AS EXECUTIVE ENGINEER (ELECTRICAL) IN THE OFFICE OF THE SEEK KPCL-KADRA AND R/AT C/O ARAVINDA #605, SHRIHARI NILAYA 2ND FLOOR, 6TH CROSS, UPKAR LAYOUT BANGALORE - 560 091
6.
SRI SHANKAR SHAJAPPA LAMANI. S/O. SHAJAPPA LAMANI, AGED 48 YEARS WORKING AS EXECUTIVE ENGINEER. (CIVIL) IN THE OFFICE OF THE SE (C), KPCL-NPH. AMBIKANAGAR, NK. DIST.
- 40 HC-KAR
(RESPONDENT Nos.4 TO 6 ARE IMPLEADED AS PER THE COURT ORDER DATED 04.08.2026 ON I.A. NO.1/2026) 7.
SRI. VIJAYAKUMAR V.M.. S/O. VEERAPPA, AGED ABOUT 38 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER, (MECHANICAL), OFFICE OF THE EXECUTIVE ENGINER (ORM) KPCL, GERUSOPPA, JYOTHI NAGAR. UTTARA KANNADA DISTRICT- 581 384.
8.
SRI. SUDEEP K, S/O KRISHNA K.. AGED ABOUT 36 YEARS, WORKING AS ANSSISTANT EXECUTIVE ENGINER (CIVIL) OFFICE OF THE EXECUTIVE ENGINEER (CIVIL), KPCL, GERUSOPPA, JYOTHI NAGAR. UTTARA KANNADA DISTRICT-581-384.
9.
SRI MANOJ DESAI. S/O SATISH R DESAI. AGED ABOUT 37 YEARS. WORKING AS ASSISTANT ENGINEER (MACHANICAL) OFFICE OF THE EXECUTIVE ENGINEER (O&M), KPCL GERUSOPPA, JYOTHI NAGAR, UTTARA KANNADA DISTRICT-581384.
10.
SRI S M. GIREESHA. S/O B MAHADEVAPPA, AGED ABOUT 17 YEARS. WORKING AS EXECUTIVE ENGINEER (CIVIL), KPCL, GERUSOPPA, JYOTHI NAGAR. UTTARA KANNADA DISTRICT - 581 384.
11.
SRI SHREESHAIL KAMAGOUDA, S/O LATE GURUSIDDA M. KAMAGOUDA AGED ABOUT 43 YEARS. WORKING AS EXECUTIVE ENGINEER (MECHANICAL),
- 41 HC-KAR
OFFICE OF THE EXECUTIVE ENGINEER (FUCB), KPCL BELLARY THERMAL POWER STATION, KUDITHINI, BELLARY DISTRICT-583152. 12.
SRI. MANJUNATHA J. HUDED, S/O JAMBUNATH HUDED, AGED ABOUT 46 YEARS. WORKING AS EXECUTIVE ENGINEER (MACHANICAL) OFFICE OF THE EXXECUTIVE ENGINEER. (BOILER AND MAINTENANCE), KPCL.. BELLARY THERMAL POWER STATION, KUDITHINI, BELLARY DISTRICT - 583 152.
13.
SRI. RAVI KUMAR D J S/O JAGADISHAPPA AGED ABOUT 43 YEARS WORKING AS EXECUTIVE ENGINEER (MECHANICAL) OFFICE OF THE EXECUTIVE ENGINEER (BOILER MAINTENANCE) KPCL BELLARY THERMAL POWER STATION, KUDITHINI, BELLARY DISTRICT - 583 152.
14.
SRI. SUNIL V YADAHALLI S/O LATE V YADAHALLI AGED ABOUT 32 YEARS WORKING AS ASISTANT EXECUTIVE ENGINEER (COAL HANDLING PLANT) M I , KPCL BELLARY THERMAL POWER STATION, KUDITHINI, BELLARY DISTRICT - 583 152. SMT. CHAITRA P M. W/O SUNIL V YADAHALLI AGED ABOUT 32 YEARS WORKING AS ASSISTANT EXECUTIVE ENGINEEER (ELECTRICAL) OFFICE OF THE EXECUTIVE ENGINEER (OUTLYING AREA), ELECTRICAL , KPCL BELLARY THERMAL POWER STATION, KUDITHINI, BELLARY DISTRICT - 583 152.
15.
16.
SRI. GOVINDAPPA JARALI
- 42 HC-KAR
17.
S/O MALAPPA JARALI AGED ABOUT 46 YEARS WORKING AS EXECUTIVE ENGINEEER (MECHANICAL) OFFICE OF THE SUPERINTENDING ENGINEER (ELECTRICAL) KPCL ALAMATTI DAM POWER HOUSE BAGALKOT DISTRICT - 587 207 SRI. GANAPATHI WADDAR, S/O. SHANKAR, AGED ABOUT 39 YEARS. WORKING AS ASSISTANT EXECUTIVE ENGINER (CIVIL), OFFICE OF THE EXECUTIVE ENGINEER (CIVIL), NAGAJARI DAM AND POWER HOUSE DIVISION, KPCL, AMBIKANAGAR UTTARAKANNADA DISTRICT-581 363
18.
SRI. VASUDEVA MURTHY, SO JAYADEVAIAH, AGED ABOUT 40 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER (MACHANICAL) OFFICE OF THE EXECUTIVE ENGINEER. (COAL HANDLING PLANT) M-2, KPCL RAICHUR THERMAL POWER SLALION, RAICHUR DISTRICT - 584 170.
19.
SRI. RUPESHA D.. S/O. DODDARAMAIAH. AGED ABOUT 35 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER, (MACHANICAL), OFFICE OF THE EXECUTIVE ENGINEER. (COAL HANDLING PLANT) M-2, KPCL. RAICHUR THERMAL POWER STATION. RAICHUR DISTRICT-584 170.
20.
SRI DEEKSHITH G.P.. S/O. PALAKSHA G. AGED ABOUT 36 YEARS,
- 43 HC-KAR
WORKING AS ASSISTANT ENGINES (ELECTRICAL), OFFICE OF THE EXECUTIVE ENGINEER (ELECTRICAL MAINTENANCE OF OPERATIONS) SHEVA, KPCL. SHIVA HYDRO ELECTRIC STATION (SHIVA) SHIVA SAMUDRAM MANDYA DISTRICT-571430. 21.
SRI RAMESH T.N, S/O. NANJAPPA SHOLLY AGED ABOUT 52 YEARS WORKING AS EXECUTIVE ENGINEER (CIVIL), OFFICE OF THE EXECUTIVE ENGINEER (CIVIL) SHIVA HYDRO ELECTRIC STATION (SHIVA) SHIVA SAMUDRAM, MANDYA DISTRICT-571 430. RESPONDENT NO. 7 TO 21 ARE IMPLEADED AS PER COURT ORDER DATED 04.08.2026 IN I.A. NO. 2/2026.
22.
SRI. H E ABHILASH S/O S. EREGOWDA AGED ABOUT 36 YEARS. WORKING AS ASSISTANT EXECUTIVE ENGINEER. (MACHANICAL) OFFICE OF THE EXECUTIVE ENGINEER (MSP) KPCL, ADMIN BLOCK. JOGFALLS. SHIVAMOGGA DISTRICT- 577 435.
23.
SRI YATHEESH KUMAR, B.E, S/O ESHWARAPPA D., AGED ABOUT 46 YEARS. WORKING AS EXECUTIVE ENGINEER (MACHANICAL) OFFICE OF THE EXECUTIVE ENGINEER (MM) (MGHB), KPCL. JOGFALLS. SHIVAMOGGA DISTRICT - 577 435.
24.
SRI. CHAITHANYA G., S/O GOPALA GOWODA. AGED ABOUT 37 YEARS, WORKING AS ARSSISTANT EXECUTIVE ENGINEER, (MACHANICAL),
- 44 HC-KAR
OFFICE OF THE EXECUTIVE ENGINEER (MM) MGHE KP JOGFALLS, SHIVAMOGGA DISTRICT-477 435 25.
SRI BALAKRISHNA SHASTRY S. S/O SREENIVASACHAR, AGED ABOUT 49 YEARS, WORKING AS EXECUTIVE ENGINEER (ELECTRICAL), OFFICE OF THE EXECUTIVE ENGINEER (OPERATION AND MAINTENANCE) MANI, KPCL, MASTHIKATTE, SHIVAMOGGA DISTRICT -577 425.
26.
SRI. SHASHIDHARA SHETTY, S/O. SHEKAR SHELLY. AGED ABOUT 38 YEARS WORKING AS ASSISTANT EXECUTIVE ENGINEER (ELECTRICAL), OFFICE OF THE EXECUTIVE ENGINEER (OPERATION AND MAINTENANCE) MANI, KPCL MASTHIKATTE SHIVAMOGGA DISTRICT - 577 425.
27.
SRI. VINAYAK KUMAR K., S/O K.S. KRISHNAPPA GOWDA, AGED ABOUT 43 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER. (MACHANICAL) OFFICE OF THE EXECUTIVE ENGINEER (GATES), SHARAVATHI, KPCL., KARGAL SHIVAMOGGA DISTRICT - 577 121.
28.
SRI SHARANAPPA KAMATAR, S/O VEERAPPA P. KAMATĀR, AGED ABOUT 38 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER. (MACHANICAL) OFFICE OF THE EXECUTIVE ENGINEER. (OPERATION AND MAINTENANCE), KPCL., ALAMATTI DAM POWER HOUSE, BAGALKOT DISTRICT - 587 207.
- 45 HC-KAR
29.
SRI AVINASH KANCHAGAR, S/O. SUBHASHCHANDRA, AGED ABOUT 36 YEARS WORKING AS ASSISTANT ENGINEER (MACHANICAL) OFFICE OF THE EXECUTIVE ENGINEER (OPERATION & MAINTENANCE), KPCL, ALAMATTI DAM POWER HOUSE, BAGALKOT DISTRICT-587 207.
30.
SRI MANJUNATHA R. NESAR, S/O. RAMAPPA AGED ABOUT 35 YEARS WORKING AS ASSISTANT EXECUTIVE ENGINEER, (MECHANICAL), OFFICE OF THE EXECUTIVE ENGINEER. (OPERATION & MAINTENANCE), KPCL... ALAMATTI DAM POWER HOUSE, BAGALKOT DISTRICT - 587 207.
31.
SRI. SANTHOSH PUJARI. S/O VISHNU PUJARI. AGED ABOUT 36 YEARS, WORKING AS ASSISTANT ENGINEER (MECHANICAL) OFFICE OF THE EXECUTIVE ENGINEER (OPERATION & MAINTENANCE), KPCL, GHATAPRABHA DAM POWER HOUSE, HIDAKAL, DAM, BELAGAVI DISTRICT - 591 107.
32.
SRI. SUNIL BAGALKOT. S/O SUSHILENDRA BAGALKOT AGED ABOUT 38 YEARS, WORKING AS ASSISTANT EXECUTIVE ENGINEER. (MACHANICAL), OFFICE OF THE EXECUTIVE ENGINEER (OPERATION AND MAINTENANCE) KPCL GHATAPRABHA DAM POWER HOUSE HIDKAL DAM BELAGAVI DISTRICT - 591 107
33.
SRI. SWAROOP M H S/O HAMPANNA A K
- 46 HC-KAR
34.
AGED ABOUT 35 YEARS WORKING AS ASSISTANT EXECUTIVE ENGINEER (ELECTRICAL) OFFICE OF THE SUPERINTENDING ENGINEER (OPERATION) KPCL, YERMARUS, THERMAL POWER STATION RAICHUR DISTRICT - 584 101 SRI. RENUKARAJ SAVANT S/O PRAKASH AGED ABOUT 36 YEARS WORKING AS ASSISTANT EXECUTIVE ENGINEER (MECHANICAL) A - NPH OFFICE OF THE EXECUTIVE ENGINEER (MSP) KPCL AMBIKANAGAR UTTARA KANNADA DISTRICT - 581 363
35.
SRI. ADARSHA P S/O PRASANNA P AGED ABOUT 33 YEARS OFFICE OF THE EXECUTIVE ENGINEER (ELECTRICAL) WORKING AS ASSISTANT ENGINEER (ELECTRICALS) (OPERATION AND MAINTENANCE) BHADRA, KPCL BHADRA GENERATING STATION BHADRAVATHI , SHIVAMOGGA DISTRICT - 577 115
36.
SRI. SATHYANARAYANA SHARMA H R S/O RAGHAVENDRA H G AGED ABOUT 42 YEARS WORKING AS EXECUTIVE ENGINEER (MECHANICAL) TRANSIT OFFICE, KPCL NEW DELHI - 110 049 RESPONDENT NO.22 TO 36 ARE IMPLEADED AS PER THE COURT ORDER DATED 04.08.2026 ON I.A. NO.3/2026. ...RESPONDENTS
(BY SRI. SHASHI KIRAN SHETTY, SR. COUNSEL FOR SRI. AJAY J NANDALIKE., ADVOCATE
- 47 HC-KAR
SMT. SANJANA S JAIN & RACHEL RAJU ALICE, ADVOCATES FOR R1 TO R3 SRI. M SUBRAMANYA BHAT, ADVOCATE FOR R4 TO R6 SRI. M.S. BHAGWAT, SR, COUNSEL FOR ADITHYA R CHAKRAGIRI & KAVITHA G BHAGWAT, ADVOCATES FOR R7 TO R21 SMT. SUVARNA M L, ADVOCATE FOR R22 TO R36) THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND 227 OF THE CONSTITUTION OF INDIA PRAYING TO QUASH THE PROVISIONAL REVISED SENIORITY LIST-2 IN NO.A1P1A/2449 DTD. 01.12.2025 ISSUED BY THE R-1 KARNATAKA POWER CORPORATION LIMITED VIDE ANNX-A IN SO FAR AS THE PETITIONERS ARE CONCERNED (I-A) IS INSERTED
VIDE
COURT
ORDER
DATED
04.08.2026,
AMENDED PORTION IS SEPERATELY FILED.
DIRECT THE R-1 KPCL TO RETAIN THE PROVISIONAL REVISED
SENIORITY
LIST
IN
NO.
A1P1A/1661
DTD.
01.09.2025 AND ISSUE FINAL SENIORITY LIST IN TERMS OF THE SAID PROVISIONAL REVISED SENIORITY LIST NO. A1P1A/1661 DTD. 01.09.2025 VIDE ANNX-G.
THESE PETITIONS, HAVING BEEN HEARD AND RESERVED ON 20.08.2026, COMING ON FOR PRONOUNCMENT OF ORDER, THIS DAY, ORDER WAS PRONOUNCED THEREIN AS UNDER: CORAM: HON'BLE MR. JUSTICE ASHOK S.KINAGI
- 48 HC-KAR
CAV JUDGMENT [COMMON ORDER]
1.
These writ petitions are filed by the petitioners being aggrieved by the provisional revised seniority list-II dated 01.12.2025 vide Annexure-A in both writ petitions and the final seniority list dated 12.06.2026 issued
by
the
respondent
–
Karnataka
Power
Corporation Limited (for short, ‘the KPCL’) vide Annexure-P in W.P.No.3603 of 2026. 2.
Since these two writ petitions arise out of the same controversy concerning the fixation of seniority in the cadre of Assistant Engineers in the KPCL and involve common questions, they are taken together for disposal through common order.
3.
Brief facts, leading rise to the filing of these writ petitions are as follows:
- 49 HC-KAR
In WP No.3603 of 2026: 4.
It is the case of the petitioners that the petitioners have been appointed on compassionate grounds under
the
Scheme
dated
14.05.2003
and
subsequently, elevated to the post of Asst. Engineer as
per
SR.62
based
on
their
educational
qualifications. It is contended that according to Rule 62, there can be elevation based on educational qualification. It is contended that on 20.04.2003 Tripartite agreement was entered into under Sections 12(3) and 18(3) of the Industrial Disputes Act, 1947 between Respondent No 2 employees union and the labour
department.
14.05.2003,
new
It
is
contended
compassionate
that
on
appointment
schemes were introduced by the KPCL, according to which only the persons with requisite qualification would
be
appointment
appointed
under
compassionate
scheme. Thereafter, the
petitioners
herein were appointed as helpers on compassionate
- 50 HC-KAR
ground and further, as per SR.62 they were elevated as Asst. Engineers and now they are working in different posts at the KPCL. 5.
It
is
contended
that,
thereafter,
some
of
the
employees of the KPCL have filed the writ petition in W.P. No.11925 of 2012 challenging the 3 year additional service benefit given to certain Junior Engineers transferred to the post of Asst. Engineers. The said writ petition came to be disposed of vide order dated 04.12.2024. It was observed therein that for implementation of the elevation scheme, a Junior Engineer shall have a minimum qualifying service in the post before being promoted to the post of Assistant Engineer. Further, in cases of appointment by
transfer
Engineers
or
under
promoted
a to
ladder the
scheme,
post
of
Junior
Assistant
Engineers were to be placed below directly recruited Assistant Engineers based upon their respective dates of entry into service.
- 51 HC-KAR
6.
Being aggrieved, the KPCL assailed the same in writ appeal in W.A. No.548 of 2025 and connected matters. However, same came to be dismissed on 13.11.2025
the
confirming
the
order
dated
04.12.2024. 7.
Pursuant to the judgment dated 04.12.2024, the KPCL issued the Provisional Seniority List dated 01.09.2025 bearing No.A1P1A/1661. According to the petitioners, the said list removed the benefit of one-third weightage for purposes of seniority and placed the Assistant Engineers who had entered the cadre through the Elevation Scheme below directly recruited Assistant Engineers with reference to their actual dates of entry into the Assistant Engineer cadre. Thereafter, upon receipt of objections, the KPCL
issued
Seniority
the
List-II
No.A1P1A/2449.
impugned dated
Provisional
Revised
01.12.2025
bearing
- 52 HC-KAR
8.
The petitioners resisted the same by filing their objection.
The
petitioners
contend
that
while
undertaking the exercise pursuant to the aforesaid judgments, the KPCL has gone beyond what was directed by this Court by retrospectively applying a five-year minimum qualifying service requirement to employees who had already been elevated to the post of Assistant Engineer under
the Elevation
Scheme. However, being affected by the inaction on the part of KPCL, the petitioners have filed the instant petitions. In W.P. No.38357 of 2025: 9.
The petitioners are all employees of the KPCL, who were initially appointed as Junior Engineers (JE) since the year 2003-04 having qualification of Engineering Degree and some of them had acquired Engineering Degree during their tenure while working as Junior Engineers appointed with qualification of Diploma,
- 53 HC-KAR
which was the basic qualification to get recruited for the post of Junior Engineer. 10.
The petitioners, being the Employees of the KPCL, are governed under the provisions of the Karnataka Power Corporation Limited Services (Cadre, Recruitment, Seniority)
Probation,
Rules,
1997.
Promotion The
petitioners
and are
concerned with the Standing Rules bearing No.SR062 dated 04.03.2003 under which a provision is made to elevate the Junior Engineers to higher position of Assistant
Engineers
on
possessing
or
acquiring
Engineering Degree qualification, however, they will be placed below the Assistant Engineers who were directly recruited. 11.
Under
the
aforesaid
Scheme,
the
employees
appointed as Junior Engineers with qualification of Engineering Degree will be elevated as Assistant Engineers
by
calling
applications
for
such
- 54 HC-KAR
appointments.
Under
the
said
Recruitment
Notifications, the KPCL has not fixed any minimum service
for
elevation.
However,
while
issuing
Recruitment Notification commencing from the year 2014 i.e., in the Notification dated 01.12.2014, the 1st respondent - KPCL has made a provision to consider the minimum service under the Head Probation/Minimum service/Postings, to the effect that "if the candidate possessing higher qualification than the prescribed qualification are recruited, their claim for higher post based on higher qualification will not be considered till completion of 05 years of service",
whereas,
in
the
Notification
dated
03.08.2017, the KPCL has made a provision to consider the minimum service under the Head Probation/Minimum service/Postings, to the effect that "the candidates selected for the post of Junior Engineers and Chemical Supervisors who possess higher qualification than the prescribed qualification,
- 55 HC-KAR
their claim for higher post will not be considered for elevation under the elevation scheme upto 05 years as per existing C & R Rules", i.e., the KPCL used to elevate the employees who were serving as Junior Engineers with higher qualification suitable to the post of Assistant Engineers after completion of their probationary
period
scheme
per
as
by
applying
Standing
Rule
the
elevation
SR062
dated
04.03.2003, by recruiting them in the post of Assistant Engineers, however, their seniority would be below the employees who were directly recruited as on the date of their elevation. There are several orders of such nature being passed by the KPCL at different intervals as and when recruitments are made for different cadres from 2004 onwards. 12.
The petitioners are the employees who were elevated as Assistant Engineers at different intervals since 2004-05, a tabulation form showing the date of entry into service as Junior Engineer, date of entry as
- 56 HC-KAR
Assistant Engineer by elevation as per Elevation Scheme under SR062 referred above and subsequent changes made are annexed to the petitions. Hence, prays to allow the writ petitions. 13.
Respondent/KPCL has filed its objections denying the averments made in the writ petitions and raised several other grounds seeking the dismissal of the writ petitions.
14.
It is contended by the respondents that the KPCL had introduced a scheme “Elevation of employees to higher
position
tasking/ITI/Engineer
of
acquiring
diploma/
qualification”. According
to
Engineer
which, an
multidegree employee
possessing requisite higher qualification could be elevated to the post of Junior Engineer / Assistant Engineer. The seniority of such employees, who were elevated
was
fixed
by
virtue
of
Annexure
A.
Therefore, the writ petitions assailing the provisional
- 57 HC-KAR
list would become premature. It is contended that the KPCL
has rightly implemented the
scheme
uniformly across the KPCL. It is contended that even before the respondents could act on the objections submitted by the petitioners and other employees, the petitioners have filed these writ petitions. It is contended that the instant petitions is nothing but an attempt
to
seek review
of
the
order
in
W.P.
No.11925 of 2012. Accordingly, prays to dismiss the writ petitions. 15.
Heard Sri. M.R.Rajapogal, learned Senior Counsel and
Sri.Vikram
Huilgol,
learned
Senior
Counsel
appearing for the petitioners and Sri.Shashikiran Shetty,
Learned
Advocate
general
for
the
respondents-State. 16.
Learned Senior Counsels for the petitioners would submit that there was no occasion for the KPCL to revise the seniority list dated 01.09.2025. The
- 58 HC-KAR
second provisional list is without any rationale and basis. It is submitted that the scope of order passed in W.P. No.11925 of 2012 dated 04.12.2024 is limited to the issue of seniority and confined to Junior Engineers and Assistant Engineers only and by no amount of imagination, it could be stretched beyond that. It is submitted that the case of the petitioners falls completely outside the scope of the order passed in writ petition and the writ appeals. It is submitted that the order in W.P. No.11925 of 2012 protects the interest of the employees who were elevated like petitioners and the said order being confirmed in W.A. No.548 of 2025, the Assistant Engineers who had already assumed the office by virtue of previous orders prior to 2014-15, are required
to
be
protected
by
not
applying
the
minimum service of 5 years before assuming the post of Assistant Engineers. There is no direction in any of the decisions of this Court as to fix the
- 59 HC-KAR
minimum
service
of
years
for
elevation
retrospectively. It is submitted that the petitioners possess Bachelor of Engineering much before they were appointed under the compassionate ground. It is submitted that the act of the respondents in making
changes
to
the
seniority
list
and
implementing it retrospectively violates fundamental rights of the petitioners. He submits that it is settled principle that the change in service conditions has to be applied prospectively and cannot be applied retrospectively to the disadvantage of the employees who
have
already
been
elevated
under
valid
applicable Rules as on the date of their elevation. Accordingly, on these grounds, prays to allow the writ petitions. 17.
Sri.M.S.Bhagwat, learned Senior Counsel, appearing for the other petitioners submits that the petitioners were recruited as Junior Engineers and served as Junior Engineers for more than 8 years before being
- 60 HC-KAR
transferred
to
the
cadre
of
Assistant
Engineer
through appointment by transfer in the KPCL on different dates. Upon completion of their graduation, petitioner Nos.1 to 125 were appointed as Junior Engineers
on
different
dates
and
promoted
to
Assistant Engineers after 1 year of service by respondent No.1 by fixing a minimum 5 years service for Elevation Scheme of Assistant Engineers i.e., petitioner Nos.1 to 25. Objections filed by respondent No.4 comparing himself with the direct recruit i.e., Mahesh B. (i.e., Token No.2610) and by respondent No.5
comparing
himself
with
the
direct recruit
Mahesh M. (i.e., Token No.2479). 18.
He also submits that respondent Nos.4 to 6 filed objections questioning the final seniority list dated 12.06.2026, on the ground that the date of entry into Assistant Engineer cadre has been altered without any basis, that service weightage has not been considered while determining the eligibility for
- 61 HC-KAR
the next promotion to the post of Assistant Executive Engineer, contrary to the directions issued in W.P. No.11925 of 2012. 19.
The final seniority list vide Annexure – L was published
pursuant
No.11925 of 2012.
to
the
judgment
in
W.P.
The Co-ordinate Bench has
directed respondent No.1 to (a) review all such promotions in the light of K.Narayanan and others and
P.Sudhakar
Rao
and
others;
(b)
1/3rd
weightage of past service in the post of Junior Engineer to be given for the limited purpose of eligibility
to
the
next
promotion
of
Assistant
Executive Engineer; (c) Minimum qualifying Junior Engineer service before promotion under Elevation Scheme shall be fixed to Elevation of Engineers. 20.
He also submits that the Co-ordinate Bench has not issued any direction to alter the date of transfer of Junior Engineer to Assistant Engineer. The directions
- 62 HC-KAR
were confined to revisiting the seniority based on the date of entry into Assistant Engineer cadre and 1/3rd weightage of Junior Engineer service for eligibility to promotion as Assistant Executive Engineer was not obliterated. The change of entry date of respondent Nos.4,
and
in
the
final
seniority
list
is
unsustainable and amounts to overreach of the order passed in W.P. No.11925 of 2012. 21.
He submits that flaw in the seniority list is the absence
of
clarity
on
service
weightage
of
Appointment By Transfer (ABT) / Assistant Engineers as an eligibility criteria as recognized in the cases of K.Narayanan and others v. State of Karnataka and others and P.Sudhakar Rao and others v. U.Govinda Rao, which is applied in W.P. No.11925 of 2012. 22.
The KPCL has in fact allowed 1/3rd service weightage as eligibility for Assistant Engineer promotion to
- 63 HC-KAR
certain Appointment By Transfer (ABT) candidates but denied the same to respondent Nos.4, 5 and 6. Hence, he submitted that respondent Nos.4, 5 and 6 prays to reject the claim of the petitioners in relation to final seniority list as per Annexure-L and quash the final seniority list to the extent the same relates to ranking assigned to respondent Nos.4, 5 and 6, and direct respondent No.1 to correct the date of entry of respondent Nos.4
to 6 into
Assistant
Engineer cadre as on the date of graduation. 23.
Per contra, Sri.Shashikiran Shetty, learned Senior counsel for the KPCL submits that the impugned exercise is in implementation of the judgment dated 04.12.2024 as affirmed by the Division Bench. He submits that paragraph 20(c) of the judgment expressly requires minimum qualifying service before elevation to the post of Assistant Engineer and that the five-year period is supported by SR-044 dated 31.03.1992
and
the
subsequent
recruitment
- 64 HC-KAR
notifications. He submits that unless the five-year requirement is applied, employees elevated under the Elevation Scheme would obtain an advantage over other employees who were required to render the prescribed qualifying service before promotion. He therefore submits that the petitioners are, in substance, seeking to reopen issues which already stand concluded by the judgment dated 04.12.2024 and the judgment of the Division Bench dated 13.11.2025. Further, he also submits that since the provisional seniority list is in question, the petitions would become premature. Accordingly, on these grounds, prays to dismiss the writ petitions. 24.
The authorities and the relevant paragraphs therein relied
upon
by
the
learned
counsels
for
respective parties are extracted as follows: A.
Learned
Senior
Counsel,
Sri.Rajagopal,
appearing for the petitioners in W.P. No.3603 of
the
- 65 HC-KAR
2026 has relied upon the following decisions of the Hon’ble Apex Court: (a)
C.Navaneeshwara Reddy v. Government of Andhra Pradesh and others- (1998) 3 SCC 240 [paragraph Nos.6, 7]: “6. We find force in the argument of the learned counsel appearing for the contesting unofficial respondents in all these appeals and without going into the correctness or otherwise of the reasons given by the Tribunal for quashing the impugned GO, we are satisfied from a careful reading
of
the
impugned
GO
that
the
Government have not applied its mind before rejecting the objections raised by the contesting unofficial respondents. As a matter of fact, the objections, raising points both on law and on facts, were dealt with by the Government in the impugned GO by observing as follows: “In view of the above position, the Government see no reason to uphold the objections raised by the affected persons and hereby reject them as untenable.” 7.
Beyond
this,
there
was
no
discussion
regarding the objections raised by the contesting unofficial
respondents.
Therefore,
we
find
- 66 HC-KAR
substance in the argument of the learned counsel for
the
contesting
unofficial
respondents.
Accordingly, we confirm the judgment and order of the Tribunal challenged in these appeals. We direct the Government to take further steps in the light of the directions given by the Tribunal within a period of four months and in the meanwhile
the
appellant's
promotion
shall
not
be
seniority
disturbed
till
and the
Government passes orders in the light of the directions given by the Tribunal. The appeals are accordingly dismissed. However, there will be no order as to costs.” (b)
K.Narayan and others v. State of Karnataka and others – (1994) Supp. (1) SCC 44 [Paragraph No.7]: “7.
Rules
operate
prospectively.
Retrospectivity is an exception. Even where the statute permits framing of rule with retrospective effect the exercise of power must not operate discriminately or in violation of any constitutional right so as to affect vested right. The rule-making authority should not be permitted normally to act in the past. The impugned rule made in 1985 permitting
- 67 HC-KAR
appointment
by
transfer
and
making
it
operative from 1976 subject to availability of vacancy in effect results in appointing a Junior Engineer in 1986 with effect from 1976. Retrospectivity of the rules is a camouflage for appointment of Junior Engineers from a back date. In our opinion the rule operates viciously against all those Assistant Engineers who were appointed between 1976 to 1985. In Ex-Capt. K.C. Arora v. State of Haryana [(1984) 3 SCC 281 : 1984 SCC (L&S) 520] and P.D. Aggarwal v. State of U.P. [(1987) 3 SCC 622 : 1987 SCC (L&S) 310 : (1987) 4 ATC 272] it was held by this Court that the President or Governor cannot make such retrospective rules under Article 309 of the Constitution as contravene Articles 14, 16 or 311 and affect vested right of an employee. Even in B.S. Yadav v. State of Haryana [1980 Supp SCC 524 : 1981 SCC (L&S) 343 : (1981) 1 SCR 1024] where the power to frame rules retrospectively was upheld it was observed: (SCC p. 557, para 76) “Since the Governor exercises a legislative power under the proviso to Article 309 of the Constitution, it is open to him to give retrospective operation to the
- 68 HC-KAR
rules made under that provision. But the date from which the rules are made to operate must be shown to bear, either from the face of the rules or by extrinsic evidence, reasonable nexus with the provisions contained in the rules, especially when the retrospective effect extends over a long period as in this case.” As seen earlier there is no nexus between framing a rule permitting appointment by transfer and making it retrospective with effect from 1976. Appointing a person to a higher post in a different cadre in which he has never worked is violative of constitutional guarantee of those who are working in the cadre.
It
is
against
basic
principle
of
recruitment to any service. (c)
Ajay Kumar Shukla and others v. Arvind Rai and others – (2022) 12 SCC 579 [Paragraph Nos.23, 40, 42, 44]: 23. The appointing authority, in fact, committed an error in the manner in which the seniority list was prepared by placing the three select lists forwarded by the Commission on different dates one after the other en bloc as per the date of receipt of three select lists. It is not the case either of the private respondents, the State or
- 69 HC-KAR
the Commission that appointment letters have been issued separately as and when the select lists were received. In fact, the appointment letters of all the three streams were issued in October 2001, after about 10 to 11 months of the receipt of the third list i.e. of the Civil stream in November 2000. Apparently by an oversight, the appointing authority failed to prepare the combined seniority list as required under the 1991 Seniority Rules, be it Rule 5 or Rule 8 with respect to the selection of the appellants and private respondents. xxx 40. It is also admitted by the parties that the next promotion of Junior Engineers in the higher grade is to the post of Assistant Engineer. In the cadre
of
Assistant
Engineer,
there
are
no
separate streams but only one cadre of Assistant Engineers. It is the seniority list of the cadre of Junior Engineers which would be the feeder cadre for the post of Assistant Engineers. The Junior Engineers of Agricultural stream of the selection of the year 2001, would have direct march over the Junior Engineers selected in the same selection of the Mechanical and Civil streams, even though the overall merit of some or many of Agricultural stream Junior Engineers
- 70 HC-KAR
could be lower than some or many of the Engineers of the Mechanical and Civil streams. The appointing authority ought to have prepared a
combined
merit
list
based
upon
the
performance or the proficiency on the basis of the marks received in the selection test as prepared by the Commission. Otherwise, it would amount to denial of the right of consideration for promotion to a more meritorious candidate as against a candidate having lesser merit. Right to promotion is not considered to be a fundamental right but consideration for promotion has now been evolved as a fundamental right. xxx 42. A Constitution Bench in Ajit Singh (2) v. State of Punjab [Ajit Singh (2) v. State of Punjab, (1999) 7 SCC 209 : 1999 SCC (L&S) 1239] , laying emphasis on Article 14 and Article 16(1) of the Constitution of India held that if a person who
satisfies the
eligibility
and the
criteria for promotion but still is not considered for promotion, then there will be clear violation of his/her's fundamental right. Jagannadha Rao, J.
speaking
Venkataswami,
for
himself Pattanaik,
and
Anand,
C.J.,
Kurdukar,
JJ.,
observed the same as follows in paras 22 and 27 : (SCC pp. 227-28)
- 71 HC-KAR
“Articles 14 and 16(1) : is right to be considered for promotion a fundamental right 22. Article 14 and Article 16(1) are closely connected. They deal with individual rights of the person. Article 14 demands that the ‘State shall not deny to any person equality before the law or the equal protection of the laws’. Article 16(1) issues a positive command that: ‘there shall be equality of opportunity for all citizens in matters relating to employment or appointment to any office under the State’. It has been held repeatedly by this Court that clause (1) of Article 16 is a facet of Article 14 and that it takes its roots from Article 14. The said clause particularises the generality in Article 14 and identifies, in a constitutional sense “equality of opportunity” in matters of employment and appointment to any office under the State. The word “employment” being wider, there is no dispute that it takes within its fold, the aspect of promotions to posts above the stage of initial level of recruitment. Article 16(1) provides to every employee otherwise eligible for promotion or who comes within the zone of consideration, a fundamental right to be “considered” for promotion. Equal opportunity here means the right to be “considered” for promotion. If a person satisfies the eligibility and zone criteria but is not considered for promotion, then there will be a clear infraction of his fundamental right to be “considered” for promotion, which is his personal right. “Promotion” based on equal opportunity and seniority attached to such promotion are facets of fundamental right under Article 16(1) ***
- 72 HC-KAR
27. In our opinion, the above view expressed in Ashok Kumar Gupta [Ashok Kumar Gupta v. State of U.P., (1997) 5 SCC 201 : 1997 SCC (L&S) 1299] and followed in Jagdish Lal [Jagdish Lal v. State of Haryana, (1997) 6 SCC 538 : 1997 SCC (L&S) 1550] and other cases, if it is intended to lay down that the right guaranteed to employees for being “considered” for promotion according to relevant rules of recruitment by promotion (i.e. whether on the basis of seniority or merit) is only a statutory right and not a fundamental right, we cannot accept the proposition. We have already stated earlier that the right to equal opportunity in the matter of promotion in the sense of a right to be “considered” for promotion is indeed a fundamental right guaranteed under Article 16(1) and this has never been doubted in any other case before Ashok Kumar Gupta [Ashok Kumar Gupta v. State of U.P., (1997) 5 SCC 201 : 1997 SCC (L&S) 1299] right from 1950.” (emphasis in original) 44. If the seniority list is allowed to be sustained then the Engineers who are more meritorious in the Mechanical and Civil streams than the Junior Engineers of the Agricultural stream would be deprived of their right of being considered for promotion and in fact their right would accrue only
after
Agricultural selection
all
the
stream
are
Junior
Engineers
selected
granted
of
the
in
the
same
promotion.
For
these
- 73 HC-KAR
reasons also the seniority list in question must go.
(d)
P.Sudhakar Rao and others v. I.Govinda Rao
and
others,
(2013)
SCC
693,
[paragraph Nos.44, 45, 46, 50 and 51]: “Answering the questions 44. As far as the impact of the retrospective operation
of
the
executive
instructions
or
statutory rules on the seniority of employees is concerned (including the Junior Engineers before us), this issue is now settled by a few recent decisions of this Court. There is no doubt that retrospective operation can be given to statutory rules such as the Andhra Pradesh Engineering Service Rules. But, the retroactivity must still meet the test of Article 14 and Article 16 of the Constitution and must not adversely trench upon the entitlement of seniority of others. 45. Without intending to multiply precedents on this subject, reference may be made to a decision rendered by this Court more than two decades ago. In State of Bihar v. Akhouri Sachindra Nath [1991 Supp (1) SCC 334 : 1991 SCC (L&S) 1070 : (1991) 16 ATC 936] it was held that retrospective seniority cannot be given
- 74 HC-KAR
to an employee from a date when he was not even borne in the cadre. So also, seniority cannot be given with retrospective effect so as to adversely
affect
others.
Seniority
amongst
members of the same grade must be counted from the date of their initial entry into the grade. It was held: (SCC pp. 342-43, para 12)
“12. In the instant case, the promotee Respondents 6 to 23 were not born in the cadre of Assistant Engineer in the Bihar Engineering Service, Class II at the time when Respondents 1 to 5 were directly recruited to the post of Assistant Engineer and as such they cannot be given seniority in the service of Assistant Engineers over Respondents 1 to 5. It is well settled that no person can be promoted with retrospective effect from a date when he was not borne in the cadre so as to adversely affect others. It is well settled by several decisions of this Court that amongst members of the same grade seniority is reckoned from the date of their initial entry into the service. In other words, seniority inter se amongst the Assistant Engineers in Bihar Engineering Service, Class II will be considered from the date of the length of service rendered as Assistant Engineers. This being the position in law Respondents 6 to 23 cannot be made senior to Respondents 1 to 5 by the impugned government orders as they entered into the said service by promotion after Respondents 1 to 5 were directly recruited in the quota of direct recruits. The judgment of the High
- 75 HC-KAR
Court quashing the impugned government orders made in Annexures 8, 9 and 10 is unexceptionable.” 46. This decision was cited with approval, a few years ago, along with the decision rendered in Keshav Chandra Joshi v. Union of India [1992 Supp (1) SCC 272 : 1993 SCC (L&S) 694 : (1993) 24 ATC 545] . This Court held that when a quota is provided for, then the seniority of the employee would be reckoned from the date when the vacancy arises in his/her quota and not from any anterior date of promotion or subsequent date of confirmation. It was observed that injustice ought not to be done to one set of employees in order to do justice to another set. It was said in Uttaranchal Forest Rangers' Assn. (Direct Recruit) v. State of U.P. [(2006) 10 SCC 346 : (2007) 1 SCC (L&S) 116] , on referring to these judgments that: (SCC p. 364, paras 37-38) “37. We are also of the view that no retrospective promotion or seniority can be granted from a date when an employee has not even been borne in the cadre so as to adversely affect the direct recruits appointed validly in the meantime, as decided by this Court in Keshav Chandra Joshi v. Union of India [1992 Supp (1) SCC 272 : 1993 SCC (L&S) 694 : (1993) 24 ATC 545] held that when promotion is outside the quota, seniority would be reckoned from the date of the
- 76 HC-KAR
vacancy within the quota rendering the previous service fortuitous. The previous promotion would be regular only from the date of the vacancy within the quota and seniority shall be counted from that date and not from the date of his earlier promotion or subsequent confirmation. In order to do justice to the promotees, it would not be proper to do injustice to the direct recruits. … 38. This Court has consistently held that no retrospective promotion can be granted nor can any seniority be given on retrospective basis from a date when an employee has not even been borne in the cadre particularly when this would adversely affect the direct recruits who have been appointed validly in the meantime.” xxx 50. The facts of the appeals before us show that at least some of the Supervisors were given retrospective seniority on the date when they were not even eligible for appointment as Junior Engineers. The precedents referred to above show that this is impermissible. In addition as pointed out by the High Court, there is no indication
of
the
vacancy
position, that
is,
whether the Supervisors could be adjusted in the grade of Junior Engineers from the date on which they were given notional retrospective seniority. There is also no indication whether the quota of vacancies for Supervisors was adhered to as on
- 77 HC-KAR
the date on which they were given notional retrospective seniority. The case law suggests that this is an important factor to be considered. Finally, it is quite clear that the grant of retrospective seniority to the Supervisors has adversely impacted on the promotion chances of the Junior Engineers by bringing them down in seniority. This too is impermissible. 51. From the various decisions referred to and from the facts of the case, it is clear that to pass the scrutiny of Article 14 of the Constitution, the seniority of the Supervisors should be reckoned only from the date on which they satisfied all the real and objective procedural requirements of the Andhra Pradesh Engineering Service Rules and the law laid down by this Court. This has not happened in the present appeals creating a situation of unreasonableness and unfairness.” (e) The State of Assam and another v. Raghava Rajagopalachari
–
(1972)
SLR
–
[Paragraph No.13]: 13. The learned counsel for the State sought to argue before us that the date ‘16th Match 1954’ occurring in the order dated January 28, 1964, was mentioned due to mistake and the
- 78 HC-KAR
proper
date
which
should
have
been
mentioned was the date of superannuation, namely, June 30, 1953. He says that the order dated July 23 1953 continuing the services of the petitioner after the date of superannuation was bad in view of the ruling of this court in State of Assam v. Padma Ram Borth, AIR 1965 SC 473. But we are unable to appreciate how he is entitled to raise the point. The Writ was brought to challenge this order; No such petition even if it be competent, was filed by the State itself. The respondent to a Writ Petition cannot be allowed to attack its own order as a respondent.
(f) Govind Prasad v. R.G.Prasad and others – (1994) 1 SCC 437 – [paragraph No.11]: 11.
Para
of
the
memorandum
gives
deeming effect — from July 1, 1978 — to the provisions
in
memorandum.
paras
It
settled
is
and
of
the
law
that
an
executive order of the Government cannot be made operative with retrospective effect. It is, thus, clear that the memorandum contained various
proposals
which
were
incorporated in the statutory rules.
to
be
- 79 HC-KAR
B.
Learned counsel Sri.M.Subramanaya Bhat,
appearing for respondent Nos.4 to 6, has relied upon the judgment of the Hon’ble Apex Court in the case of P.Mohan Reddy v. E.A.A. Charles and others, (2001) 4 SCC 433 [paragraph No.17]: “17. A conspectus of the aforesaid decisions of this Court would indicate that even though an employee cannot claim to have a vested right to have a particular position in any grade, but all the same he has the right of his seniority being determined in accordance with the Rules which remained in force at the time when he was borne
in
the
cadre.
The
question
of
re-
determination of the seniority in the cadre on the basis of any amended criteria or rules would arise only when the amendment in question is given a retrospective effect. If the retrospectivity of the Rule is assailed by any person then the court would be entitled to examine the same and decide the matter in accordance with the law. If the retrospectivity of the Rule is ultimately struck
down,
redrawing
of
necessarily the
seniority
the list
question
of
under
the
- 80 HC-KAR
amended provisions would not arise, but if, however, the retrospectivity is upheld by a court then
the
seniority
could
be
redrawn
in
accordance with the amended provisions of the employees who are still in the cadre and not those who have already got promotion to some other cadre by that date. Further, a particular rule of seniority having been considered by the Court and some directions in relation thereto having been given, that direction has to be followed in the matter of drawing up of the seniority list until and unless a valid rule by the rule-making authority comes into existence and requires otherwise, as was done in Bola case [(1997) 8 SCC 522] . It may be further stated that if any rule or administrative instruction mandates
drawing
up
of
seniority
list
or
determination of inter se seniority within any specified period then the same must be adhered to unless any valid reason is indicated for noncompliance with the same.”
C.
Learned
Advocate
General,
Sri.Shashikiran
Shetty appearing for respondent No.1 in W.P. No.3603 of 2026 has relied upon the following authorities:
- 81 HC-KAR
(a)
S.Sarala Vandanam and another v. State of Andhra Pradesh and others – SLP (Civil)
Nos.5843/2018
decided
on
20.01.2022; “The present batch of Special Leave Petitions have been filed assailing the judgment and order of the Division Bench of the High Court impugned dated 31st January, 2018. The Post of Deputy Tehsildar is included in the Schedule
appended
to
the
Andhra
Pradesh
Revenue Subordinate Service Rules (hereinafter being referred to as the “Rules”) and so far as the rules regarding the seniority is concerned, has undergone a change after a spell of time on two or three occasions and that is one of the reason for which the employees working in the cadre of Deputy Tehsildar recruited either as direct recruits/promotees had to question their determination of inter se seniority which has been once assigned by the competent authority. It has come on record that, in the first instance, Rule 4(e) of the Rules came to be amended with retrospective effect from 12th
- 82 HC-KAR
October, 1961 by G.O. dated 1st October, 1980 that came to be examined by this Court in K.V. Subba Rao Vs. Government of Andhra Pradesh (1988) 2 SCC 201 wherein it was held that Rule 4(e) will apply prospectively to those who are appointed after 1st October, 1980. Before the Government would proceed with determination of inter se seniority of direct recruits/promotees
in
the
cadre
of
Deputy
Tehsildar, Rule 4(e) of the Rules was further amended September,
by
G.O.
1992
No.
and
the
dated
ratio
of
24th direct
recruits/promotes undergone a change from 1:1 to 30:70. Thereafter, the final seniority list came to be published of the employees working in the cadre of Deputy Tehsildar on 31st May, 1995, that became the subject matter of challenge earlier before the Andhra Pradesh Administrative Tribunal, which finally travelled to this Court and taking into consideration the past history of the seniority list of Deputy Tehsildar, this Court in the case of P. Mohan Reddy vs. E.A.A. Charles and Others (2001) 4 SCC 433 finally settled and laid down the principles according to which the inter se seniority of direct recruits/promotees
- 83 HC-KAR
in the cadre of Deputy Tehsildar was to be determined. Based on the principles laid down by this Court, the authorities proceeded to finalize the seniority list of the employees working in the cadre of Deputy Tehsildar, but it took almost ten years and final seniority list of Deputy Tehsildar came be published on 6th August, 2010 followed with the seniority list of Tehsildars on 11th November, 2010. Indisputedly, the revised seniority list dated 6th August, 2010 was never the subject matter of challenge. However, the G.O. No. 502, dated 16th September, 2013 came to be challenged by the persons effected and the Division Bench of the High Court, after taking into consideration the whole matrix of the matter and the inter se seniority of the direct recruits/promotees in the cadre of Deputy Tehsildar in particular, and taking note of the scheme of rules and the amendments which were given effect to from time to time, of which a reference has been made, finally arrived to a conclusion that looking to the past history, it would not have been possible to serve an individual notice and once there
was
a
judgment
of
this
Court,
the
authorities were under an obligation to finalize
- 84 HC-KAR
the seniority list of Deputy Tehsildar in terms of the principles laid down and either of the affected parties who approached the High Court failed to question/point out as to what was the error
been
committed
by
the
authority
in
determining the inter se seniority of direct recruits/promotees
in
the
cadre
of
Deputy
Tehsildar. However, the objection was that before there was a revision of seniority list, notice was not served and those who were directly affected, at least, right of opportunity would have been afforded to them. On principles, the High Court also agreed on the submissions made and we do find substance that if there is any revision in the seniority list prejudicial to the interest of the individual employee has been given effect to, opportunity of hearing has to be afforded. But the reason for which it was not possible to follow has been noted by the High Court in paragraph 54 of the judgment and we do find that once the seniority list has been revised of the employees working in the cadre
of
judgment
Deputy
Tehsildar
of
Court
this
pursuant
giving
any
to
the
further
individual notice to the employees will certainly
- 85 HC-KAR
be a useless formality and particularly when either of the affected employee who approached the High Court has failed to justify as to what was the error been committed in regard to his/her placement in the final seniority list published pursuant thereto. We have heard the learned Counsel for the parties for quite some time and taking into consideration the material on record and the series of litigations which has undergone in determining the inter se seniority of direct recruits/promotees
in
the
cadre
of
Deputy
Tehsildar, we find no error has been committed by the High Court in the impugned judgment which may call for our interference and it is high time to put final quietus to this dispute. Consequently,
the
petitions
fail
and
v.
State
of
accordingly dismissed.”
(b)
S.Sarala
Vandanam
Telangana - W.P. No.37770 of 2016 and connected cases, decided on 31.01.2018 –
[Paragraph
No.54]
(High
Court
of
- 86 HC-KAR
Judicature at Hyderabad for the State of Telangana and the State of Andhra Pradesh): “54. Normally we would have agreed with the above
submission.
Whenever
objections
are
invited to a provisional seniority list, it is the duty
of
the
concerned,
to
deal
with
the
objections and provide reasons for overruling the objections. But, in the case on hand, we are unable to apply the said rule in view of (1) the magnitude of the exercise; and (2) the long history of this litigation. As a matter of fact, a Two
Member
Committee
appointed
under
G.O.Ms.No.69 dated 11-02-2016 and an Advisory Panel constituted under G.O.Rt.No.1088 dated 07-1112016 had also gone into the matter. Therefore,
the
non-consideration
of
the
objections of each and every individual and the recording of the reasons for the rejection of every one of them, in a case of this magnitude is not feasible. Moreover the objections are not individualistic.
The
whole
litigation
revolved
around the ratio between direct recruits and promotees and the method of fixation of their inter-se
seniority.
Therefore,
the
contention
regarding the non- consideration of the individual objections, cannot be accepted.”
- 87 HC-KAR
(c)
Sri.R.Rudresh and others v. The State of Karnataka and others – WP No.1482 of 2021 [S-Pro] – decided on 25.01.2021 – by High Court of Karnataka at Bengaluru: “Petitioners are before this Court, challenging the provisional seniority list dated 27.10.2022 of the cadre of Teachers and Principals. 2. The petitioners
said
objections
of
by
way
to
have
filed
their
representations
dated
16.05.2022 and 24.06.2022 vide Annexures-K and L. It is stated that, during the pendency of the writ petition, the provisional seniority list is finalized and final seniority list is published. Learned counsel for the petitioners also would submit that during the pendency of the writ petition, promotions have taken place on the basis of provisional seniority list. 3. During the pendency of the writ petition, final seniority list is published and promotions are said to have been given on the basis of provisional seniority list. Hence, it is open for the petitioners to challenge the final seniority list as also the promotions accorded on the basis of provisional
- 88 HC-KAR
seniority list. No writ would be maintainable challenging the provisional seniority list, since it gives an opportunity to file objection before finalizing such provisional seniority list. 4. With the above, the writ petition stands disposed of, with liberty to the petitioners to challenge the final seniority list as well as promotions given on the basis of provisional seniority list.”
(d)
Sri.Mahadevaswamy and others v. the State of Karantaka and others – in WP No.13988 of 2022 [S-RES] – by High Court of Karnataka at Bengaluru: “The petitioners in this writ petition have called in question a provisional seniority list notified by the second respondents insofar it pertains to the cadre of First Division Assistant. 2. Heard Sri Chandrakanth R. Goulay, learned counsel appearing for petitioners and perused the material on record. 3. It is the submission of learned counsel for petitioners, Sri Chandrakanth R. Goulay, that the petitioners are being shown as seniors in the
- 89 HC-KAR
year 2019, despite their appointment being long before the appointment of the persons who are shown above the petitioners in the provisional seniority list. 4. He further submits that they have filed their objections to the provisional seniority list on 02/03.06.2020, 15.06.2020 and 09.09.2020 and have
approached
this
Court
with
an
apprehension that their objections would not be considered and the petitioners who have been placed below the persons who were appointed later may be considered for further promotions. 5.
The
apprehension
of
the
petitioners
is
unfounded as the respondent - Bruhat Bengaluru Mahanagara Palike is bound to consider the objections as their ranking is brought down in the provisional seniority list. It is also needless to observe that no promotions can be granted in terms
of
the
respondent
–
provisional Bruhat
seniority
Bengaluru
list.
The
Mahanagara
Palike is directed to consider the objections filed by the petitioners to the provisional seniority list and pass appropriate orders in accordance with law. 6. With the above observations, the writ petition is disposed.”
- 90 HC-KAR
E.
Learned Senior Counsel, Sri.M.S.Bhagwat,
appearing for respondent Nos.7 to 21 in W.P. No.38357 of 2025 has relied upon the following judgments of the Hon’ble Apex Court: (a) Aligarh Muslim University and others v. Mansoor Ali Khan – (2000) 7 SCC 529 [paragraph Nos.25 and 26]:
“25. The “useless formality” theory, it must be noted, is an exception. Apart from the class of cases of “admitted or indisputable facts leading only to one conclusion” referred to above, there has been considerable debate on the application of that theory in other cases. The divergent views expressed in regard to this theory have been elaborately considered by this Court in M.C. Mehta [(1999) 6 SCC 237] referred to above. This Court surveyed the views expressed in various judgments in England by Lord Reid, Lord Wilberforce, Lord Woolf,
Lord
Bingham,
Megarry,
J.
and
Straughton, L.J. etc. in various cases and also views expressed by leading writers like Profs. Garner, Craig, de Smith, Wade, D.H. Clark
- 91 HC-KAR
etc. Some of them have said that orders passed in violation must always be quashed for otherwise the court will be prejudging the issue. Some others have said that there is no such absolute rule and prejudice must be shown. Yet, some others have applied via media rules. We do not think it necessary in this case to go deeper into these issues. In the ultimate analysis, it may depend on the facts of a particular case. 26. It will be sufficient, for the purpose of the case of Mr Mansoor Ali Khan to show that his case will fall within the exceptions stated by Chinnappa
Reddy,
J.
in
S.L.
Kapoor
v.
Jagmohan [(1980) 4 SCC 379] , namely, that on the admitted or indisputable facts, only one view is possible. In that event no prejudice can be said to have been caused to Mr Mansoor Ali Khan though notice has not been issued. 27. Our reasons for saying that the case of Mr Mansoor Ali Khan falls within the exception can be stated as follows: Admittedly, leave was sanctioned only for 2 years
from
18-4-1979.
When
before
the
- 92 HC-KAR
expiry of the period, Mr Mansoor Ali Khan applied on 18-4-1981 for extension of leave by 3 more years, the University wrote to him on 17-9-1981/23-9-1981 granting extension only for one year from 18-4-1981 and also stated that he was required to resume duties by 18-4-1982. It did not stop there. It further forewarned Mr.Khan as follows: “Please note that no further extension in the period of your leave will be possible and you are advised to make preparation for resuming duty positively by 18-4-1982.” In other words, he was put on advance notice that it would not be possible to give any further extension i.e. beyond one year on the ground of continuance in the job at Libya and he was to resume duty by 18-4-1982. In fact, thereafter some special consideration was still shown in his favour by way of granting him joining time up to 1-7-1982. It was clearly said that otherwise he would be deemed to have vacated the post. If he had, in spite of this warning, gone ahead by accepting a further contract in Libya, it was, in our view, his own unilateral act in the teeth of the advance warning given. That conduct, the learned Single Judge thought and in our view
- 93 HC-KAR
rightly to be sufficient to deny relief under Article 226.”
(b)
Dharanpal
Satyapal
Limited
v.
Deputy Commissioner of Central Excise, Gauhati and others – (2015) 8 SCC 519 – [Paragraph Nos.42 to 48]: “42. So far so good. However, an important question posed by Mr Sorabjee is as to whether it is open to the authority, which has to take a decision, to dispense with the requirement of the principles of natural justice on
the
ground
that
affording
such
an
opportunity will not make any difference? To put
it
otherwise,
can
the
administrative
authority dispense with the requirement of issuing
notice
by
itself
deciding
that
no
prejudice will be caused to the person against whom the action is contemplated? Answer has to be in the negative. It is not permissible for the authority to jump over the compliance of the principles of natural justice on the ground that even if hearing had been provided it would have served no useful purpose. The opportunity of hearing will serve the purpose or not has to be considered at a later stage and such things cannot be presumed by the
- 94 HC-KAR
authority. This was so held by the English Court way back in the year 1943 in General Medical Council v. Spackman [1943 AC 627 : (1943) 2 All ER 337 (HL)] . This Court also spoke in the same language in Board of High School and Intermediate Education v. Chitra Srivastava [(1970) 1 SCC 121 : AIR 1970 SC 1039] , as is apparent from the following words : (SCC p. 123, para 7) “7. The learned counsel for the appellant, Mr C.B. Agarwala, contends that the facts are not in dispute and it is further clear that no useful purpose would have been served if the Board had served a show-cause notice on the petitioner. He says that in view of these circumstances it was not necessary for the Board to have issued a show-cause notice. We are unable to accept this contention. Whether a duty arises in a particular case to issue a show-cause notice before inflicting a penalty does not depend on the authority's satisfaction that the person to be penalised has no defence but on the nature of the order proposed to be passed.” 43. In view of the aforesaid enunciation of law, Mr Sorabjee may also be right in his submission that it was not open for the authority to dispense with the requirement of principles
of
natural
justice
on
the
- 95 HC-KAR
presumption that no prejudice is going to be caused to the appellant since the judgment in R.C. Tobacco [(2005) 7 SCC 725] had closed all the windows for the appellant. 44. At the same time, it cannot be denied that as far as courts are concerned, they are empowered to consider as to whether any purpose would be served in remanding the case keeping in mind whether any prejudice is caused to the person against whom the action is taken. This was so clarified in ECIL [(1993) 4 SCC 727 : 1993 SCC (L&S) 1184 : (1993) 25 ATC 704] itself in the following words : (SCC p. 758, para 31) “31. Hence, in all cases where the enquiry officer's report is not furnished to the delinquent employee in the disciplinary proceedings, the courts and tribunals should cause the copy of the report to be furnished to the aggrieved employee if he has not already secured it before coming to the court/tribunal and given the employee an opportunity to show how his or her case was prejudiced because of the non-supply of the report. If after hearing the parties, the court/tribunal comes to the conclusion that the non-supply of the report would have made no difference to the ultimate findings and the punishment given, the court/tribunal should not interfere with the order of
- 96 HC-KAR
punishment. The court/tribunal should not mechanically set aside the order of punishment on the ground that the report was not furnished as is regrettably being done at present. The courts should avoid resorting to short cuts. Since it is the courts/tribunals which will apply their judicial mind to the question and give their reasons for setting aside or not setting aside the order of punishment, (and not any internal appellate or revisional authority), there would be neither a breach of the principles of natural justice nor a denial of the reasonable opportunity. It is only if the court/tribunal finds that the furnishing of the report would have made a difference to the result in the case that it should set aside the order of punishment.” 45. Keeping in view the aforesaid principles in mind, even when we find that there is an infraction of principles of natural justice, we have to address a further question as to whether any purpose would be served in remitting the case to the authority to make fresh demand of amount recoverable, only after issuing notice to show cause to the appellant. In the facts of the present case, we find that such an exercise would be totally futile having regard to the law laid down by this Court in R.C. Tobacco [(2005) 7 SCC 725] .
- 97 HC-KAR
46. To recapitulate the events, the appellant was
accorded
certain
benefits
under
the
Notification dated 8-7-1999. This Notification stands nullified by Section 154 of the 2003 Act, which has been given retrospective effect. The
legal
consequence
of
the
aforesaid
statutory provision is that the amount with which the appellant was benefited under the aforesaid
Notification
becomes
refundable.
Even after the notice is issued, the appellant cannot take any plea to retain the said amount on any ground whatsoever as it is bound by the dicta in R.C. Tobacco [(2005) 7 SCC 725] . Likewise, even the officer who passed the order has no choice but to follow the dicta in R.C. Tobacco [(2005) 7 SCC 725] . It is important to note that as far as quantification of the amount is concerned, it is not disputed at all. In such a situation, issuance
of
notice
would
be
an
empty
formality and we are of the firm opinion that the case stands covered by “useless formality theory”. 47. In Escorts Farms Ltd. v. Commr. [(2004) 4 SCC 281] , this Court, while reiterating the position that rules of natural justice are to be
- 98 HC-KAR
followed for doing substantial justice, held that, at the same time, it would be of no use if it amounts to completing a mere ritual of hearing without possibility of any change in the decision of the case on merits. It was so explained in the following terms : (SCC pp. 309-10, para 64) “64. Right of hearing to a necessary party is a valuable right. Denial of such right is serious breach of statutory procedure prescribed and violation of rules of natural justice. In these appeals preferred by the holder of lands and some other transferees, we have found that the terms of government grant did not permit transfers of land without permission of the State as grantor. Remand of cases of a group of transferees who were not heard, would, therefore, be of no legal consequence, more so, when on this legal question all affected parties have got full opportunity of hearing before the High Court and in this appeal before this Court. Rules of natural justice are to be followed for doing substantial justice and not for completing a mere ritual of hearing without possibility of any change in the decision of the case on merits. In view of the legal position explained by us above, we, therefore, refrain from remanding these cases in exercise of our discretionary powers under Article 136 of the Constitution of India.”
- 99 HC-KAR
48. Therefore, on the facts of this case, we are of the opinion that non-issuance of notice before sending communication dated 23-62003 has not resulted in any prejudice to the appellant and it may not be feasible to direct the respondents to take fresh action after issuing notice as that would be a mere formality.”
25.
Perused the records and considered the submissions and the authorities relied upon by the learned counsel for the respective parties.
26.
It is undisputed that the petitioners in W.P. No.3603 of 2026 have been appointed on compassionate grounds under the scheme dated 14.05.2003 and the petitioners in W.P. No.38357 of 2025 joined as Junior Engineers and subsequently elevated to the post next higher post of Asst. Engineer as per SR.62 dated 04.03.2003 under KPCL (Cadre, Recruitment, Probation and Seniority) Rules, 1997 based on their educational qualifications. According to SR062, there can be elevation based on educational qualification.
- 100 HC-KAR
On
20.04.2003,
the
Tripartite
Agreement
was
entered into under Sections 12(3) and 18(3) of the Industrial Disputes Act, 1947 between respondent No.2 Employees’ Union and the Labour Department. On 14.05.2003 new Compassionate Appointment Scheme was introduced by the KPCL, according to which only the persons with requisite qualification would
be
appointed
under
Compassionate
Appointment Scheme. Thereafter, the petitioners herein were appointed as helpers on compassionate ground and further as per SR.62, they were elevated as Asst. Engineers and now, they are working in different posts at the KPCL. Thereafter, some of the employees of the KPCL have filed the writ petition in W.P. No.11925 of 2012 challenging the 3 year additional service benefit given to certain Junior Engineers transferred to the post of Asst. Engineers. The said writ petition came to be disposed of vide order dated 04.12.2024. It was observed therein that
- 101 HC-KAR
for implementation of the elevation scheme, a Junior Engineer shall have a minimum qualifying service in the post before being promoted to the post of Assistant Engineer. Further, in cases of Appointment By Transfer or under a ladder scheme, Junior Engineers
promoted
to
the
post
of
Assistant
Engineers were to be placed below directly recruited Assistant Engineers based upon their respective dates of entry into service. 27.
Being aggrieved, the KPCL assailed the same in writ appeal in W.A. No.548 of 2025 and connected matters. However, same came to be dismissed by confirming the order dated 04.12.2024.
28.
Pursuant to the judgment dated 04.12.2024, the KPCL issued the Provisional Seniority List dated 01.09.2025 bearing No.A1P1A/1661. According to the petitioners, the said list removed the benefit of one-third weightage for purposes of seniority and
- 102 HC-KAR
placed the Assistant Engineers, who had entered the cadre through the Elevation Scheme, below directly recruited Assistant Engineers with reference to their actual dates of entry into the Assistant Engineer cadre. Thereafter, upon receipt of objections, the KPCL
issued
Seniority
the
impugned
List-II
dated
Provisional
Revised
01.12.2025
bearing
No.A1P1A/2449. 29.
The petitioners resisted the same by filing their objections.
Now,
it
is
the
contention
of
the
petitioners that being aggrieved by the inaction on the part of the respondents, they have filed the instant petitions. 30.
Admittedly, paragraph 20(c) of the order dated 04.12.2024
expressly
directs
that,
for
implementation of the Elevation Scheme, a Junior Engineer shall have minimum qualifying service in the post before being promoted to the post of
- 103 HC-KAR
Assistant interfered
Engineer. The with
by
the
said
direction
Division
was not
Bench.
The
controversy, however, lies in the manner in which that direction has been implemented. 31.
The direction to prescribe minimum qualifying service and the retrospective invalidation of an elevation already completed are two different matters. The former concerns the eligibility condition governing elevation under the Scheme. The latter concerns the legal consequence of an elevation which has already taken place pursuant to an order issued by the KPCL and under the service conditions applicable at the relevant time. A third and distinct matter is the fixation of seniority after the employee enters the Assistant Engineer cadre. No employee can claim seniority in the Assistant Engineer cadre from a date anterior to his or her actual entry into that cadre. The Division Bench has affirmed that principle. Equally, the benefit of one-third of past service in the
- 104 HC-KAR
feeder
cadre,
wherever
permissible,
cannot
be
converted into a notional date of entry into the Assistant Engineer cadre. However, correction of seniority
cannot
automatically
be
equated
with
cancellation of an elevation. 32.
The distinction is evident from paragraph 20(i) of the order
dated
04.12.2024,
wherein
this
Court
specifically recorded that the orders of appointment of the concerned employees as Assistant Engineers by Appointment By Transfer (ABT) or by applying the Elevation Scheme were not disturbed, subject to the directions issued therein. The direction contained in paragraph harmoniously
20(c) with
must the
therefore remaining
be
read
directions
in
paragraph. It cannot be isolated from the express protection
accorded
to
the
orders
of
appointment/elevation. The judgment requires the KPCL to ensure that the Elevation Scheme operates with a minimum qualifying period. It does not,
- 105 HC-KAR
however,
expressly
direct
that
every
employee
already elevated without such period is to be treated as having been illegally appointed or as having entered the Assistant Engineer cadre only upon completion of an additional period of five years. Nor does paragraph 20(c) itself prescribe the period of five years. The question whether the qualifying period to be applied in a particular case is five years must therefore be answered by reference to the applicable Service Rules, Standing Regulations and the Notification governing the relevant elevation. 33.
The KPCL relies upon SR-044 dated 31.03.1992, which, according to the KPCL, prescribes five years as the minimum qualifying service for promotion from one cadre to the next higher cadre. The existence of such a provision does not, by itself, establish that the same provision retrospectively governed every elevation made under SR-062. The petitioners' case is that their elevations were made
- 106 HC-KAR
under SR-062 dated 04.03.2003 and under the notifications applicable to their respective cases. The record further indicates that the five-year condition was
expressly
incorporated
in
subsequent
notifications, including those issued from the year 2014 onwards. 34.
The applicability of the five-year requirement must therefore be determined with reference to the service instrument governing the particular elevation. Where a
notification
governing
a
particular
elevation
expressly prescribed five years' qualifying service, the KPCL is bound to give effect to that condition. Conversely, where an employee was elevated under an earlier notification which did not contain such a condition, a subsequent notification cannot, merely by reason of its subsequent operation, be read retrospectively into the earlier completed elevation unless such retrospective operation is otherwise authorized by the governing Service Rules.
- 107 HC-KAR
35.
The
principle
is
particularly
important
where
retrospective application would not merely regulate future
eligibility
but
would
alter
the
legal
consequences of an elevation already completed. A subsequent service condition cannot ordinarily be employed retrospectively to deprive an employee of the
legal
consequences
of
an
appointment
or
promotion validly made under the conditions then applicable, unless the competent authority possesses lawful power to give such provision retrospective effect. 36.
The
Division
Bench
order
dated
13.11.2025
is
principally concerned with the impermissibility of assigning seniority in the Assistant Engineer cadre from a date anterior to actual entry into that cadre. It does not direct that an employee already elevated as Assistant Engineer must notionally be treated as having entered the cadre only five years after the date of such elevation.
- 108 HC-KAR
37.
Consequently, the KPCL cannot treat the direction to prescribe
minimum
qualifying
service
as
an
unrestricted authority to retrospectively rewrite the conditions governing every completed elevation. 38.
The distinction between seniority and substantive elevation assumes significance in the present case. If an employee entered the Assistant Engineer cadre on a
particular
date,
the
employee
cannot
claim
seniority in that cadre from an earlier date merely by relying upon service rendered as Junior Engineer. The appropriate consequence in such a case is correction of the seniority position. It would be a different matter if the KPCL were to hold that the employee had no right to occupy the post of Assistant Engineer at all until a later date because the employee had not completed five years of service.
Such
a
conclusion
would
amount,
in
substance, to postponing the employee's entry into the
Assistant
Engineer
cadre
and
would
have
- 109 HC-KAR
consequences
substantially
different
from
the
correction of seniority directed by this Court. The KPCL
must
therefore
keep
the
two
exercises
separate. The first is the correction of seniority in accordance with the judgments of this Court. The second is determination of eligibility for elevation with reference to the minimum qualifying service prescribed under the applicable service instrument. The
latter
cannot
be
used
as
a
means
of
retrospectively creating an anterior or deferred date of entry into the Assistant Engineer cadre unless such consequence is expressly authorised by the governing law. 39.
The contention that the present petitions amount to an impermissible review of W.P. No.11925 of 2012 cannot be accepted. Admittedly, the petitioners do not challenge the judgment dated 04.12.2024. They do not seek to revive any notional seniority anterior to their actual entry into the Assistant Engineer
- 110 HC-KAR
cadre. They accept the binding principle that the seniority of an Assistant Engineer cannot commence from a date anterior to actual entry into the cadre. Their
grievance
is
against
the
administrative
implementation of the said judgments, particularly the application of the five-year requirement to completed elevations. An administrative authority implementing a judicial decision must act within the scope of the decision and in accordance with the governing service rules. The finality of the earlier judgment does not prevent judicial review of an administrative action which is alleged to travel beyond the judgment or the applicable service rules. 40.
The
record
indicates
that
different
notifications
operated at different points of time. The significance of this cannot be overlooked. An employee whose elevation was governed by a notification expressly prescribing five years' qualifying service stands on a different footing from an employee whose elevation
- 111 HC-KAR
was completed under an earlier notification which did not contain such condition. The KPCL must therefore identify
the
applicable
notification
or
service
instrument before determining the consequence of the minimum qualifying service requirement in each case. A generalised approach treating every historical elevation under SR-062 as though it had been made under the same notification would fail to take into account
the
conditions.
temporal The
final
operation
of
the
service
seniority
exercise
must
consequently be undertaken with reference to the actual date of entry into the Assistant Engineer cadre, the source under which the employee was elevated and the service conditions applicable to that elevation. 41.
The petitioners have also questioned the opportunity afforded
by
the
KPCL
before
issuance
of
the
impugned Seniority list. From the material placed before the Court, it appears that objections were
- 112 HC-KAR
invited
to
the
provisional
seniority
list
dated
01.09.2025 and objections were submitted by the affected employees. In that view of the matter, the impugned
provisional
seniority
list
interfered
with
on
ground
solely
the
cannot that
be no
opportunity whatsoever was afforded. Nevertheless, since the list remains provisional, the KPCL shall, before finalization, ensure that an employee, whose seniority is proposed to be altered on the basis of the applicability
of
the
minimum
qualifying
service
requirement, is afforded an effective opportunity to place on record the relevant appointment/elevation order and the notification or service instrument governing such elevation. 42.
Therefore, this Court would hold that the judgment dated 04.12.2024 in W.P. No.11925 of 2012, as affirmed by the Division Bench on 13.11.2025, is binding upon the KPCL. The KPCL is required to prescribe and implement minimum qualifying service
- 113 HC-KAR
for the Elevation Scheme in terms of paragraph 20(c) of the judgment dated 04.12.2024. No employee can claim seniority in the Assistant Engineer cadre from a date anterior to his or her actual entry into that cadre. One-third weightage of service rendered in the feeder cadre, wherever otherwise permissible, cannot be utilised to confer retrospective seniority in the Assistant Engineer cadre. The requirement of minimum qualifying service for implementation of the Elevation Scheme is distinct from the question whether an elevation already completed under an earlier
governing
service
instrument
can
retrospectively be treated as invalid. The judgment dated
04.12.2024
cancellation
of
does
completed
not,
by
itself,
elevations
direct
under
the
Elevation Scheme or postponement of the actual date of entry into the Assistant Engineer cadre by five years. Where the five-year qualifying service requirement was expressly applicable to the service
- 114 HC-KAR
rule or notification governing a particular elevation, the same shall be given effect to in accordance with law. Where the applicable service instrument did not prescribe the five-year requirement, a subsequent notification
cannot,
merely
by
reason
of
its
subsequent operation, be retrospectively applied to invalidate or defer a completed elevation unless such retrospective
operation
authorized
the
by
is
otherwise
governing
service
specifically rules
or
mandated by a binding judicial direction. The final seniority exercise must therefore be undertaken with reference to the actual date of entry into the Assistant Engineer cadre and the Service Rules, Standing Regulations and notifications applicable to the particular employee or batch of employees at the relevant point of time. 43.
Having observed thus, this Court proceeds to pass the following order:
- 115 HC-KAR
ORDER (I) The writ petitions in W.P. No.3603 of 2026 and W.P. No.38357 of 2025 are
allowed
with
the
following
directions: (a)
The
impugned
revised
seniority
01.12.2025
provisional list-2
issued
dated
by
the
respondent – Karnataka Power Corporation
Limited
vide
Annexure-A in both the cases and, the final seniority list in No.A1P1A/1021
dated
12.06.2026
issued
by
respondent No.1 vide AnnexureL in W.P. No.38357 of 2025 are hereby quashed. (b)
The
Karnataka
Corporation
Power
Limited
shall
undertake
the
exercise
of
finalizing
the
seniority
of
Assistant
Engineers
afresh,
- 116 HC-KAR
strictly in conformity with the judgment
dated
passed
W.P.
in
04.12.2024 No.11925
of
2012 and the judgment dated 13.11.2025
passed
in
W.A.
No.548 of 2025 and connected matters. (c)
Any benefit of service rendered in the cadre of Junior Engineer, including
one-third
weightage
wherever otherwise permissible, shall be confined to the purpose for which such benefit is legally available
and
shall
not
be
utilised to confer retrospective seniority
in
the
Assistant
Engineer cadre. (d)
The
direction
contained
in
paragraph 20(c) of the judgment dated
04.12.2024
regarding
minimum qualifying service for implementation of the Elevation Scheme shall be given effect to.
- 117 HC-KAR
(e)
While
determining
the
applicability and consequences of
the
minimum
qualifying
service requirement, the KPCL shall examine the Service Rules, Standing Regulations and the Recruitment
/
Notifications
Elevation
governing
the
relevant elevation. (f) The KPCL shall not mechanically apply
a
qualifying
uniform service
retrospectively
five-year
requirement to
every
employee elevated under SR062
without
first
establishing
that such requirement governed the particular elevation or that retrospective
application
is
otherwise specifically authorized by the governing service Rule. Where the five-year requirement was expressly applicable to the recruitment
/
elevation
notification
governing
a
particular employee or batch,
- 118 HC-KAR
the KPCL shall give effect to the same in accordance with law. Where an employee was already elevated
under
a
service
instrument
which
did
not
prescribe
the
five-year
requirement,
the
subsequent
introduction of such requirement shall
not,
by
retrospectively invalidate
itself, to
the
operate
cancel
or
completed
elevation or to postpone the employee's actual date of entry into
the
Assistant
Engineer
cadre. (II)
It is made clear that this Court has neither reopened nor modified the judgment dated 04.12.2024 passed in W.P.
No.11925
of
2012
and
the
judgment dated 13.11.2025 passed in W.A. No.548 of 2025 and connected
- 119 HC-KAR
matters. The said judgments shall be implemented in letter and spirit. (III) The pending interlocutory applications, if any, shall stand disposed of. (IV) No order as to the costs; Sd/(ASHOK S. KINAGI) JUDGE
RK [online] List No.: 2 Sl No.: 32 Ct:pk